D02-02-17-0081

Zoning By-law Amendment: 3 Blocks. 15 22 and 24 in Phase 1 B of Waterbridge Village View application on ottawa.ca

WardWard 13 - RIDEAU-ROCKCLIFFE - Tobi Nussbaum
Received2017-08-16
Updated2017-10-12
Address (Zoning) 335 ST-LAURENT, BOULEVARD (GM31 H(30))
245 SQUADRON (GM31 H(30))
Possibly related devapp(s) D07-12-17-0111 - Site Plan Control
Documents
Title Modified
2017-09-29 Urban Design Review Panel Formal Submission 2017-09-29
2017-08-22 Application Summary 2017-08-29
2017-08-22 Comment Sheet 2017-08-29
2017-08-22 Block 15 Site Plan 2017-08-15
2017-08-22 Block 22 Site Plan 2017-08-15
2017-08-22 Block 24 Site Plan 2017-08-15
2017-08-22 Planning Rationale 2017-08-15
2017-08-22 Transportation Noise Assessment 2017-08-15
2017-08-22 Transportation Overview 2017-08-15
2017-08-22 Block 15 Erosion Control 2017-08-14
2017-08-22 Block 15 Existing Conditions 2017-08-14
2017-08-22 Block 15 Grading Plan 2017-08-14
2017-08-22 Block 15 Sanitary Drainage Plan 2017-08-14
2017-08-22 Block 15 Servicing and SWM Report 2017-08-14
2017-08-22 Block 15 Site Servicing Plan (1) 2017-08-14
2017-08-22 Block 15 Site Servicing Plan (2) 2017-08-14
2017-08-22 Block 15 SWM Plan 2017-08-14
2017-08-22 Block 22 Erosion Control Plan 2017-08-14
2017-08-22 Block 22 Existing Conditions 2017-08-14
2017-08-22 Block 22 Grading Plan 2017-08-14
2017-08-22 Block 22 Sanitary Drainage Plan 2017-08-14
2017-08-22 Block 22 Servicing and SWM Report 2017-08-14
2017-08-22 Block 22 Site Servicing Plan (1) 2017-08-14
2017-08-22 Block 22 Site Servicing Plan (2) 2017-08-14
2017-08-22 Block 22 SWM Plan 2017-08-14
2017-08-22 Block 24 Erosion Control Plan 2017-08-14
2017-08-22 Block 24 Existing Conditions 2017-08-14
2017-08-22 Block 24 Grading Plan 2017-08-14
2017-08-22 Block 24 Sanitary Drainage Plan 2017-08-14
2017-08-22 Block 24 Servicing and SWM Report 2017-08-14
2017-08-22 Block 24 Site Servicing Plan (1) 2017-08-14
2017-08-22 Block 24 Site Servicing Plan (2) 2017-08-14
2017-08-22 Block 24 SWM Plan 2017-08-14
2017-08-22 Density Plan 2017-08-14
2017-08-22 Landscape Plan 2017-08-14
2017-08-22 Survey 2017-08-14
2017-08-22 Environmental Impact Statement 2017-08-11
2017-08-22 Geotechnical Report 2017-08-10
2017-08-22 Tree Conservation Report 2017-08-10
What is a Zoning Amendment FR 2017-01-13
What is a Zoning By-law Amendment5 2017-01-13
Date Status
2017-09-28 Comment Period has Ended/Issue Resolution
2017-08-31 Comment Period in Progress
2017-08-22 Community "Heads Up" - Completed

comments powered by Disqus
Created by Kevin O'Donnell to make it easier to be part of the political conversation in Ottawa.
On Twitter? Follow @OttWatch and @ODonnell_K
Privacy Policy