D07-12-20-0086

Site Plan Control: The existing two-storey U-Haul building is to remain, along with the three metal sheds and the existing parking lot. A new three-storey concrete and steel building is proposed in the south west corner of the property for a new self-storage warehouse. View application on ottawa.ca

WardWard 2 - INNES - Laura Dudas
Received2020-06-24
Updated2020-07-09
Address (Zoning) 3636 INNES (IL2 H(14))
Documents
Title Modified
03-30-2020 - Architectural Renderings and Elevations - 2020-07-08
03-30-2020 - Engineering Design Brief - 2020-07-08
03-30-2020 - Engineering Set of Drawings - 2020-07-08
03-30-2020 - General Plan of Services - 2020-07-08
03-30-2020 - Grading Plan - 2020-07-08
03-30-2020 - Landscape Notes - 2020-07-08
03-30-2020 - Landscape Plan - 2020-07-08
03-30-2020 - Letter - Planning Rational - 2020-07-08
03-30-2020 - Site Plan - 2020-07-08
03-30-2020 - Survey - 2020-07-08
03-30-2020 - TIA Screening Form - 2020-07-08
05-31-2020 - Geotechnical Report - 2020-07-08
06-30-2020 - Geotechnical Report, Revision 1 - 2020-07-08
Date Status
2020-07-10 On Circulation; Initial Submission Review
2020-07-07 Circulation Package Prepared

comments powered by Disqus
Created by Kevin O'Donnell to make it easier to be part of the political conversation in Ottawa.
On Twitter? Follow @OttWatch and @kevinodotnet
Privacy Policy