Site Plan Control: The hotel is proposed to be eight (8) storeys in height, and will contain 180 guest rooms. An enclosed pedestrian walkway is proposed to connect the hotel with the interior of the multi-storey parking garage. The ground floor is intended to accommodate the hotel lobby, as well as access to the pedestrian walkway. The top floor is reserved for meeting rooms and related uses for groups and conferences. The remaining floors will contain the guest rooms, with 30 rooms per floor. A vehicle drop-off area is proposed along Airport Parkway Private for hotel guests arriving by private vehicle. The drop-off area is delineated by means of a curb boulevard on the north side of the private way. Five lay-by spaces are proposed in the drop-off area, as well as one oversized stall for buses. Parking for hotel guests will be reserved in the short-term parking garage, at a rate of one space per guest unit. View application on ottawa.ca

WardWard 10 - GLOUCESTER-SOUTHGATE - Diane Deans
Received2019-03-27
Updated2019-04-15
Address (Zoning) 1085 AIRPORT PARKWAY (T1A)
1000 AIRPORT PARKWAY (T1A)
Documents
Title Modified
2019-04-12 - Application Summary - 2019-04-15
2019-04-11 - Context Plan - 2019-04-08
2019-04-11 - East and West Elevation - 2019-04-08
2019-04-11 - Elevation Cross Section - 2019-04-08
2019-04-11 - Floor Plans 0 to 1 - 2019-04-08
2019-04-11 - Floor Plans 2 to 8 - 2019-04-08
2019-04-11 - North Elevation - 2019-04-08
2019-04-11 - Pedestrian Way Elevation Section - 2019-04-08
2019-04-11 - Pedestrianway Plan - 2019-04-08
2019-04-11 - Roof Plan - 2019-04-08
2019-04-11 - SITE PLAN - 2019-04-08
2019-04-11 - South Elevation - 2019-04-08
2019-04-11 - Design Brief - 2019-04-01
2019-04-11 - Planning Rationale - 2019-04-01
2019-04-11 - Geotechnical Investigation - 2019-03-26
2019-04-11 - Landscape Plan - 2019-03-26
2019-04-11 - Tree Inventory, removals & Preservation Plan - 2019-03-26
2019-04-11 - Civil Plans - 2019-03-22
2019-04-11 - EIS - 2019-03-22
2019-04-11 - Phase 1 ESA - 2019-03-22
2019-04-11 - Site Servicing and SWM Report - 2019-03-22
2019-04-11 - Topographic Survey Plan - 2019-03-22
2019-04-11 - Transportation Impact Assessment - 2019-03-22
Date Status
2019-04-15 Comment Period in Progress
2019-04-03 Community Heads Up - supporting documents to be posted later during circulation period