Site Plan Control: The 31,121-square metre site that is proposed to be occupied by three buildings, two of them being Blocks 6 and 7 intended to accommodate 79 and 92 residential condos units respectively, and the third one being Block 8 intended to accommodate a 93 unit retirement home. Blocks 6 and 7 are part of Phase 2, while Block 8 is part of Phase 3. The new buildings have been oriented to present a façade along Regional Road 174. The proposal also calls for the creation of surface and underground parking spaces. View application on ottawa.ca

WardWard 1 - ORLÉANS - Bob Monette
Received2017-07-05
Updated2018-10-04
Address (Zoning) 8466 JEANNE D'ARC (O1)
Documents
Title Modified
2nd Submission - Site Servicing & SWM Report 2018-10-04
2nd Submission - Erosion Control Plan & Detail Sheet 2018-10-04
2nd Submission - Geotechnical - Letter to City with Responses 2018-02-08
2nd Submission - Geotechnical - Memo Feb 7 2018-02-08
2nd Submission - Geotechnical - Grading Plan Review1 2018-02-05
2nd Submission - Scupper Response1 2018-02-05
2nd Submission - Landscape Plan2 2018-01-30
2nd Submission - Site Plan1 2018-01-30
2nd Submission - Erosion Control and Detail Sheet Plan 2018-01-23
2nd Submission - Existing Conditions & Removals Plan1 2018-01-23
2nd Submission - Grading Plan1 2018-01-23
2nd Submission - Notes & Legend Plan 2018-01-23
2nd Submission - Sanitary Drainage Plan1 2018-01-23
2nd Submission - Site Servicing and SWM Report 2018-01-23
2nd Submission - Site Servicing Plan1 2018-01-23
2nd Submission - Storm Drainage Plan1 2018-01-23
2nd Submission - Noise Letter1 2017-12-14
2nd Submission - Geotechnical - Stone Retaining Wall Design 2017-12-07
2nd Submission - Noise Study 2017-09-25
2017-08-11 - Architectural Building Elevation Drawings 1- 2017-08-11
2017-08-11 - Architectural Building Elevation Drawings 2 - 2017-08-11
2017-08-11 - Erosion Control Plan and Detail Sheet - 2017-08-11
2017-08-11 - Geotechnical Study - 2017-08-11
2017-08-11 - Grading Plan - 2017-08-11
2017-08-11 - Landscape Plan - 2017-08-11
2017-08-11 - Notes and Legends - 2017-08-11
2017-08-11 - Phase I Environmental Site Assessment - 2017-08-11
2017-08-11 - Plan 4R - 2017-08-11
2017-08-11 - Sanitary Drainage Plan - 2017-08-11
2017-08-11 - Site Plan - 2017-08-11
2017-08-11 - Site Servicing and Stormwater Management Brief - 2017-08-11
2017-08-11 - Site Servicing Plan - 2017-08-11
2017-08-11 - Storm Drainage Plan - 2017-08-11
2017-08-11 - Summary - 2017-08-11
2017-08-11 - Survey Plan - 2017-08-11
2nd Submission - Geotechnical - Report 2017-05-25
2nd Submission - Sanitary EAsement Reference Plan 2013-01-03
Date Status
2018-10-01 Draft Report Sent to Councillor and Applicant for Response
2017-09-12 Comment Period has Ended/Issue Resolution
2017-08-15 Comment Period in Progress
2017-08-09 Community "Heads Up" - Completed

comments powered by Disqus
Created by Kevin O'Donnell to make it easier to be part of the political conversation in Ottawa.
On Twitter? Follow @OttWatch and @ODonnell_K
Privacy Policy