(Heads up! Ottwatch is frozen/unstable while it moves servers. Sep2/2019)

D07-05-19-0001

Demolition Control: The City of Ottawa has received Demolition Control applications to demolish a two-storey semi-detached dwelling at 20 and 22 Hawthorne and demolish a two-storey detached dwelling at 24 Hawthorne for the purpose of remediating the property. View application on ottawa.ca

WardWard 17 - CAPITAL - Shawn Menard
Received2019-05-30
Updated2019-08-27
Address (Zoning) 20 HAWTHORNE (TM12[1839] H(14.5))
22 HAWTHORNE (TM12[1839] H(14.5))
Possibly related devapp(s) D07-12-15-0205 - Site Plan Control
D07-12-18-0193 - Site Plan Control
Documents
Title Modified
Application Summary 2019-08-27
22 Hawthorne - Remedial Excavation 2019-08-23
20 Hawthorne - Designated Substance Survey 2019-08-23
20-22 Hawthorne - Survey Plan 2019-08-20
20-24 Hawthorne - Demo Rationale 2019-08-20
20-22 Hawthorne - Phase I ESA 2019-07-31
22 Hawthorne - Oil Spill Delineation 2019-07-22
20-22 Hawthorne - Concept LP 2019-06-21
20-22 Hawthorne - Demo Plan 2019-06-21
22 Hawthorne - Designated Substance Survey 2018-05-11
Date Status
2019-08-26 Comment Period in Progress
2019-08-21 Community Heads Up - supporting documents to be posted later during circulation period

comments powered by Disqus
Created by Kevin O'Donnell to make it easier to be part of the political conversation in Ottawa.
On Twitter? Follow @OttWatch and @ODonnell_K
Privacy Policy