D07-12-15-0187

Site Plan Control: Phase 1 of the redevelopment constitutes the Site Plan application which proposes a 30-storey residential building on the southeast portion of the site already zoned for such density (TD3 [2084]). View application on ottawa.ca

WardWard 11 - BEACON HILL-CYRVILLE - Tim Tierney
Received2015-12-09
Updated2016-11-09
Address (Zoning) 2280 CITY PARK (TD2[2084])
Possibly related devapp(s) D02-02-15-0086 - Zoning By-law Amendment
Possibly related by-laws 2016-250: A by-law of the City of Ottawa to amend By-law No. 2008-250 of the City of Ottawa to change the zoning of part of the lands known municipally as 2280 City Park Drive.
Documents
Title Modified
september 2016 - - floor plans 2016-09-27
september 2016 - - details phase one 2016-09-23
september 2016 - - transportation brief addendum 2016-09-23
september 2016 - - details and notes 2016-09-22
september 2016 - - erosion and sediment control plan 2016-09-22
september 2016 - - grading plan 2016-09-22
september 2016 - - landscape plan phase one 2016-09-22
september 2016 - - long term landscape plan 2016-09-22
september 2016 - - planting plan phase one 2016-09-22
september 2016 - - ponding plan 2016-09-22
september 2016 - - sanitary drainage plan 2016-09-22
september 2016 - - servicing plan 2016-09-22
september 2016 - - storm drainage plan 2016-09-22
september 2016 - - site plan phase one 2016-09-21
august 2016 - - floor plans and elevations 2016-08-24
august 2016 - - landscape plan 2016-08-24
august 2016 - - long term landscape plan 2016-08-24
august 2016 - - mup plan 2016-08-24
august 2016 - - phase 1 site plan 2016-08-24
august 2016 - - phase I planting plan 2016-08-24
august 2016 - - design brief 2016-08-23
august 2016 - - detail legend 2016-08-23
august 2016 - - erosion and sediment control plan 2016-08-23
august 2016 - - grading plan 2016-08-23
august 2016 - - ponding plan 2016-08-23
august 2016 - - sanitary drainage 2016-08-23
august 2016 - - servicing plan 2016-08-23
august 2016 - - storm drainage 2016-08-23
august 2016 - - conserved vegetation 2016-08-17
august 2016 - - existing conditions 2016-08-17
august 2016 - - landscape details 2016-08-17
august 2016 - - long term site plan 2016-08-11
Engineering Plans - Revised June 2016 2016-06-08
Landscape Plans - Revised June 2016 2016-06-08
Servicing and Stormwater Management Report - Revised June 2016 2016-06-08
Tree Conservation Report - Revised June 2016 2016-06-08
Concept Plan - Revised June 2016 2016-06-01
Phase 1 Site Plan - Revised June 2016 2016-06-01
Shadow Study - Revised June 2016 2016-06-01
D0712-15-0187 Elevations - Revised June 2016 2016-06-01
Transportation Brief - Revised June 2016 2016-05-27
Application Summary 2016-01-06
Confederation Line Proximity Study 2016-01-06
Planning Rationale and Design Brief 2016-01-06
Landscape Plans 2015-12-09
Survey 2015-12-09
Tree Conservation Report 2015-12-09
Design Renderings 2015-12-08
Elevation drawings 2015-12-08
Noise and Vibration Study 2015-12-08
Shadow Study (Phase I) 2015-12-08
Wind Study 2015-12-08
Geotechnical Investigation 2015-12-07
Shadow Study (Long Term) 2015-12-07
Grading Plan 2015-12-04
Servicing Plan 2015-12-04
Servicing Study 2015-12-04
Land Use Concept Plan 2015-11-26
Site Plan 2015-11-26
Transportation Brief 2015-11-18
Phase I ESA 2015-10-01
august 2016 - - construction depths 2015-08-14
august 2016 - - construction widths 2015-08-14
september 2016 - - stratavault modules depths 2015-08-14
september 2016 - - stratavault modules widths 2015-08-14
Date Status
2016-11-04 Application Approved
2016-11-01 Councillor Concurs
2016-02-08 Comment Period has Ended/Issue Resolution
2016-01-11 Comment Period in Progress

comments powered by Disqus
Created by Kevin O'Donnell to make it easier to be part of the political conversation in Ottawa.
On Twitter? Follow @OttWatch and @ODonnell_K
Privacy Policy