Site Plan Control
Phased warehouse development
Addresses: 210 MAPLE CREEK Court, 215 MAPLE CREEK Court, 220 MAPLE CREEK CourtSite Plan Control
Construction of a new 10,000 sq ft (930sq m) warehouse building
Addresses: 2375 ST-LAURENT, BOULDemolition Control
The two-storey detached dwelling is proposed to be demolished due to its derelict state. The City of Ottawa issued an Order under the Property Standards Bylaw on May 11, 2017, instructing the owners to obtain a building permit in order to do the required repairs. The Order identifies evidence of deterioration and damage to walls, settlement of walls as well as broken windows, and requires that the owner provide a report by a licenced professional structural engineer as to the structural integrity of the entire building. Due to the eventuality of the site being redeveloped, the owner prefers to demolish the building.
Addresses: 93 BARRETTE StreetSite Plan Control
The proposed development includes a 28-storey mixed-use condominium tower with a total height of 86 metres. The development proposes 271 residential units, including seven ground-oriented attached dwellings, and 567 square metres of ground-oriented commercial space. Commercial entrances are proposed to front onto Somerset Street West, while the main residential entrance is proposed along Breezehill Avenue North. Five levels of underground parking, containing 244 parking spaces, are proposed to be accessed from the laneway along the western edge of the property.
Addresses: 1050 SOMERSET WEST StreetDemolition Control
The purpose of the Demolition Control Proposal is to permit the demolition of two existing dwellings known as 144-146 Nepean Street and 148 Nepean Street.
Addresses: 144 NEPEAN Street, 146 NEPEAN StreetSite Plan Control
New 7-storey mixed-use building in place of the existing two-storey office building.
Addresses: 83 HINTON NORTH AvenuePlan of Subdivision
The City of Ottawa has received a Draft Plan of Subdivision to revise an application to an existing draft approved Plan of Subdivision to create a new road connection through the adjacent properties to the south to provide a secondary road connection for the draft approved lands. The road connection would also serve as a servicing corridor for water service looping.
Addresses: 810 CEDARVIEW RoadSite Plan Control
New three storey Mixed-Used office building with two retail units on the ground floor and one office tenant on both the 2nd and 3rd floors
Addresses: 5514 MANOTICK MAIN StreetSite Plan Control
The Capital Region Resource Recovery Centre is a new integrated waste management facility proposed by Taggart Miller Environmental Services.
Addresses: 5471 BOUNDARY Road, 5471 BOUNDARY Road, 5575 BOUNDARY Road, 5575 BOUNDARY Road, 5613 BOUNDARY Road, 5613 BOUNDARY Road, 5508 FRONTIER Road, 5508 FRONTIER Road, 5554 FRONTIER Road, 5554 FRONTIER Road, 5570 FRONTIER Road, 5570 FRONTIER Road, 5610 FRONTIER Road, 5610 FRONTIER Road, 5800 FRONTIER Road, 5800 FRONTIER Road