OttWatch
Announcements
DevApps
Meetings
Lobbying
TrafficCams
Transpo
Shop
D07-12-23-0080
Application Details
Number
D07-12-23-0080
Type
Site Plan Control
Indexed
July 06, 2023
Description
The City of Ottawa has received a Zoning By-law Amendment and Site Plan Control application to construct two commercial structures, one restaurant with a drive-through and one car wash facility.
External Link
View application on ottawa.ca
Status History
July 06, 2023:
Active
December 29, 2023:
File Pending
April 30, 2024:
Active
September 11, 2024:
Inactive
September 16, 2024:
Post Approval
October 09, 2024:
Active
October 16, 2024:
Post Approval
Addresses
5646 MANOTICK MAIN Street Rideau
5650 MANOTICK MAIN Street Rideau
City Staff Contact
Stephan Kukkonen
stephan.kukkonen@ottawa.ca
Documents
2023-06-27 - Tree Conservation Report
2023-06-27 - Topographic Plan
2023-06-27 - Site Servicing Plan
2023-06-27 - SERVICING and STORMWATER MANAGEMENT REPORT
2023-06-27 - REMOVALS, EROSION & SEDIMENT CONTROL PLAN
2023-06-27 - Phase II Environmental Site Assessment
2023-06-27 - GRADING AND DRAINAGE PLAN
2023-06-14 - Tree Conservation Report
2023-06-14 - Transportation Impact Assessment
2023-06-14 - Topographical Plan of Survey
2023-06-14 - Planning Rationale and Design Brief
2023-06-14 - Phase II Environmental Site Assessment
2023-06-14 - Phase I Environmental Site Assessment
2023-06-14 - Landscape Plan and Details
2023-06-14 - Designated Substances Survey 5650 Manotick Main St
2023-06-14 - Designated Substances Survey 5646 Manotick Main St
2023-06-14 - Civil Engineering Drawings
2023-06-14 - Assessment of Adequacy of Public Services Report
2023-06-14 - Architectural Drawing Set
2023-06-14 - Acoustic Assessment Report
2023-07-07 - Application Summary
2023-11-27 - Vehicle Tracking Drive-Through -
2023-11-27 - Vehicle Tracking Delivery -
2023-11-27 - Vehicle Tracking Car Wash
2023-11-27 - Tree Conservation Report -
2023-11-27 - Site Servicing Plan
2023-11-27 - Servicing and Stormwater Management Report -
2023-11-27 - REMOVALS, EROSION AND SEDIMENT CONTROL PLAN
2023-11-27 - Proposed Modifications - D07-12-23-008
2023-11-27 - Phase Two Environmental Site Assessment
2023-11-27 - Permit Set Plans -
2023-11-27 - Landscape Plans -
2023-11-27 - Grading and Drainage Plan
2023-11-27 - Geotechnical Investigation Report
2023-11-27 - Designated Substances Survey
2023-11-27 - Designated Substances Letter Report-
2024-03-08 - Vehicle Tracking Modifications
2024-03-08 - Vehicle Tracking Length
2024-03-08 - Vehicle Tracking Drive-Through
2024-03-08 - Vehicle Tracking Delivery
2024-03-08 - Tree Conservation Report
2024-03-08 - Site Servicing Plan
2024-03-08 - Site Plan
2024-03-08 - SEWAGE SYSTEM DESIGN
2024-03-08 - Servicing and Stormwater Management Report
2024-03-08 - SEPTIC IMPACT ASSESSMENT
2024-03-08 - Landscape Plan
2024-03-08 - GRADING AND DRAINAGE PLAN
2024-03-08 - GEOTECHNICAL INVESTIGATION REPORT
2024-03-08 - Erosion and Sediment and Control Plan
2024-03-08 - Acoustic Assessment Report
2024-03-08 - Vehicle Tracking Car Wash
2024-03-08 - Letter -Transportation Impact Assessment
2024-04-22 - Site Servicing Plan
2024-04-22 - Site Plan Existing, Proposed & Details
2024-04-22 - Servicing & SWM Report
2024-04-22 - Removals, Erosion & Sediment Control Plan
2024-04-22 - Landscape Plan
2024-04-22 - Grading & Drainage Plan
2024-07-16 - Tree Conservation Report
2024-07-16 - Site Servicing Plan
2024-07-16 - Site Plan
2024-07-16 - Site Lighting Certification Letter
2024-07-16 - SERVICING AND STORMWATER MANAGEMENT REPORT
2024-07-16 - Septic Impact Assessment
2024-07-16 - Removals Erosion and Sediment Control Plan
2024-07-16 - Landscape Plan
2024-07-16 - Grading and Drainage Plan
2024-07-19 - Soil and Groundwater Investigation Program
2024-07-19 - Remedial Soil Excavation
2024-08-08 - Site and Details Plans
2024-08-08 - Septic Impact Assessment
2024-08-08 - Landscape and Details Plan
2024-09-11 - Delegated Authority Report
2024-09-09 - Transportation impact assesment
2024-09-09 - Site Servicing Plan
2024-09-09 - Removals Erosion Sediment Control Plan
2024-09-09 - Proposed Site Plan
2024-09-09 - Phase 2 ESA
2024-09-09 - Landscape Plan
2024-09-09 - Grading and Drainage
2024-09-09 - Geotechnical Report
2024-09-09 - Existing Site Plan, Restaurant Elevations
2024-09-09 - Car wash Elevations
2024-10-23 - Delegated Authority Report REVISED-