D07-12-19-0061

Site Plan Control: The City of Ottawa has received a Site Plan application to permit the construction of a 25-storey mixed-use building with ground floor retail and 196 residential units above. The proposed development will be located on the southern portion of the lot and will be integrated with the existing hotel on the northern half of the property, which is proposed to remain on the site. View application on ottawa.ca

WardWard 14 - SOMERSET - Catherine Mckenney
Received2019-04-10
Updated2020-10-07
Address (Zoning) 88 ALBERT (MD S46)
Possibly related devapp(s) D07-12-17-0069 - Site Plan Control
D02-02-17-0053 - Zoning By-law Amendment
D07-05-19-0004 - Demolition Control
Documents
Title Modified
2020-08-12 - APPROVED Delegated Authority Report - 2020-10-07
2020-08-12 - APPROVED Dwg A 06 Elevation 1 and 2 - 2020-10-07
2020-08-12 - APPROVED Dwg A 07 Elevation 3 and 4 - 2020-10-07
2020-08-12 - APPROVED Dwg A01 Site Plan - 2020-10-07
2020-08-12 - APPROVED Erosion and Sediment Control Plan - 2020-10-07
2020-08-12 - APPROVED Site Grading and Drainage Plan - 2020-10-07
2020-08-12 - APPROVED Site Servicing Plan - 2020-10-07
2019-06-26 - UDRP Recommendations - 2020-02-24
2020-02-21 - Revised Noise Study - 2020-02-24
2020-02-21 - Revised Servicing Study - 2020-02-24
2020-02-21 - Revised Site Plan Floor Plans and Elevations - 2020-02-24
2020-02-21 - Revised TIA - 2020-02-24
2020-02-21 - Revised Wind Study - 2020-02-24
2019-05-06 - Application Summary - 2019-05-06
2019-05-03 - Design Brief - 2019-04-02
2019-05-03 - Elevations - 2019-04-02
2019-05-03 - Elevations 2 - 2019-04-02
2019-05-03 - Floor Plans - 2019-04-02
2019-05-03 - Floor Plans 2 - 2019-04-02
2019-05-03 - Floor Plans 3 - 2019-04-02
2019-05-03 - Floor Plans 4 - 2019-04-02
2019-05-03 - Planning Rationale - 2019-04-02
2019-05-03 - Section Drawing - 2019-04-02
2019-05-03 - Site Plan - 2019-04-02
2019-05-03 - Street Elevation - 2019-04-02
2019-05-03 - Streetview - 2019-04-02
2019-05-03 - Sunshade study - 2019-04-02
2019-05-03 - Erosion and Sediment Control Plan - 2019-04-01
2019-05-03 - Geotechnical Report - 2019-04-01
2019-05-03 - Grading and Drainage Plan - 2019-04-01
2019-05-03 - Phase 1 ESA - 2019-04-01
2019-05-03 - Sanitary Drainage Plan - 2019-04-01
2019-05-03 - Site Servicing Plan - 2019-04-01
2019-05-03 - Site Servicing Study - 2019-04-01
2019-05-03 - Stormwater Drainage Plan - 2019-04-01
2019-05-03 - Stormwater Management Report - 2019-04-01
2019-05-03 - TIA Strategy - 2019-04-01
2019-05-03 - Traffic Noise Study - 2019-04-01
2019-05-03 - Wind Study - 2019-04-01
2019-05-03 - TIA Forecasting - 2019-02-08
2019-05-03 - Survey - 2019-01-05
2019-05-03 - Survey 2 - 2019-01-05
2019-05-03 - Survey 3 - 2019-01-05
2019-05-03 - Survey 4 - 2019-01-05
2019-05-03 - TIA Scoping - 1 2019-01-05
2019-05-03 - TIA Screening Form - 2018-12-10
2019-05-03 - Survey 5 - 2018-04-25
Date Status
2020-10-06 Receipt of Agreement from Owner Pending
2020-08-10 Application Approved
2020-06-01 Applicant Concurs
2020-02-21 Application Reactivated
2019-05-07 Comment Period in Progress
2019-04-29 Community Heads Up - supporting documents to be posted later during circulation period