D07-12-18-0143

Site Plan Control: A Site Plan Control application has been submitted in order to construct four residential towers on two parcels. On the northern parcel, the proposal intends to contruct Tower 3 and Tower 4 of Petrie's Landing I, at heights of 22 floors and 18 floors, respectively. The southern parcel is to contain Tower 5a and 5b of Petrie's Landing I, at heights of 32 and 22 floors, respectively. A Rezoning application has been submitted to permit an increased maximum height for Tower 3 from the permitted 109.4m above sea-level (A.S.L.) to 127.9m A.S.L. and for Tower 4 from the permitted 109.4m A.S.L. to 113.1m A.S.L.. A maximum height increase has also been requested for Tower 5a and 5b from the permitted 101m to 158m and 127.9m, respectively. The Zoning By-law Amendment application also seeks permission to allow various commercial uses be permitted on the ground floor of Towers 5a and 5b, in order to provide a mixed-use building on the site & a reduction in minimum parking requirements for 5a & 5b View application on ottawa.ca

WardWard 1 - ORLÉANS - Matthew Luloff
Received2018-09-24
Updated2020-11-05
Address (Zoning) 8900 JEANNE D'ARC (R5A[2606] S406)
Possibly related devapp(s) D07-12-13-0248 - Site Plan Control
D02-02-14-0126 - Zoning By-law Amendment
D01-01-14-0025 - Official Plan Amendment
D02-02-18-0089 - Zoning By-law Amendment
Documents
Title Modified
2018-12-10 - Summary of Public Comments (1) - 2020-07-24
2019-05-28 - Blanding Turtle Correspondence MOE & Env. Planner 2020-07-24
2019-05-28 - Constr Access Plan Rev 2 Towers 3 & 4 2020-07-24
2019-05-28 - Detail Sheet Rev 2 2020-07-24
2019-05-28 - EIS and TCR Revised May 2019 2020-07-24
2019-05-28 - Erosion & Sed Control Plan Rev 2 Tower 5 2020-07-24
2019-05-28 - Erosion and Sed Control Plan Rev 2 Towers 3 & 4 2020-07-24
2019-05-28 - Landscape Plan Sheet 2 Rev 2 2020-07-24
2019-05-28 - Petrie's Design Loads Rev 2 2020-07-24
2019-05-28 - Ponding Areas Plan Rev 2 Tower 5 2020-07-24
2019-05-28 - Ponding Areas Plan Rev 2 Towers 3 & 4 2020-07-24
2019-05-28 - Rev 2 Grading Plan Towers 3 & 4 2020-07-24
2019-05-28 - Revised Geotech 2020-07-24
2019-05-28 - Servicing Report Rev 2 2020-07-24
2019-05-28 - Site Plan and Elevations Rev 2 - multiple pages 2020-07-24
2019-05-28 - Site Servicing Plan Rev 2 Tower 5 2020-07-24
2019-05-28 - Site Servicing Plan Rev 2 Towers 3 & 4 2020-07-24
2019-05-28 - Slope Stability Report Rev 21 2020-07-24
2019-05-28 - Storm Drainage Plan Rev 2 2020-07-24
2019-05-28 - Sun Shadow Impact Study Rev 2 2020-07-24
2019-05-28 - Topographical Plan Rev 2 2020-07-24
2019-05-28 - Traffic Noise Study Rev 2 2020-07-24
2019-05-28 - Transportation Report Rev 2 2020-07-24
2019-05-28 - Transportation Report Rev 2 Appendices 2020-07-24
2019-05-28 - Wind Study Addendum 2020-07-24
2019-05-28 - Wind Study Rev 2 2020-07-24
2019-05-28- Electrical Plan Rev 2 2020-07-24
2020-04-02 - Approved Basement 1 - Tower 3 A202-1 - 2020-07-24
2020-04-02 - Approved Basement 2 - Tower 3 A201-1- 2020-07-24
2020-04-02 - Approved Basement 2 - Tower 4 A201-2 - 2020-07-24
2020-04-02 - Approved Basement 2 - Tower 5a A201-3 - 2020-07-24
2020-04-02 - Approved Basement 2 - Tower 5b A201-4 - 2020-07-24
2020-04-02 - Approved Basement 3 - Tower 5b A200-2 - 2020-07-24
2020-04-02 - Approved Basement 3 -Tower 5a A200-1 - 2020-07-24
2020-04-02 - Approved Electrical Plan - 2020-07-24
2020-04-02 - Approved Fire Dept Site Plan A100 b - 2020-07-24
2020-04-02 - Approved Landscape Plan L1 01 - 2020-07-24
2020-04-02 - Approved Landscape Plan L1 02 - 2020-07-24
2020-04-02 - Approved Pedestrian Plan A101 - 2020-07-24
2020-04-02 - Approved Project Information Tables A102 - 2020-07-24
2020-04-02 - Approved Site Plan A100 - 2020-07-24
2020-04-02 - Approved Site Plan A100-1 - 2020-07-24
2020-04-02 - Approved Site Plan A100-2 - 2020-07-24
2020-04-02 - Approved Site Plan A100-3 - 2020-07-24
2020-04-02 - Approved Site Plan A100-4 - 2020-07-24
2020-04-06 - Approved Basement 1 - Tower 4 - 2020-07-24
2020-04-06 - Approved Basement 1 - Tower 5a - 2020-07-24
2020-04-06 - Approved Basement 1 - Tower 5b - 2020-07-24
2020-04-06 - Approved Construction Access Plan Towers 3 & 4 C202 - 2020-07-24
2020-04-06 - Approved Detail Sheet C700 - 2020-07-24
