Hydro One Networks Inc. new Operations Centre (OC) is to be constructed and the temporary modular office space and holding tank is to be removed. The design consists of a main building that has a central spine throiugh the different sectors of the building. The first section is the main office, which houses offices, workstations, meeting rooms, kitchennette and washroooms. This is followed by a warehouse section that is complete with racking, loading dock, lock up areas and mustering rooms. Then there is indoor truck parking and outdoor covering parking.