D07-12-19-0169

Site Plan Control: The City of Ottawa has received a Site Plan Control application to permit the construction of a 1078 square metre, three-storey addition to the north fa├žade of Block B of the Mackenzie Building on the Carleton University campus. View application on ottawa.ca

WardWard 17 - CAPITAL - Shawn Menard
Received2019-10-08
Updated2020-01-24
Address (Zoning) 1125 COLONEL BY (I2A F(1.5))
Possibly related devapp(s) D07-12-13-0053 - Site Plan Control
D07-12-15-0079 - Site Plan Control
D07-12-15-0119 - Site Plan Control
D07-12-16-0191 - Site Plan Control
D07-12-17-0144 - Site Plan Control
D07-12-19-0205 - Site Plan Control
Documents
Title Modified
2020-01-23 - Details 1 of 4 - 2020-01-24
2020-01-23 - Details 2 of 4 - 2020-01-24
2020-01-23 - Details 3 of 4 - 2020-01-24
2020-01-23 - Details 4 of 4 - 2020-01-24
2020-01-23 - East Elevation - 2020-01-24
2020-01-23 - Erosion and Sediment Control & Grading Plan - 2020-01-24
2020-01-23 - Existing Stormwater Management - 2020-01-24
2020-01-23 - Landscape Details - 2020-01-24
2020-01-23 - Landscape Layout Plan - 2020-01-24
2020-01-23 - Level 200 Floor Plan - 2020-01-24
2020-01-23 - Level 300 Floor Plan - 2020-01-24
2020-01-23 - Level 400 Floor Plan - 2020-01-24
2020-01-23 - North Elevation - 2020-01-24
2020-01-23 - Phase 1 ESA - 2020-01-24
2020-01-23 - Proposed Stormwater Management Plan - 2020-01-24
2020-01-23 - Removals Plan - 2020-01-24
2020-01-23 - Site Plan - 2020-01-24
2020-01-23 - Site Servicing Plan - 2020-01-24
2020-01-23 - Stationary Noise Assessment - 2020-01-24
2020-01-23 - Traffic Noise Report - 2020-01-24
2020-01-23 - Tree Conservation and Removals Plan - 2020-01-24
2020-01-23 - West Elevation - 2020-01-24
2019-10-17 - Application Summary - 2019-10-21
2019-10-17 - Architectural Drawing Set - 2019-10-21
2019-10-17 - Details - 2019-10-21
2019-10-17 - Erosion and Sediment Control and Grading Plan - 2019-10-21
2019-10-17 - Geotechnical Report - 2019-10-21
2019-10-17 - Phase 1 ESA - 2019-10-21
2019-10-17 - Planning Rationale - 2019-10-21
2019-10-17 - Site Servicing Plan - 2019-10-21
2019-10-17 - Site Servicing Report - 2019-10-21
2019-10-17 - Site Survey Plan - 2019-10-21
2019-10-17 - Traffic Noise Report - 2019-10-21
2019-10-17 - Tree Conservation and Landscape Plan - 2019-10-21
Date Status
2020-01-21 Resubmission Received
2019-10-21 On Circulation; Initial Submission Review