April 05 - 18:30
Committee of Adjustment - Panel 2
Adam and April Mills
To permit a reduced front yard setback for the construction of a one-storey addition and covered porch at the front of the dwelling.
(Agent: C. Miller)
Thomas Finlay
To permit reduced interior side yard setback and the distance between a principal dwelling and another building on the same lot.
(Agent: C. Miller)
Ottawa Catholic School Board
To permit a reduced front yard setback for the construction of a new elementary school.
(Agent: I. Richer)
(Chuqui Liang & Xiaobei li)
To permit a reduced rear yard setback for the construction of a second storey addition over a one-storey portion of the existing dwelling.
(Agent: C. Liang)
(13715809 Canada Inc.)
To subdivide the property into two separate parcels for a new semi-detached dwelling, with reduced lot areas and lot widths.
(Agent: M. Joudeh)
(13715809 Canada Inc.)
To subdivide the property into two separate parcels for a new semi-detached dwelling, with reduced lot areas and lot widths.
(Agent: M. Joudeh)
Sandy-Belle Ghossein & Roy Imad
To subdivide the property into two separate parcels of land for a proposed semi-detached dwelling, with secondary dwelling units.
(Agent: E.Ghossein)
2763072 Ontario Inc.
To subdivide the property into two separate parcels of land for the construction of a semi-detached dwelling with secondary dwelling units.
(Agent: J. Paoloni)
(14251211 Canada Inc.)
To permit a reduced lot width and no parking for a new semi-detached dwelling.
(Agent: C. Kubiseski)
(2606394 Ontario Inc.)
To permit a front-facing attached garage for a proposed semi-detached dwelling. The existing dwelling is to be demolished.
(Agent: P. Cooper)
(Hassan & Majida Harb)
To subdivide the property into two separate parcels of land for each half of the existing semi-detached dwelling.
(Agent: A. Johnston)
Adjourned from November 2, 2022, December 7, 2022, and February 1, 2023.
(Rafael Quijada and Anick Lavallee)
To permit reduced side, front yard, and rear yards and a reduced lot area for a six-unit low rise apartment building.
(Agent: P. Valiquet)
Adjourned from February 15, 2023.
(Ana Maria Tavares, Carlos & Cristina Macedo)
To subdivide the property into two lots for the construction of two new detached dwellings, with reduced lot widths and lot areas.
(Agent: P. Alves)
Adjourned from February 15, 2023.
(Ana Maria Tavares, Carlos & Cristina Macedo)
To subdivide the property into two lots for the construction of two new detached dwellings, with reduced lot widths and lot areas.
(Agent: P. Alves)
Adjourned from February 1 and March 15, 2023
(Stephen Norton & Emily Jamieson)
To subdivide the property into two separate parcels of land.
(Agent: S. Soor)
Remote Participation – Committee Members, Staff and General Public
Although in-person Committee of Adjustment hearings have been postponed until further notice, there are several ways in which the general public can participate in this electronic hearing.
The chosen technology for this hearing is Zoom (https://zoom.us/) which allows for participation by computers and mobile devices. To reduce the number of participants in the electronic hearing and to allow for a more efficient process, the gener... (cont)
Agenda