D07-12-14-0067
Application Details
Number
D07-12-14-0067
Type
Site Plan Control
Indexed
February 07, 2022
Description
to permit a multi-building retail shopping centre on a 6.5 hectare site. The development consist of twelve (12) separate, free-standing buildings with 757 parking spaces. There are two (2) buildings proposed to have dtrive through facilities.
External Link
View application on ottawa.ca
Status History
February 11, 2022:
File Pending
December 19, 2022:
Active
January 10, 2023:
Post Approval
Addresses
1420 EARL ARMSTRONG Road Gloucester
1424 EARL ARMSTRONG Road Gloucester
110 LAURIER Avenue WEST Gloucester
City Staff Contact
Kelby Lodoen Unseth
kelby.lodoenunseth@ottawa.ca
613-580-2424 x72852
Documents
December 2016Proposed Road Modification Earl Armstrong Road
December 2016 Truck and Traffic Plan
December 2016 Stormwater Management Report
December 2016 Stormwater Drainage
December 2016 Storm Drainage Plan
December 2016 Servicing Plan
December 2016 Servicing Design Brief and Stormwater Management
December 2016 Proposed Road Modification Limebank Road
December 2016 Plan Profile
December 2016 Notes and Details
December 2016 Master Site Plan
December 2016 Landscape Plan L3-1
December 2016 Landscape Plan 5
December 2016 Landscape Plan 3
December 2016 Landscape Plan 2
December 2016 Landscape Plan 1
December 2016 Landsacpe Plan 4
December 2016 Key Plan Roads
December 2016 Grading Plan
December 2016 External Drainage and Ditching Plan
December 2016 Erosion and Sediment Plan
December 2016 Elevations Building I
December 2016 Elevations Building H 2
December 2016 Elevations Building H 1
December 2016 Elevations Building C
December 2016 Electrical Site Plan 3
December 2016 Electrical Site Plan 1
December 2016 Electrical Site Plan
December 2016 Context Plan Roads
December 2016 Composite Utility Plan
Tree Conservation Report
Transportation Impact Study REVISED
Transportation Impact Study
Survey Plan
Stormwater Site Management Report
Stormwater Report & Engineering Plans Sub2
Site Servicing Study
Site Servicing Plan
Site Plan Sub2
Site Plan
Site Details sub2
Servicing Design Brief, Storm Report and Engineering Plans Sub2
Roadway Modification Design Plan
Planning Rationale
Phase II Environmental Site Assessment
Phase I Environmental Site Assessment
Overall Landscape Plan Sub2
Location Plan
Landscpe L1-23 Sub2
Landscape Plan
Landscape L1-5 Sub2
Landscape L1-4 Sub2
Landscape L1-2/3 Sub2
Landscape L1-2 Sub2
Grading & Drainage Plan
Geotechnical Study
Erosion and Sediment Control Plan
Environmental Impact Statement
Elevations Building H Sub2
Elevations Building E
Elevations Building C Sub2
Elevations - Renderings
Elevations - Building H
Elevations - Building E
Elevations - Building C
Elevation Building I Sub2
Electrical Plan Sub2
Archaeological Resource Assessment
Application Summary
December 2016Proposed Road Modification Earl Armstrong Road
Missing/broken document:
December 2016 Truck and Traffic Plan
Missing/broken document:
December 2016 Stormwater Management Report
Missing/broken document:
December 2016 Stormwater Drainage
Missing/broken document:
December 2016 Storm Drainage Plan
Missing/broken document:
December 2016 Servicing Plan
Missing/broken document:
December 2016 Servicing Design Brief and Stormwater Management
Missing/broken document:
December 2016 Proposed Road Modification Limebank Road
Missing/broken document:
December 2016 Plan Profile
Missing/broken document:
December 2016 Notes and Details
Missing/broken document:
December 2016 Master Site Plan
Missing/broken document:
December 2016 Landscape Plan L3-1
Missing/broken document:
December 2016 Landscape Plan 5
Missing/broken document:
December 2016 Landscape Plan 3
Missing/broken document:
December 2016 Landscape Plan 2
Missing/broken document:
December 2016 Landscape Plan 1
Missing/broken document:
December 2016 Landsacpe Plan 4
