D07-12-14-0067

Site Plan Control: to permit a multi-building retail shopping centre on a 6.5 hectare site. The development consist of twelve (12) separate, free-standing buildings with 757 parking spaces. There are two (2) buildings proposed to have dtrive through facilities. View application on ottawa.ca

WardWard 20 - OSGOODE - George Darouze
Received2014-04-11
Updated2016-12-30
Address (Zoning) 1420 EARL ARMSTRONG (R5Z[1870] S269)
1424 EARL ARMSTRONG (GM28 S269)
Possibly related devapp(s) D08-02-16/A-00363 - coa
Documents
Title Modified
Landscape L1-2/3 Sub2 2016-12-30
December 2016 Composite Utility Plan 2016-12-29
December 2016 Context Plan Roads 2016-12-29
December 2016 Electrical Site Plan 2016-12-29
December 2016 Electrical Site Plan 1 2016-12-29
December 2016 Electrical Site Plan 3 2016-12-29
December 2016 Elevations Building C 2016-12-29
December 2016 Elevations Building H 1 2016-12-29
December 2016 Elevations Building H 2 2016-12-29
December 2016 Elevations Building I 2016-12-29
December 2016 Erosion and Sediment Plan 2016-12-29
December 2016 External Drainage and Ditching Plan 2016-12-29
December 2016 Grading Plan 2016-12-29
December 2016 Key Plan Roads 2016-12-29
December 2016 Landsacpe Plan 4 2016-12-29
December 2016 Landscape Plan 1 2016-12-29
December 2016 Landscape Plan 2 2016-12-29
December 2016 Landscape Plan 3 2016-12-29
December 2016 Landscape Plan 5 2016-12-29
December 2016 Landscape Plan L3-1 2016-12-29
December 2016 Master Site Plan 2016-12-29
December 2016 Notes and Details 2016-12-29
December 2016 Plan Profile 2016-12-29
December 2016 Proposed Road Modification Limebank Road 2016-12-29
December 2016 Servicing Design Brief and Stormwater Management 2016-12-29
December 2016 Servicing Plan 2016-12-29
December 2016 Storm Drainage Plan 2016-12-29
December 2016 Stormwater Drainage 2016-12-29
December 2016 Stormwater Management Report 2016-12-29
December 2016 Truck and Traffic Plan 2016-12-29
December 2016Proposed Road Modification Earl Armstrong Road 2016-12-29
Servicing Design Brief, Storm Report and Engineering Plans Sub2 2016-05-19
Stormwater Report & Engineering Plans Sub2 2016-05-19
Electrical Plan Sub2 2016-05-18
Elevation Building I Sub2 2016-05-18
Elevations Building C Sub2 2016-05-18
Elevations Building E 2016-05-18
Elevations Building H Sub2 2016-05-18
Landscape L1-2 Sub2 2016-05-18
Landscape L1-4 Sub2 2016-05-18
Landscape L1-5 Sub2 2016-05-18
Landscpe L1-23 Sub2 2016-05-18
Overall Landscape Plan Sub2 2016-05-18
Site Details sub2 2016-05-18
Site Plan Sub2 2016-05-18
Transportation Impact Study REVISED 2014-10-30
Phase II Environmental Site Assessment 2014-10-17
Application Summary 2014-09-15
Archaeological Resource Assessment 2014-09-15
Elevations - Building C 2014-09-15
Elevations - Building E 2014-09-15
Elevations - Building H 2014-09-15
Elevations - Renderings 2014-09-15
Environmental Impact Statement 2014-09-15
Erosion and Sediment Control Plan 2014-09-15
Geotechnical Study 2014-09-15
Grading & Drainage Plan 2014-09-15
Landscape Plan 2014-09-15
Location Plan 2014-09-15
Phase I Environmental Site Assessment 2014-09-15
Planning Rationale 2014-09-15
Roadway Modification Design Plan 2014-09-15
Site Plan 2014-09-15
Site Servicing Plan 2014-09-15
Site Servicing Study 2014-09-15
Stormwater Site Management Report 2014-09-15
Survey Plan 2014-09-15
Transportation Impact Study 2014-09-15
Tree Conservation Report 2014-09-15
Date Status
2016-12-29 Application Reactivated
2014-10-14 Application on Hold
2014-09-15 Comment Period in Progress

comments powered by Disqus
Created by Kevin O'Donnell to make it easier to be part of the political conversation in Ottawa.
On Twitter? Follow @OttWatch and @ODonnell_K
Privacy Policy