D07-12-18-0149

Site Plan Control: The City of Ottawa has received a Site Plan Control application to permit a seven-storey residential building behind the retained two-storey commercial building along Bank Street. The proposal will include 160 dwelling units and two levels of underground parking with 117 vehicular spaces and 132 bicycle spaces. Access to the parking garage and a loading bay is to be from Fifth Avenue. View application on ottawa.ca

WardWard 17 - CAPITAL - Shawn Menard
Received2018-10-10
Updated2019-06-27
Address (Zoning) 99 FIFTH (TM[2506] S387)
Possibly related devapp(s) D02-02-17-0113 - Zoning By-law Amendment
Possibly related by-laws 2018-248: A by-law of the City of Ottawa to amend By-law No. 2008-250 of the City of Ottawa to change the zoning of the lands known municipally as 99 Fifth Avenue
Documents
Title Modified
2019-04-08 - Draft 4R-Plan 2019-04-09
2019-04-08 - Drawing Set 2019-04-09
2019-04-08 - Elevations 2019-04-09
2019-04-08 - Floor Plans 2019-04-09
2019-04-08 - LP, POPS, Details 2019-04-09
2019-04-08 - Renderings 2019-04-09
2019-04-08 - Site Plan 1 2019-04-09
2019-04-08 - Site Servicing Plan1 2019-04-09
2019-04-08 - Zoning Table 2019-04-09
2019-03-04 - Community Response Letter - 2019-03-04
2019-01-21 - Design Brief Revised - 2019-01-21
2019-01-21 - Erosion Plan - 2019-01-21
2019-01-21 - Height Map Markup - 2019-01-21
2019-01-21 - Landscape Plan and POPS - 2019-01-21
2019-01-21 - Loading Dock Letter - 2019-01-21
2019-01-21 - Phase II ESA - 2019-01-21
2019-01-21 - Site Grading Plan - 2019-01-21
2019-01-21 - Site Servicing Plan - 2019-01-21
2019-01-21 - Site Servicing SWM Report - 2019-01-21
2019-01-21 - Surveyor Area Certificate - 2019-01-21
2019-01-21 - TCR Report - 2019-01-21
2018-11-01 - Application Summary - 2018-11-01
BIL Application Summary - 2018-10-30
2018-10-12 - CHIS - 2018-10-29
2018-10-12 - Geotech - 2018-10-29
2018-10-19 - Servicing, SWM & Erosion Study - 2018-10-19
2018-10-19 - SP, Floor Plans, Elevations - 2018-10-19
2018-10-19 - SPC Cover Letter - 2018-10-19
2018-10-19 - Transportation Impact Assessment - 2018-10-19
2018-10-19 - UDRP Design Brief SPC - 2018-10-19
2018-10-12 - Landscape Plan - 2018-10-10
2018-10-12 - Phase I ESA - 2018-10-10
2018-10-12 - Phase II ESA - 2018-10-10
2018-10-12 - Stationary Noise Study - 2018-10-10
2018-10-12 - TCR - 2018-10-10
2018-10-12 - Traffic Noise Study - 2018-10-10
2018-10-12 - Wind Study - 2018-10-10
Date Status
2019-06-26 Application Approved
2018-11-05 Comment Period in Progress
2018-10-29 Community "Heads Up" - Completed

comments powered by Disqus
Created by Kevin O'Donnell to make it easier to be part of the political conversation in Ottawa.
On Twitter? Follow @OttWatch and @ODonnell_K
Privacy Policy