D07-12-14-0008

Site Plan Control: Construct a gas station with associated convenience store, drive through coffee shop, and 2nd storey apartment. The building will be 370m2, there will be with 4 gas pump islands and canopy, and 13 parking spaces. The site will have 2 accesses off the east side of the future extension of Barnett Drive. View application on ottawa.ca

WardWard 19 - CUMBERLAND - Stephen Blais
Received2014-01-21
Updated2015-11-03
Address (Zoning) 2725 Old Montreal Road (RC12)
Documents
Title Modified
Hydrogeological and Terrain Analysis 2015-11-03
Electrical Site Lighting Plan 2015-10-01
Servicing & Grading Plan Rev #2 2015-10-01
Site Plan Details Rev #2 2015-10-01
Site Plan Rev #2 2015-10-01
Stormwater Management Report Rev #2 2015-10-01
Stormwater Management Report Rev #2 - Appendix A - SS1 2015-10-01
Stormwater Management Report Rev #2 - Appendix A - SS2 2015-10-01
Stormwater Management Report Rev #2 - Appendix B - TA1 2015-10-01
Stormwater Management Report Rev #2 - Appendix B - TA2 2015-10-01
Stormwater Management Report Rev #2 - Appendix B - TA3 2015-10-01
Stormwater Management Report Rev #2 - Appendix C - P1 2015-10-01
Stormwater Management Report Rev #2 - Appendix K - Septic Permit 2015-10-01
Architectural Bldg Elevation Dwgs Rev #1 2015-07-24
Canopy Elevation Dwgs Rev #1 2015-07-24
Site Plan Details Rev #1 2015-07-24
Site Plan Rev #1 2015-07-24
Site Servicing & Grading Plan Rev #1 2015-07-24
Stage 2 Archaeological Resources Assessment 2015-07-24
Stormwater Management Report Rev #1 2015-07-24
Stormwater Management Report Rev #1 - Appendix A-SS1 2015-07-24
Stormwater Management Report Rev #1 - Appendix A-SS2 2015-07-24
Stormwater Management Report Rev #1 - appendix B-TA1 2015-07-24
Stormwater Management Report Rev #1 - Appendix B-TA2 2015-07-24
Stormwater Management Report Rev #1 - Appendix B-TA3 2015-07-24
Stormwater Management Report Rev #1 - Appendix C-P1 2015-07-24
Archaeological Resource Assessment 2014-04-10
Elevation Drawing 2014-04-10
Elevations - Front Side Back 2014-04-10
Environmental Site Assessment - Phase I 2014-04-10
Erosion and Sediment Control Plan 2014-04-10
Geotechnical Study 2014-04-10
Planning Rationale 2014-04-10
Post Development Tributary Areas Plan 2014-04-10
Pre-Development Tributary Areas Plan 2014-04-10
Site Plan 2014-04-10
Site Servicing Plan 2014-04-10
Surface Ponding Plan 2014-04-10
Survey 2014-04-10
Topographical Plan 2014-04-10
Date Status
2015-10-23 Application File Pending
2015-10-01 Application Reactivated
2014-06-20 Application on Hold
2014-04-07 Comment Period in Progress