D07-12-18-0177

Site Plan Control: The proposal is to construct a Starbucks coffee shop with associated drive-through on the vacant portion of the property. The building will have a gross floor area of 213.58 m2 (2,300 ft2). The drive-through will be located on the north side of the building and a 46 m2 outdoor patio will be located of the east side of the building. The existing entrance off the Bank Street will be maintained and the existing parking lot will be slightly modified and will include a total of 117 parking spaces. View application on ottawa.ca

WardWard 16 - RIVER - Riley Brockington
Received2018-11-26
Updated2019-01-10
Address (Zoning) 1910 BANK (AM1[1913])
Documents
Title Modified
2019-01-09 - Application Summary - 2019-01-10
2019-01-09 - Landscape Plans - 2018-12-21
2019-01-09 - TIA Certification - 2018-12-20
2019-01-09 - Transportation Impact Assessment - 2018-12-20
2019-01-09 - Watermain Analysis - 2018-12-20
2019-01-09 - Planning Rationale - 2018-11-26
2019-01-09 - Geotechnical Study - 2018-11-23
2019-01-09 - Phase 1 ESA - 2018-11-23
2019-01-09 - Phase 2 ESA - 2018-11-23
2019-01-09 - Stormwater Management and Servicing Brief - 2018-11-23
2019-01-09 - Survey Plan - 2018-11-23
2019-01-09 - Elevations - 2018-11-21
2019-01-09 - Grading Plan - 2018-11-21
2019-01-09 - Servicing Plan - 2018-11-21
2019-01-09 - Site Details - 2018-11-21
2019-01-09 - Site Plan - 2018-11-21
Date Status
2019-01-11 Comment Period in Progress
2019-01-08 Community Heads Up - supporting documents to be posted later during circulation period