D07-12-17-0142

Site Plan Control: phase 2, 2 new buildings View application on ottawa.ca

WardWard 19 - CUMBERLAND - Stephen Blais
Received2017-11-03
Updated2018-03-21
Address (Zoning) 2025 MER-BLEUE, CHEMIN DE LA (AM[2413] H(21))
Possibly related devapp(s) D07-12-16-0121 - Site Plan Control
Documents
Title Modified
2018-03-20 - Site Servicing and Stormwater Management Report Rev 5 - 2018-03-21
2018-03-20 - Storm Drainage Plan Rev 11 - 2018-03-21
2018-03-20 - Survey 4R-2870 - 2018-03-21
2018-03-20 - Sanitary Drainage Plan Rev 11 - 2018-03-21
2018-03-20 - Site Plan SA-002B - 2018-03-21
2018-03-20 - Site Servicing Plan Rev 11 - 2018-03-21
2018-03-20 - Photometric Plan - 2018-03-21
2018-03-20 - Rev Appendix A - Water Supply Servicing - 2018-03-21
2018-03-20 - Letter, Roof Drain - 2018-03-21
2018-03-20 - Notes and Legend Rev 11 - 2018-03-21
2018-03-20 - Phasing Sie Plan SA-002A - 2018-03-21
2018-03-20 - Grading Plan Rev 11 - 2018-03-21
2018-03-20 - Landscape Plan Rev 4 - D07-12-017-0142 2018-03-21
2018-03-20 - Letter to the File Lead - 2018-03-21
2018-03-20 - Detail Sheet Rev 11 - 2018-03-21
2018-03-20 - Erosion Control and Detail Sheet Rev 11 - 2018-03-21
2018-03-20 - Geotech Report Rev 2 - 2018-03-21
2018-03-20 - Bldg l Colour Elevations - 2018-03-21
2018-03-20 - Bldg N Colour Elevations - 2018-03-21
2018-03-20 - Bldg M Colour Elevation - 2018-03-21
2017-11-28 - Application Summary - 2017-11-28
2017-11-28 - Archaeological Resource Assessment - 2017-11-28
2017-11-28 - Architectural Building Elevation Drawings L - 2017-11-28
2017-11-28 - Architectural Building Elevation Drawings M - 2017-11-28
2017-11-28 - Architectural Building Elevation Drawings N - 2017-11-28
2017-11-28 - Architectural Building Elevation Drawings-Revised Elevations - 2017-11-28
2017-11-28 - Erosion and Sediment Control Plan - 2017-11-28
2017-11-28 - Geotechnical Study - 2017-11-28
2017-11-28 - Grade Control and Drainage Plan - 2017-11-28
2017-11-28 - Landscape Colour Concept - 2017-11-28
2017-11-28 - Landscape Plan - 2017-11-28
2017-11-28 - Location Map - 2017-11-28
2017-11-28 - Notes and Legends - 2017-11-28
2017-11-28 - Overall Plan - 2017-11-28
2017-11-28 - Phase I Environmental Site Assessment - 2017-11-28
2017-11-28 - Planning Rationale - 2017-11-28
2017-11-28 - ROW Geotech Report - 2017-11-28
2017-11-28 - Sanitary Drainage Plan - 2017-11-28
2017-11-28 - Servicing Report - 2017-11-28
2017-11-28 - Servicing Report Appendix - 2017-11-28
2017-11-28 - Site Drainage Plan - 2017-11-28
2017-11-28 - Site Plan - 2017-11-28
2017-11-28 - Site Servicing Plan - 2017-11-28
2017-11-28 - Transportation Brief - 2017-11-28
2017-11-28 - Tree Conservation Report - 2017-11-28
Date Status
2018-03-13 Application Reactivated
2017-12-01 Comment Period in Progress
2017-11-29 Community "Heads Up" - Completed