Site Plan Control: The City of Ottawa has received a Site Plan Control application to permit a three-storey low-rise apartment dwelling with twenty-five dwelling units. A driveway on the west side of the site is proposed to access seven vehicular surface parking spaces in the rear yard. View application on ottawa.ca

WardWard 13 - RIDEAU-ROCKCLIFFE - Rawlson King
Received2017-12-22
Updated2019-07-15
Address (Zoning) 326 DONALD (R4N)
324 DONALD (R4N)
Documents
Title Modified
2019-03-01 - SIGNED DAR 2019-03-05
2018-06-01 - Rear Elevation 2019-03-05
2018-06-01 - Basement Floor Plan 2019-03-05
2019-03-01 - SIGNED Erosion Plan 2019-03-01
2019-03-01 - SIGNED Front Elevation 2019-03-01
2019-03-01 - SIGNED Grading Plan 2019-03-01
2019-03-01 - SIGNED Landscape Design 2019-03-01
2019-03-01 - SIGNED Left Elevation 2019-03-01
2019-03-01 - SIGNED Rear Elevation 2019-03-01
2019-03-01 - SIGNED Right Elevation 2019-03-01
2019-03-01 - SIGNED Site Plan 2019-03-01
2018-06-01 - Revised Planning Rationale 2018-06-14
2018-06-01 - Front Elevation 2018-05-31
2018-06-01 - Left Elevation 2018-05-31
2018-06-01 - Right Elevation 2018-05-31
2018-06-01 - Second Floor Plan 2018-05-31
2018-06-01 - Site Plan 2018-05-31
2018-06-01 - Third Floor Plan 2018-05-31
2018-06-01 - Erosion Plan 2018-05-30
2018-06-01 - Geotech Report 2018-05-30
2018-06-01 - Geotech Report II 2018-05-30
2018-06-01 - Ground Floor Plan 2018-05-30
2018-06-01 - Landscape Design 2018-05-30
2018-06-01 - Serviceability Report 2018-05-30
2018-06-01 - Storm Drainage Report 2018-05-30
2018-06-01 - TCR 2018-05-30
2018-06-01 - Survey 2018-05-08
2018-01-19 - Scoped EIS 2018-01-24
Scanned SPC form - 2 2018-01-24
2017-12-22 - Planning Rationale 2018-01-15
2017-12-22 - Basement Floor Plan 2017-12-22
2017-12-22 - Site Plan 2017-12-22
2017-12-22 - Erosion 2017-12-21
2017-12-22 - Geotech 2017-12-21
2017-12-22 - Grading and Servicing 2017-12-21
2017-12-22 - Landscape Design 2017-12-21
2017-12-22 - Noise Study 2017-12-21
2017-12-22 - Phase I ESA 2017-12-21
2017-12-22 - Seriveability Report 2017-12-21
2017-12-22 - Front Elevation 2017-11-30
2017-12-22 - Ground Floor Plan 2017-11-30
2017-12-22 - Left Elevation 2017-11-30
2017-12-22 - Rear Elevation 2017-11-30
2017-12-22 - Right Elevation 2017-11-30
2017-12-22 - Second Floor Plan 2017-11-30
2017-12-22 - Third Floor Plan 2017-11-30
Date Status
2019-07-12 Agreement Registered - Final Legal Clearance Given
2019-05-07 Receipt of Agreement from Owner Pending
2019-03-04 Request for Agreement Received
2018-01-31 Comment Period in Progress
2018-01-24 Community "Heads Up" - Completed