Application Details
Number
D07-12-25-0004
Type
Site Plan Control
Indexed
August 22, 2025
Description
The City of Ottawa has received a Site Plan Control application to remove the existing car wash and construct a new 1263.2 square metre building that will four warehouse spaces and four accessory office spaces.
External Link
View application on ottawa.ca
Status History
August 22, 2025:
404_missing_data
August 22, 2025:
Active
Addresses
1386 GREELY Lane Osgoode
1394 GREELY Lane Osgoode
City Staff Contact
Jerrica Gilbert
jerrica.gilbert@ottawa.ca
613-580-2424 x16972
Documents
2025-08-21 - Application Summary
2025-08-06 - Zoning Confirmation Report Stamped
2025-08-06 - Site Servicing Plan
2025-08-06 - Site Plan Details
2025-08-06 - Site Plan
2025-08-06 - Servicing & SWM Report
2025-08-06 - Septic System
2025-08-06 - Retaining Wall Analysis Report
2025-08-06 - Pre-development Drainage Plan
2025-08-06 - Post-development Drainage Plan
2025-08-06 - Phase II ESA
2025-08-06 - Phase I ESA
2025-08-06 - Memo - Grande Retaining Wall - Global Stability Analysis
2025-08-06 - Landscape Plan
2025-08-06 - Hydrogeological Assessment Report
2025-08-06 - Grading Plan
2025-08-06 - Geotechnical Report
2025-08-06 - FIG 1 Grande Preliminary profile
2025-08-06 - Existing Conditions, Removals & Decommissioning Plan
2025-08-06 - Erosion and Sediment Control Plan
2025-08-06 - Elevations
2025-08-06 - Details and Schedule
2025-08-06 - Demolition Site Plan
2025-03-25- Site Lighting
2025-03-25- Existing Conditions, Removals and Decommissioning Plan
2025-03-25 Geotechnical Report
2025-03-25 - Zoning Confirmation Report
2025-03-25 - Site Servicing Study and Stormwater Management Report
2025-03-25 - Site Servicing Plan
2025-03-25 - Site Plan Details
2025-03-25 - Site Plan
2025-03-25 - Septic System C-2
2025-03-25 - Retaining Wall Design Concept
2025-03-25 - Pre-development Drainage Plan
2025-03-25 - Post-Development Drainage Plan
2025-03-25 - Phase Two Environmental Site Assessment
2025-03-25 - Phase One Environmental Site Assessment
2025-03-25 - Notes and Details C-9
2025-03-25 - Landscape Plan
2025-03-25 - Hydrogeological Report
2025-03-25 - Grading Plan
2025-03-25 - Geotechnical Report Unlocked
2025-03-25 - Erosion and Sediment Control Plan
2025-03-25 - Elevations
2025-03-25 - Details and Schedule C-8
2025-03-25 - Demolition Site Plan
2025-03-25 - Certificate of Surveyor
2025-03-25 - Surveyor's Real Property Report Pt 1
2025-01-21 - Zoning Confirmation Report
2025-01-21 - TIA Screening Form
2025-01-21 - Survey
2025-01-21 - Stormwater Management Report
2025-01-21 - Phase I Environmental Site Assessment
2025-01-21 - Phase 2 Environmental Site Assessment
2025-01-21 - Landscape Plan 1 & 2
2025-01-21 - Hydrogeological Assessment Report
2025-01-21 - Geotechnical Investigation Report
2025-01-21 - Civil Plans
2025-01-21 - Architectural Drawings