Missing/broken document:
December 2016 Key Plan Roads
Missing/broken document:
December 2016 Grading Plan
Missing/broken document:
December 2016 External Drainage and Ditching Plan
Missing/broken document:
December 2016 Erosion and Sediment Plan
Missing/broken document:
December 2016 Elevations Building I
Missing/broken document:
December 2016 Elevations Building H 2
Missing/broken document:
December 2016 Elevations Building H 1
Missing/broken document:
December 2016 Elevations Building C
Missing/broken document:
December 2016 Electrical Site Plan 3
Missing/broken document:
December 2016 Electrical Site Plan 1
Missing/broken document:
December 2016 Electrical Site Plan
Missing/broken document:
December 2016 Context Plan Roads
Missing/broken document:
December 2016 Composite Utility Plan
Missing/broken document:
Tree Conservation Report
Missing/broken document:
Transportation Impact Study REVISED
Missing/broken document:
Transportation Impact Study
Missing/broken document:
Survey Plan
Missing/broken document:
Stormwater Site Management Report
Missing/broken document:
Stormwater Report & Engineering Plans Sub2
Missing/broken document:
Site Servicing Study
Missing/broken document:
Site Servicing Plan
Missing/broken document:
Site Plan Sub2
Missing/broken document:
Site Plan
Missing/broken document:
Site Details sub2
Missing/broken document:
Servicing Design Brief, Storm Report and Engineering Plans Sub2
Missing/broken document:
Roadway Modification Design Plan
Missing/broken document:
Planning Rationale
Missing/broken document:
Phase II Environmental Site Assessment
Missing/broken document:
Phase I Environmental Site Assessment
Missing/broken document:
Overall Landscape Plan Sub2
Missing/broken document:
Location Plan
Missing/broken document:
Landscpe L1-23 Sub2
Missing/broken document:
Landscape Plan
Missing/broken document:
Landscape L1-5 Sub2
Missing/broken document:
Landscape L1-4 Sub2
Missing/broken document:
Landscape L1-2/3 Sub2
Missing/broken document:
Landscape L1-2 Sub2
Missing/broken document:
Grading & Drainage Plan
Missing/broken document:
Geotechnical Study
Missing/broken document:
Erosion and Sediment Control Plan
Missing/broken document:
Environmental Impact Statement
Missing/broken document:
Elevations Building H Sub2
Missing/broken document:
Elevations Building E
Missing/broken document:
Elevations Building C Sub2
Missing/broken document:
Elevations - Renderings
Missing/broken document:
Elevations - Building H
Missing/broken document:
Elevations - Building E
Missing/broken document:
Elevations - Building C
Missing/broken document:
Elevation Building I Sub2
Missing/broken document:
Electrical Plan Sub2
Missing/broken document:
Archaeological Resource Assessment
Missing/broken document:
Application Summary
Missing/broken document:
December 2016Proposed Road Modification Earl Armstrong Road
Missing/broken document:
December 2016 Truck and Traffic Plan
Missing/broken document:
December 2016 Stormwater Management Report
Missing/broken document:
December 2016 Stormwater Drainage
Missing/broken document:
December 2016 Storm Drainage Plan
Missing/broken document:
December 2016 Servicing Plan
Missing/broken document:
December 2016 Servicing Design Brief and Stormwater Management
Missing/broken document:
December 2016 Proposed Road Modification Limebank Road
Missing/broken document:
December 2016 Plan Profile
Missing/broken document:
December 2016 Notes and Details
Missing/broken document:
December 2016 Master Site Plan
Missing/broken document:
December 2016 Landscape Plan L3-1
Missing/broken document:
December 2016 Landscape Plan 5
Missing/broken document:
December 2016 Landscape Plan 3
Missing/broken document:
December 2016 Landscape Plan 2
Missing/broken document:
December 2016 Landscape Plan 1
Missing/broken document:
December 2016 Landsacpe Plan 4
Missing/broken document:
December 2016 Key Plan Roads
Missing/broken document:
December 2016 Grading Plan
Missing/broken document:
December 2016 External Drainage and Ditching Plan
Missing/broken document:
December 2016 Erosion and Sediment Plan
Missing/broken document:
December 2016 Elevations Building I
Missing/broken document:
December 2016 Elevations Building H 2
Missing/broken document:
December 2016 Elevations Building H 1
Missing/broken document:
December 2016 Elevations Building C
Missing/broken document:
December 2016 Electrical Site Plan 3
Missing/broken document:
December 2016 Electrical Site Plan 1
Missing/broken document:
December 2016 Electrical Site Plan
Missing/broken document:
December 2016 Context Plan Roads
Missing/broken document:
December 2016 Composite Utility Plan
Missing/broken document:
Tree Conservation Report
Missing/broken document:
Transportation Impact Study REVISED
Missing/broken document:
Transportation Impact Study
Missing/broken document:
Survey Plan
Missing/broken document:
Stormwater Site Management Report
Missing/broken document:
Stormwater Report & Engineering Plans Sub2
Missing/broken document:
Site Servicing Study
Missing/broken document:
Site Servicing Plan
Missing/broken document:
Site Plan Sub2
Missing/broken document:
Site Plan
Missing/broken document:
Site Details sub2
Missing/broken document:
Servicing Design Brief, Storm Report and Engineering Plans Sub2
Missing/broken document:
Roadway Modification Design Plan
Missing/broken document:
Planning Rationale
Missing/broken document:
Phase II Environmental Site Assessment
Missing/broken document:
Phase I Environmental Site Assessment
Missing/broken document:
Overall Landscape Plan Sub2
Missing/broken document:
Location Plan
Missing/broken document:
Landscpe L1-23 Sub2
Missing/broken document:
Landscape Plan
Missing/broken document:
Landscape L1-5 Sub2
Missing/broken document:
Landscape L1-4 Sub2
Missing/broken document:
Landscape L1-2/3 Sub2
Missing/broken document:
Landscape L1-2 Sub2
Missing/broken document:
Grading & Drainage Plan
Missing/broken document:
Geotechnical Study
Missing/broken document:
Erosion and Sediment Control Plan
Missing/broken document:
Environmental Impact Statement
Missing/broken document:
Elevations Building H Sub2
Missing/broken document:
Elevations Building E
Missing/broken document:
Elevations Building C Sub2
Missing/broken document:
Elevations - Renderings
Missing/broken document:
Elevations - Building H
Missing/broken document:
Elevations - Building E
Missing/broken document:
Elevations - Building C
Missing/broken document:
Elevation Building I Sub2
Missing/broken document:
Electrical Plan Sub2
Missing/broken document:
Archaeological Resource Assessment
Missing/broken document:
Application Summary
Missing/broken document:
December 2016Proposed Road Modification Earl Armstrong Road
Missing/broken document:
December 2016 Truck and Traffic Plan
Missing/broken document:
December 2016 Stormwater Management Report
Missing/broken document:
December 2016 Stormwater Drainage
Missing/broken document:
December 2016 Storm Drainage Plan
Missing/broken document:
December 2016 Servicing Plan
Missing/broken document:
December 2016 Servicing Design Brief and Stormwater Management
Missing/broken document:
December 2016 Proposed Road Modification Limebank Road
Missing/broken document:
December 2016 Plan Profile
Missing/broken document:
December 2016 Notes and Details
Missing/broken document:
December 2016 Master Site Plan
Missing/broken document:
December 2016 Landscape Plan L3-1
Missing/broken document:
December 2016 Landscape Plan 5
Missing/broken document:
December 2016 Landscape Plan 3
Missing/broken document:
December 2016 Landscape Plan 2
Missing/broken document:
December 2016 Landscape Plan 1
Missing/broken document:
December 2016 Landsacpe Plan 4
Missing/broken document:
December 2016 Key Plan Roads
Missing/broken document:
