D07-16-11-0014

Plan of Subdivision: These proposals for subdivision and zoning would see the development of a plan of subdivision on 53 hectares north and south of Perth Street on the west side of the Village of Richmond. 600 to 700 single family homes with 9 metre minimum lot widths and 300 to 400 townhomes with 5 metre minimum lot widths are proposed. There would be 31 public streets, one park, open space along the water course and a storm water management facility created. The development would be serviced with a new municipal well and water system and connect to the existing City sanitary sewer system. NOTE The Ontario Municipal Board decision of June 23, 2014 amended the total unit count to approximately 750 units. View application on ottawa.ca

WardWard 21 - RIDEAU-GOULBOURN - Scott Moffatt
Received2011-07-27
Updated2019-03-25
Address (Zoning) 6335 PERTH (V2E[779r]-h)
6350 PERTH (RI)
Possibly related devapp(s) D02-02-11-0066 - Zoning By-law Amendment
D02-02-17-0065 - Zoning By-law Amendment
D07-16-19-0009 - Plan of Subdivision
D02-02-19-0030 - Zoning By-law Amendment
Possibly related by-laws 2017-294: A by-law of the City of Ottawa to amend By-law No. 2008-250 of the City of Ottawa to remove the holding symbol from part of the lands known municipally as 6350 Perth Street
2018-087: A by-law of the City of Ottawa to amend By-law No. 2008-250 to change the zoning of part of the lands known municipally 6350 Perth Street
Documents
Title Modified
2018-09-27 Construction plan 2018-09-27
2018-09-27 Handbook 2018-09-27
2018-09-27 IERS 2018-09-27
Martin Street Sanitary Sewer FEA 2018-09-05
2017-06-23 TIS Phase 1 2017-06-21
SWM Repiort rev 3 Drawing 6 2013-12-06
SWM Report rev 3 2013-12-06
SWM Report Rev 3 Drawing 1 2013-12-06
SWM Report rev 3 Drawing 2 2013-12-06
SWM Report rev 3 Drawing 3 2013-12-06
SWM Report rev 3 Drawing 4 2013-12-06
SWM Report rev 3 Drawing 5 2013-12-06
SWM Report rev 3 Drawing 7 2013-12-06
SWM Report rev 3 Drawing 8 2013-12-06
SWM Report rev 3 Drawing 9 2013-12-06
SWM Report rev 3 Figuer 13 2013-12-06
SWM Report rev 3 Figuire 15 2013-12-06
SWM Report rev 3 Figure 10 2013-12-06
SWM Report rev 3 Figure 11 2013-12-06
SWM Report rev 3 Figure 121 2013-12-06
SWM Report rev 3 Figure 14 2013-12-06
SWM Report rev 3 Figure 16 2013-12-06
SWM Report rev 3 Figure 17 2013-12-06
SWM Report rev 3 Figure 18 2013-12-06
SWM Report rev 3 Figure 19 2013-12-06
SWM Report rev 3 Figure 20 2013-12-06
SWM Report rev 3 Figure 21 2013-12-06
SWM Report rev 3 Figure 22 2013-12-06
SWM Report rev 3 Figure 5 2013-12-06
ROW Streetscape Concept 2013-11-13
Basement Depths 2013-11-05
Continuous Erosion Analysis 2013-11-05
Erosion Hazard Assessment 2013-11-05
Subsurfance Drainage and 100 Year flood analysis 2013-06-06
Developer Presentation Feb 13 2013 2013-04-19
February 13 Public Meeting 2013-04-19
Groundwater Vulnerability Report Final February 2013 2013-04-03
Memo - Sump Pump Design Hydraulics 2013-01-22
Memo - Sump Pump Detail 2013-01-22
Draft Plan of Subdivision Sub#2 2013-01-18
Drainage Report 2013-01-18
Grading Plan Sub#2 2013-01-18
Hydrogeological & Terrain Analysis Technical Memo 2013-01-18
Richmond Pump Station 2013-01-18
Transportation Overview 2013-01-18
Van Gaal Drain Realignment 2013-01-18
Revised Draft Plan #2 2012-11-16
Assessment of Subsurface Drainage & Analysis of 100 year flood event REVISED 2012-10-30
Erosion Report 2012-10-30
Revised Draft Plan 2012-10-30
Richmond Pump Station - Level of Service 2012-10-30
Tree Conservation Report Revised 2012-10-30
Peer Review Groundwater Vulnerability Study 2012-06-13
Revised SWM Report 2012-05-22
Advertisement 2012-05-02
Appendix 1 2012-05-02
Appendix 10 complete 2012-05-02
Appendix 2 2012-05-02
Appendix 3 2012-05-02
Appendix 4 2012-05-02
Appendix 5 2012-05-02
