D07-12-20-0071

Site Plan Control: The propsed building is a mixed use builing; commercial space on main floor, two (2) apartment units on second floor, two (2) apartment units on thrird floor. View application on ottawa.ca

WardWard 17 - CAPITAL - Shawn Menard
Received2020-06-03
Updated2020-06-30
Address (Zoning) 172 MAIN (TM7[2182])
Documents
Title Modified
2020-06-04 - Architectural Package - 2020-06-30
2020-06-04 - Geotechnical Investigation - 2020-06-30
2020-06-04 - Grading and Erosion Control Plan - 2020-06-30
2020-06-04 - Landscape Plan - 2020-06-30
2020-06-04 - Noise Study - 2020-06-30
2020-06-04 - Notes and Legend Sheet - 2020-06-30
2020-06-04 - Phase 1 Environmental Site Assessment - 2020-06-30
2020-06-04 - Servicing and Stormwater Management Report - 2020-06-30
2020-06-04 - Site Plan - 2020-06-30
2020-06-04 - Site Servicing Plan - 2020-06-30
2020-06-04 - Storm Drainage Plan - 2020-06-30
2020-06-04 - Topographic Sketch - 2020-06-30
2020-06-29 - Application Summary - 2020-06-30
Date Status
2020-06-29 Circulation Package Prepared

comments powered by Disqus
Created by Kevin O'Donnell to make it easier to be part of the political conversation in Ottawa.
On Twitter? Follow @OttWatch and @kevinodotnet
Privacy Policy