2020-04-06 - Approved Elevations Phase 3 A401 - 2020-07-24
2020-04-06 - Approved Elevations Phase 3 A402 - 2020-07-24
2020-04-06 - Approved Elevations Phase 4 A403 - 2020-07-24
2020-04-06 - Approved Elevations Phase 4 A404 - 2020-07-24
2020-04-06 - Approved Elevations Phases 5a & 5b A405 - 2020-07-24
2020-04-06 - Approved Elevations Phases 5a & 5b A406 - 2020-07-24
2020-04-06 - Approved Elevations Phases 5a & 5b A407 - 2020-07-24
2020-04-06 - Approved Elevations Phases 5a & 5b A408 - 2020-07-24
2020-04-06 - Approved Erosion & Sediment Control Plan Towers 3 & 4 C300 - 2020-07-24
2020-04-06 - Approved Erosion & Sediment Control Plan Towers 5a & 5b C301 - 2020-07-24
2020-04-06 - Approved General Elevations A400 - 2020-07-24
2020-04-06 - Approved General Sections A300 - 2020-07-24
2020-04-06 - Approved MUP Grading Plan C203 - 2020-07-24
2020-04-06 - Approved MUP Grading Plan C204 - 2020-07-24
2020-04-06 - Approved Site Grading Plan Towers 3 & 4 C200 - 2020-07-24
2020-04-06 - Approved Site Grading Plan Towers 5a & 5b C201 - 2020-07-24
2020-04-06 - Approved Site Servicing Plan Towers 3 & 4 C100 - 2020-07-24
2020-04-06 - Approved Site Servicing Plan Towers 5a & 5b C101 - 2020-07-24
2020-04-06 - Approved Storm Drainage Plan C400 - 2020-07-24
2020-04-06 - Approved Storm Ponding Plan Towers 3 & 4 C401- 2020-07-24
2020-04-06 - Approved Storm Ponding Plan Towers 5a & 5b C402 - 2020-07-24
2020-04-06 - Signed Delegated Authority Report - 2020-07-24
23Jul2019 3RD Submission Package - C100 - Site Servicing Plan Towers 3 & 4 2020-07-24
30Jul2019 3RD Submission Package - C200 - MUP Grading Plan 2020-07-24
30Jul2019 3RD Submission Package - C200 - Site Grading Plan Towers 3 & 4 2020-07-24
30Jul2019 3RD Submission Package - C200 - TIA Report 2020-07-24
30Jul2019 3RD Submission Package - C201 - Site Grading Plan Tower 5 2020-07-24
30Jul2019 3RD Submission Package - C202 - Construction Access Plan Towers 3 & 4 2020-07-24
30Jul2019 3RD Submission Package - C204 - MUP Grading Plan Part 2 2020-07-24
30Jul2019 3RD Submission Package - C300 - Erosion & Sediment Control Plan Towers 3 & 4 2020-07-24
30Jul2019 3RD Submission Package - C301 - Erosion & Sediment Control Plan Tower 5 2020-07-24
30Jul2019 3RD Submission Package - C400 - Storm Drainage Plan 2020-07-24
30Jul2019 3RD Submission Package - C401 - Storm Ponding Plan Towers 3 & 4 2020-07-24
30Jul2019 3RD Submission Package - C402 - Storm Ponding Plan Tower 5 2020-07-24
30Jul2019 3RD Submission Package - C700 - Civil Detail Sheet 2020-07-24
30Jul2019 3RD Submission Package - Electrical Site Plan 2020-07-24
30Jul2019 3RD Submission Package - Electrical Site Plan 2 2020-07-24
30Jul2019 3RD Submission Package - Geotechnical Report 2020-07-24
30Jul2019 3RD Submission Package - Landscape Plan Sheet 1 2020-07-24
30Jul2019 3RD Submission Package - Site Plan, elevations, floor plans, cross sections 2020-07-24
30Jul2019 3RD Submission Package - SWM & Servicing Report 2020-07-24
30July2019 3RD Submission Package - C100 - Site Servicing Plan Tower 5 2020-07-24
Rapport sur ce qui a été dit en français 2020-07-24
2018-11-08 - Application Summary (Amended) - 2018-11-08
2018-10-12 - Planning Rationale - 2018-10-26
2018-10-24 - Application Summary - 2018-10-24
2018-10-12 - Topographical Survey - 2018-10-11
2018-10-12 - EIS & Tree Conservation Report - 2018-09-24
2018-10-12 - Geotechnical Investigation - 2018-09-14
2018-10-12 - Landscape Plan 1 - 2018-09-12
2018-10-12 - Landscape Plan 2 - 2018-09-12
2018-10-12 - Site Plans, Elevations & Drawings - D07-02-18-0143 2018-09-11
2018-10-12 - Transportation Impact Assessment - 2018-08-20
2018-10-12-Planning Rationale- 2018-08-16
2018-10-12 - Shadow Impact Study - 2018-07-18
2018-10-12 - Traffic Noise Assessment - 2018-07-18
2018-10-12 - Wind Study - 2018-07-18
2018-10-12 - Phase One Environmental Site Assessment - 2018-07-16
2018-10-12 - Survey Plan - 2017-10-10
2018-10-12 - Archaeological Assessment - 2013-12-16
Date Status
2020-11-04 Agreement Registered - Securities Held
2020-09-30 Agreement Package Received from Owner
2020-07-23 Receipt of Agreement from Owner Pending
2018-11-30 Application File Pending
2018-10-25 Comment Period in Progress
2018-10-22 Community "Heads Up" - Completed