Appendix 5 complete 2012-05-02
Appendix 6 2012-05-02
Appendix 7 2012-05-02
Appendix 8 2012-05-02
Appendix 9 2012-05-02
Appendix A 2012-05-02
Appendix B 2012-05-02
Channelization-Berm Impact 2012-05-02
Conceptual SWM Plan Option 1 2012-05-02
Conceptual SWM Plan Option 1 (Drwg 3) 2012-05-02
Conceptual SWM Plan Option 2 2012-05-02
Conceptual SWM Plan Option 2 (drwg 4) 2012-05-02
Conceptual SWM Plan Option 3 (Drwg 5) 2012-05-02
Conceptual SWM Plan Option 3A 2012-05-02
Conceptual SWM Plan Option 3B 2012-05-02
Conceptual SWM Plan Option 3C 2012-05-02
Constraints Plan 2012-05-02
Cumulative Impact Assessment 2012-05-02
Existing Conditions Analysis Natural Sciences 2012-05-02
Existing Conditions Storm Drainage Plan 2012-05-02
Existing Conditions SWMHYMO Input Files 2012-05-02
Fig #1 2012-05-02
Fig #2 2012-05-02
Fig #3 2012-05-02
Fig #4 2012-05-02
Fish Habitat Report 2012-05-02
Floodline Draft Report 2012-05-02
Floodplain Volumes 2012-05-02
Grading Plan 2012-05-02
HEC-RAS Summary Printout 2012-05-02
Hydraulic Analysis 2012-05-02
Impact on Van Gaal Drain 2012-05-02
JESA Flows 2012-05-02
Nat Env Response Table 2012-05-02
Phosphorus Report 2012-05-02
Pond Operating Conditions 2012-05-02
Post Conditions 2012-05-02
Pre Conditions 2012-05-02
Preliminary Cut-Fill Grading Option 3A 2012-05-02
Preliminary Cut-Fill Grading Option 3B 2012-05-02
Preliminary Cut-Fill Grading Option 3C 2012-05-02
Preliminary HGL Analysis 2012-05-02
Preliminary Sanitary Sewer System 2012-05-02
Preliminary Storm Sewer System 2012-05-02
Proposed Conditions SWMHYMO Input Files 2012-05-02
Report Memo 2012-05-02
Response Table 2012-05-02
Revised Permit Letter 2012-05-02
RVCA Letter 2012-05-02
RVCA Supplementary Report 2012-05-02
SWM & Drainage Plan 2012-05-02
SWM Report 2012-05-02
Vision 2012-05-02
Water Budget Results 2012-05-02
Workplan 2012-05-02
Appendices A 2012-05-01
Appendix 10 2012-05-01
Assessment of Adequacy of Public Services & Site Servicing Study 2012-05-01
Culvert Memo 2012-05-01
Description of Files 2012-05-01
Draft Plan of Subdivision 2012-05-01
Fill impact on Jock River 2012-05-01
Flows 2012-05-01
Geotechnical Study #1 2012-05-01
Geotechnical Study #2 2012-05-01
Hydrogeological Analysis 2012-05-01
Impact Assessment - Appendix A 2012-05-01
Impact Assessment - Appendix B 2012-05-01
Impact Assessment Study 2012-05-01
Impact on Drain 2012-05-01
Output Files 2012-05-01
Phase 1 Environmental Site Assessment 2012-05-01
Planning Rationale 2012-05-01
Pond Cross Section #1 2012-05-01
Pond Cross Section #2 2012-05-01
Sanitary Plan 2012-05-01
SP7AJOCKB-sum 2012-05-01
SP7BJESAB-out 2012-05-01
SWM OPA Response 2012-05-01
SWM Output 2012-05-01
SWM Plan - Advertisement 2012-05-01
SWM Plan - Channelization 2012-05-01
SWM Plan - Fig #1 2012-05-01
SWM Plan - Fig #2 2012-05-01
SWM Plan - Fig #3 2012-05-01
SWM Plan - Fig #4 2012-05-01
SWM Plan - Letter 2012-05-01
SWM Plan - Report 2012-05-01
SWM Plan - Revised Permit Letter 2012-05-01
SWM Plan - RVCA report 2012-05-01
SWM Plan - Summary Printout 2012-05-01
SWM Plan Option #1 2012-05-01
SWM Plan Option #2 2012-05-01
SWM Plan Opton #3 2012-05-01
Table 1A 2012-05-01
Transportation Brief 2012-05-01
Tree Conservation Report 2012-05-01
Wellhead Protection Plan #1 2012-05-01
Wellhead Protection Plan #2 2012-05-01
Wellhead Protection Plan #3 2012-05-01
Wellhead Protection Plan #4 2012-05-01
D07-16-11-014 sp7bJESAB 2012-05-01
Date Status
2019-03-22 Agreement Registered - Securities Held
2013-11-26 OMB Pre-Hearing Held
2013-07-15 Appealed to OMB
2013-02-13 Application on Hold
2013-01-30 Notice of Public Meeting Sent

comments powered by Disqus
Created by Kevin O'Donnell to make it easier to be part of the political conversation in Ottawa.
On Twitter? Follow @OttWatch and @ODonnell_K
Privacy Policy