D07-12-16-0025

Site Plan Control: The proposed development includes the construction of a 2 sty bldg plus basement which would contain a mosque a school and community centre facilities, as well as kitchen facilities and space to accomodate large social functions. Parking will be provided at grade - 285 spaces, with access provided via a driveway entrance on the north side of the proposed building View application on ottawa.ca

WardWard 10 - GLOUCESTER-SOUTHGATE - Diane Deans
Received2016-02-24
Updated2017-01-31
Address (Zoning) 3095 ALBION (IH)
Possibly related devapp(s) D02-02-16-0014 - Zoning By-law Amendment
Documents
Title Modified
January 11 2017 Updated Planning Rationale 2017-01-31
January 11 2017 General Plan of Services 2017-01-31
January 11 2017 Transportation Addendum 2017-01-25
January 11 2017 Elevations 2017-01-11
January 11 2017 Elevations 2 2017-01-11
January 11 2017 Site Plan 2017-01-11
January 11 2017 Site Plan 2 2017-01-11
January 11 2017 Updated Servicing Study and Stormwater Management Report 2017-01-10
January 11 2017 General Plan of Services 2 2017-01-09
January 11 2017 Grading and Erosion Sediment Control Plan 2017-01-09
January 11 2017 Grading and Erosion Sediment Control Plan 2 2017-01-09
January 11 2017 Retaining Wall and Acoustic Barrier Details 2017-01-06
January 11 2017 Tree Conservation Report and Landscape Plan 2017-01-06
January 11 2017 Tree Conservation Report and Landscape Plan 2 2017-01-06
January 11 2017 Updated Noise Study 2017-01-05
January 11 2017 Proposed Sidewalk Extension 2016-12-21
January 11 2017 Proposed Sidewalk Extension 2 2016-12-21
January 11 2017 Proposed Sidewalk Extension 3 2016-12-21
January 11 2017 Updated Phase 1 ESA 2016-12-02
Application Summary 2016-03-21
Planning Rationale 2016-02-24
Transportation Study 2016-02-23
Elevation Drawing 2016-02-16
Foundation Plan 2016-02-16
Ground Floor Plan 2016-02-16
Rear Elevation drawing 2016-02-16
Roof Plan 2016-02-16
Second Floor Plan 2016-02-16
Site Plan 2016-02-16
Site Plan (2) 2016-02-16
Tree Conservation & Landscape Plan 2016-02-16
Tree conservation and Landscape Plan (2) 2016-02-16
Grading and Erosion Plan 2016-01-30
Grading and Sediment Control Plan 2016-01-30
Servicing Plan 2016-01-30
Stormwater Management Report 2016-01-30
Servicing Plan (2) 2016-01-29
Noise study 2016-01-22
Phase I Environmental Report 2016-01-21
Surveyor Plan 2016-01-21
Geotechnical Report 2015-11-25
Date Status
2017-01-11 Application Reactivated
2016-03-15 Comment Period in Progress

comments powered by Disqus
Created by Kevin O'Donnell to make it easier to be part of the political conversation in Ottawa.
On Twitter? Follow @OttWatch and @ODonnell_K
Privacy Policy