D07-12-18-0122

Site Plan Control: This is Phase 2 of the redevelopments of the lands which includes the construction of a 20 storey residential building with 208 units and 3 levels of underground parking (169 spaces total) View application on ottawa.ca

WardWard 11 - BEACON HILL-CYRVILLE - Tim Tierney
Received2018-08-10
Updated2019-03-21
Address (Zoning) 2280 CITY PARK (TD2[2350] H(65))
Possibly related devapp(s) D02-02-15-0086 - Zoning By-law Amendment
D07-12-15-0187 - Site Plan Control
D02-02-18-0078 - Zoning By-law Amendment
D07-16-18-0031 - Plan of Subdivision
Possibly related by-laws 2016-250: A by-law of the City of Ottawa to amend By-law No. 2008-250 of the City of Ottawa to change the zoning of part of the lands known municipally as 2280 City Park Drive.
Documents
Title Modified
2nd Submission - Revised TIA 2019-02-06
2nd Submission - Revised Civil Plans 2018-11-16
2nd Submission - Revised Landscape Plan 2018-11-16
2nd Submission - Revised Master Site Plan 2018-11-16
2nd Submission - Revised Noise & Vibration Report 2018-11-16
2nd Submission - Revised Parking Garage Plans 2018-11-16
2nd Submission - Revised Sections 2018-11-16
2nd Submission - Revised Shadow Study 2018-11-16
2nd Submission - Revised Site Plan - Phase 2 2018-11-16
2nd Submission - Revised Wind Study 2018-11-16
2nd Submission - Revised Design Brief 2018-11-15
2nd Submission - Revised Elevations1 2018-11-15
2nd Submission - Revised Floor Plans1 2018-11-15
2nd Submission - Revised Site Lighting Letter 2018-11-15
Planning Rationale, 2280 City Park 2018-08-30
TIA Report, 2280 City Park 2018-08-28
Building Elevations, 2280 City Park 2018-08-16
Building Section, 2280 City Park 2018-08-16
Design Brief, 2280 City Park 2018-08-16
Engineering Plans, 2280 City Park 2018-08-16
Geotechnical Study Addendum, 2280 City Park 2018-08-16
Geotechnical Study, 2280 City Park1 2018-08-16
Ground Heat Exchanger Borehole Layout, 2280 City Park 2018-08-16
Landscape & Site Plan, 2280 City Park 2018-08-16
Level 1 Floor Plan, 2280 City Park 2018-08-16
Level 1 Ground Floor Plan, 2280 City Park 2018-08-16
Level 14 Floor Plan, 2280 City Park 2018-08-16
Level 2 Floor Plan, 2280 City Park 2018-08-16
Level 3 Floor Plan, 2280 City Park 2018-08-16
Level 5 Floor Plan, 2280 City Park 2018-08-16
Level P1 - Parking, 2280 City Park 2018-08-16
Level P2 - Parking, 2280 City Park 2018-08-16
Level P3 - Parking, 2280 City Park 2018-08-16
Master Concept Plan, 2280 City Park 2018-08-16
Noise & Vibration Study, 2280 City Park 2018-08-16
Penthouse Floor Plan, 2280 City Park 2018-08-16
Phase I ESA Update, 2280 City Park 2018-08-16
Phase I ESA, 2280 City Park 2018-08-16
Preliminary Pedestrian Level Wind Study, 2280 City Park 2018-08-16
Roof Top Terrace Floor Plan , 2280 City Park 2018-08-16
Site Plan, 2280 City Park 2018-08-16
Sun Shadow Study, 2280 City Park 2018-08-16
Survey Plan, 2280 City Park 2018-08-16
Wind & Noise Addendum, 2280 City Park 2018-08-16
Date Status
2019-03-18 Request for Agreement Received
2019-02-05 Councillor Concurs
2018-10-11 Application File Pending
2018-08-31 Community "Heads Up" - Completed

comments powered by Disqus
Created by Kevin O'Donnell to make it easier to be part of the political conversation in Ottawa.
On Twitter? Follow @OttWatch and @ODonnell_K