Site Plan Control: to demolish existing two storey and basement building and build new three storey building and basement within the relative footprint of the existing building. The new building is to be used for office of Urganga High Commission. Number of units and tenancy not applicabe. View application on ottawa.ca

WardWard 12 - RIDEAU-VANIER - Mathieu Fleury
Received2017-04-19
Updated2017-06-13
Address (Zoning) 231 COBOURG (Null)
Possibly related devapp(s) D02-02-17-0033 - Zoning By-law Amendment
Documents
Title Modified
2017-06-12 - Application Summary - 2017-06-12
2017-06-12 - Location Map - 2017-06-12
2017-06-07 Cultural Heritage Impact Statement 2017-06-06
2017-05-29 Planning Rationale 2017-05-25
2017-05-29 Sun Shadow Study 2017-04-17
2017-05-29 Architectural Concept Plans 2017-04-16
2017-05-29 Site Plan and Zoning Information 2017-04-16
2017-05-29 Architectural Elevations 2017-04-14
2017-05-29 Geotechnical Study 2017-04-14
2017-05-29 Grading, Drainage, and Erosion Control Plan 2017-04-14
2017-05-29 Site Servicing and Stormwater Management Report 2017-04-14
2017-05-29 Site Servicing Plan 2017-04-14
2017-05-29 Street Level Visualizations 2017-04-14
2017-05-29 Landscape Plans 2017-04-13
2017-05-29 Survey Plan 2017-04-13
2017-05-29 Tree Conservation Report 2017-02-15
2017-05-29 Chimney Swift Surveys 2017-02-10
Date Status
2017-06-09 Comment Period in Progress

comments powered by Disqus
Created by Kevin O'Donnell to make it easier to be part of the political conversation in Ottawa.
On Twitter? Follow @OttWatch and @ODonnell_K
Privacy Policy