September 21 - 13:00
Committee of Adjustment - Panel 1
None.
Adjourned to October 5, 2022.
Adjourned Sine Die.
Adjourned to October 5, 2022.
Adjourned to October 5, 2022.
Adjourned to October 5, 2022.
Adjourned to October 5, 2022.
The following applications were heard.
(Leslie & Richard Kondejewski)
To sever the property into two separate parcels of land for the existing semi-detached dwelling.
(Agent: M. Segreto)
(Moda Development Corporation)
To subdivide the property into two separate parcels for an existing semi-detached dwelling.
(Agent: M. Staltaris)
(David McCabe & Alexandra Da Costa)
To subdivide the property into three parcels to construct three townhouse dwellings.
(Agent: J. Colliza)
(David McCabe & Alexandra Da Costa)
To subdivide the property into three parcels to construct three townhouse dwellings.
(Agent: J. Colizza)
(13098931 Canada Inc.)
To permit a reduced rear yard setback for bicycle sheds and increase the number of units permitted for a low-rise apartment building.
(Agent: R. Hill)
(Taylor Major Holdings Inc.)
To permit a medical facility use.
(Agent: B. Sinclair)
(2707120 Ontario Inc.)
To permit reduced setbacks for the rear yard and bicycle sheds, a reduced rear landscape buffer, and reduced parking for the construction of a low-rise apartment building.
(Agent: J. Harris)
(Andrew Blocka & Brigitte Leblanc-Lapointe)
To permit a front-facing attached garage
(Agent: S.Smith)
(Marlaina & Brian Loveys)
To permit reductions to lot area, percentage of windows, soft landscaping, and façade setback for the conversion of the dwelling into a triplex.
(Agent: M. Loveys)
(Devin and Stephanie Marhue)
To permit increased height and rear yard setback for the construction of a two-storey coach house in the rear yard.
(Agent: N. DeSanti)
Adjourned from September 7, 2022
(Mehrzad Ziai, Mehran Frohar, Ninava Ltd. & Henga Ottawa Realty Inc.)
To subdivide the property into two separate parcels for two new three-unit dwellings with reduced lot areas and lot widths.
(Agent: P. Robinson)
Adjourned from September 7, 2022
(Mehrzad Ziai, Mehran Frohar, Ninava Ltd. & Henga Ottawa Realty Inc.)
To subdivide the property into two separate parcels for two new three-unit dwellings with reduced lot areas and lot widths.
(Agent: P. Robinson)
Adjourned from September 7, 2022
(Sherbrooke Urban Developments Ltd.)
To subdivide the property in two for two new dwellings with front-facing garages, reduced lot widths and interior side yards and increased building height.
(Agent: J. D'Aoust)
Adjourned from September 7, 2022
(Sherbrooke Urban Developments Ltd.)
To subdivide the property in two for two new dwellings with front-facing garages, reduced lot widths and interior side yards and increased building height.
(Agent: J. D'Aoust)
Adjourned from September 7, 2022
(1576237 Ontario Inc.)
To permit two additional rooms in a 16-room rooming unit.
(Agent: M. Imeson)
None.
3:34 p.m.
Remote Participation – Committee Members, Staff and General Public
Although in-person Committee of Adjustment hearings have been postponed until further notice, there are several ways in which the general public can participate in this electronic hearing.
The chosen technology for this hearing is Zoom (https://zoom.us/) which allows for participation by computers and mobile devices. To reduce the number of participants in the electronic hearing and to allow for a more efficient process, the gener... (cont)
Agenda