December 2016 Grading Plan
Missing/broken document:
December 2016 External Drainage and Ditching Plan
Missing/broken document:
December 2016 Erosion and Sediment Plan
Missing/broken document:
December 2016 Elevations Building I
Missing/broken document:
December 2016 Elevations Building H 2
Missing/broken document:
December 2016 Elevations Building H 1
Missing/broken document:
December 2016 Elevations Building C
Missing/broken document:
December 2016 Electrical Site Plan 3
Missing/broken document:
December 2016 Electrical Site Plan 1
Missing/broken document:
December 2016 Electrical Site Plan
Missing/broken document:
December 2016 Context Plan Roads
Missing/broken document:
December 2016 Composite Utility Plan
Missing/broken document:
Tree Conservation Report
Missing/broken document:
Transportation Impact Study REVISED
Missing/broken document:
Transportation Impact Study
Missing/broken document:
Survey Plan
Missing/broken document:
Stormwater Site Management Report
Missing/broken document:
Stormwater Report & Engineering Plans Sub2
Missing/broken document:
Site Servicing Study
Missing/broken document:
Site Servicing Plan
Missing/broken document:
Site Plan Sub2
Missing/broken document:
Site Plan
Missing/broken document:
Site Details sub2
Missing/broken document:
Servicing Design Brief, Storm Report and Engineering Plans Sub2
Missing/broken document:
Roadway Modification Design Plan
Missing/broken document:
Planning Rationale
Missing/broken document:
Phase II Environmental Site Assessment
Missing/broken document:
Phase I Environmental Site Assessment
Missing/broken document:
Overall Landscape Plan Sub2
Missing/broken document:
Location Plan
Missing/broken document:
Landscpe L1-23 Sub2
Missing/broken document:
Landscape Plan
Missing/broken document:
Landscape L1-5 Sub2
Missing/broken document:
Landscape L1-4 Sub2
Missing/broken document:
Landscape L1-2/3 Sub2
Missing/broken document:
Landscape L1-2 Sub2
Missing/broken document:
Grading & Drainage Plan
Missing/broken document:
Geotechnical Study
Missing/broken document:
Erosion and Sediment Control Plan
Missing/broken document:
Environmental Impact Statement
Missing/broken document:
Elevations Building H Sub2
Missing/broken document:
Elevations Building E
Missing/broken document:
Elevations Building C Sub2
Missing/broken document:
Elevations - Renderings
Missing/broken document:
Elevations - Building H
Missing/broken document:
Elevations - Building E
Missing/broken document:
Elevations - Building C
Missing/broken document:
Elevation Building I Sub2
Missing/broken document:
Electrical Plan Sub2
Missing/broken document:
Archaeological Resource Assessment
Missing/broken document:
Application Summary
Missing/broken document:
2022-10-31 - SIGNED DELEGATED AUTHORITY REPORT
Missing/broken document: 404
2022-10-31 - Approved SWM Drainage Plan
2022-10-31 - Approved Storm Drainage Area Plan
2022-10-31 - Approved Stage 2 Archaeological Assessment
2022-10-31 - Approved Servicing Plan
2022-10-31 - Approved Servicing Brief & SWM Report
2022-10-31 - Approved Proposed Storm Sewer to Replace Existing Ditch
2022-10-31 - Approved Notes & Details Drawing 5a of 11
2022-10-31 - Approved Notes & Details Drawing 5 of 8
2022-10-31 - Approved Landscape Plans
2022-10-31 - Approved Hydraulic Network Analysis Report
2022-10-31 - Approved Grading Plan
2022-10-31 - Approved External Storm Drainage Area and Off Site Ditching Plan
2022-10-31 - Approved Erosion & Sediment Control Plan
2022-10-31 - Approved Composite Utility Plan
2022-10-31 - Approved Building 'I' - Proposed Elevations
2022-10-31 - Approved Building 'H' - Proposed Elevations
2022-10-31 - Approved Building 'E' - Proposed Elevations
2022-10-31 - Approved Building 'C' - Proposed Elevations
2022-11-01 - SIGNED DELEGATED AUTHORITY REPORT
2022-10-31 - Approved Site Plan
2022-10-31 - Approved Roadway Modifications sheets