Site Plan Control: The purpose of the Site Plan Control proposal is to seek approval for the expansion and redevelopment of Arts Court to accommodate a new Ottawa Art Gallery and the re-purposing of the existing building. The development concept includes space for the Ottawa Art Gallery (OAG), an OAG multi-purpose space designed to serve as a 120-seat screening room, and a black box theatre and studio classrooms for the University of Ottawa (U of O). The development concept also includes a 17-storey tower which will be sold to the private sector. It will be situated atop a 6-storey podium, and will be occupied by either residential, hotel or office uses. There will be a multi-level underground parking garage accommodating 162 spaces. The podium will house the OAG, as well as a 1,830-square metre UOttawa facility, and private sector uses. The development will have a total height of approximately 75.2 metres, with amenity space provided on the 2nd, 3rd, and 4th floor levels. The newly constructe View application on ottawa.ca

Send an official comment to the city regarding D07-12-13-0129.

WardWard 12 - RIDEAU-VANIER - Mathieu Fleury
Received2013-06-26
Updated2014-04-04
Address (Zoning) 60 Waller Street (MD[2056])
70 Waller Street (MD[2056])
Possibly related devapp(s) D02-02-13-0044 - Zoning By-law Amendment
Documents
Title Modified
0 Detail Elevation2 2013-06-18
0 East Elevation 2013-06-18
0 Noise and Vibration Study 2013-06-18
0 North Elevation 2013-06-18
0 South Elevation 2013-06-18
0 Detail Elevation 2013-06-14
0 Phase II ESA 2013-06-13
0 Landscape and Lighting Plan 2013-06-12
0 Landscape and Lighting Plan2 2013-06-12
0 Traffic Impact Brief 2013-06-12
0 Composite Utility Plan 2013-06-11
0 Drainage Plan 2013-06-11
0 Erosion and Sediment Control Plan 2013-06-11
0 Grading Plan 2013-06-11
0 Site Servicing and Stormwater Management Report 2013-06-11
0 Site Servicing Plan 2013-06-11
0 Parking Plan 2013-06-10
0 Site Plan 2013-06-10
0 Phase 1 ESA 2013-05-30
0 Phase 1 ESA2 2013-05-30
0 Geotechnical Study 2012-12-04
0 Survey Plan 2011-11-25
Date Status
2014-03-31 Request for Agreement Received
2013-08-01 Comment Period has Ended/Issue Resolution
2013-07-05 Comment Period in Progress