D07-12-15-0087

Site Plan Control: The City of Ottawa has received a Site Plan Control application to permit the development of 28-storey and 26-storey residential towers, with a mixed use podium ranging from nine (9) storeys oriented towards Rideau Street, to two (2) storeys of retail use oriented towards Rideau Street and Chapel Street. View application on ottawa.ca

WardWard 12 - RIDEAU-VANIER - Mathieu Fleury
Received2015-05-06
Updated2017-03-15
Address (Zoning) 151 CHAPEL (TM[2339] F(6.0) S354)
153 CHAPEL (TM[2339] F(6.0) S354)
Possibly related devapp(s) D01-01-14-0020 - Official Plan Amendment
D02-02-14-0107 - Zoning By-law Amendment
Documents
Title Modified
Urban Design Reivew Panel Formal Review 2016-01-26
D02-02-14-0107 Traffic Addendum 3 2015-12-23
D02-02-14-0107 Elevations December 2015 2015-12-22
D02-02-14-0107 Floor Plans December 2015 2015-12-22
D02-02-14-0107 Site Plan December 2015 2015-12-22
D02-02-14-0107 Sun Shadow Study December 2015 2015-12-22
D02-02-14-0107 Landscape Plan December 2015 2015-12-21
D02-02-14-0107 Tree Conservation Plan December 2015 2015-12-21
D02-02-14-0107 Wind Study December 2015 2015-12-16
D02-02-14-0107 Erosion Control Plan December 2015 2015-12-15
D02-02-14-0107 Grading Plan December 2015 2015-12-15
D02-02-14-0107 Servicing Report December 2015 2015-12-15
D02-02-14-0107 Site Servicing Plan December 2015 2015-12-15
D02-02-14-0107 Stormwater Management Plan December 2015 2015-12-15
D02-02-14-0107 Traffic Addendum 1 2015-09-29
D02-02-14-0107 Traffic Addendum 2 2015-09-29
D02-02-14-0107 Traffic Cut-through analysis 2015-09-29
Application Summary - Billingual 2015-06-05
Tree Conservation Report 2015-05-06
Erosion Control Plan 2015-05-05
Existing Conditions Plan 2015-05-05
Functional Servicing and Stormwater Management Report 2015-05-05
Grading Plan 2015-05-05
Site Plan 2015-05-05
Site Servicing Plan 2015-05-05
Stormwater Management Plan 2015-05-05
Electrical Photometric Lighting Plan 2015-04-30
Site Lighting Design Letter 2015-04-30
Architectural Drawings and Floor Plans 2015-04-29
Grading and Drainage Plan 2015-04-29
Landscape Details 2015-04-29
Landscape Layout Plan 2015-04-29
Planting Plan 2015-04-29
Survey and Tree Inventory Plan 2015-04-29
Date Status
2017-03-14 Receipt of Agreement from Owner Pending
2016-03-29 OMB Hearing Held
2015-07-07 Comment Period has Ended/Issue Resolution
2015-06-09 Comment Period in Progress

comments powered by Disqus
Created by Kevin O'Donnell to make it easier to be part of the political conversation in Ottawa.
On Twitter? Follow @OttWatch and @ODonnell_K
Privacy Policy