D02-02-11-0066

Zoning By-law Amendment: The subdivision and zoning would see the development of a plan of subdivision on 53 hectares north and south of Perth Street on the west side of the Village of Richmond. 600 to 700 single family homes with 9 metre minimum lot widths and 300 to 400 townhomes with 5 metre minimum lot widths are proposed. There would be 31 public streets, one park, open space along the water course and a storm water management facility created. The development would be serviced with a new municipal well and water system and connect to the existing City sanitary sewer system. View application on ottawa.ca

WardWard 21 - RIDEAU-GOULBOURN - Scott Moffatt
Received2011-07-27
Updated2014-07-29
Address (Zoning) 6335 Perth Street (V2E[779r]-h)
Possibly related devapp(s) D07-16-11-0014 - Plan of Subdivision
Documents
Title Modified
Basement Depths 2013-11-05
Continuous Erosion Analysis 2013-11-05
Erosion Hazard Assessment 2013-11-05
Draft Plan of Subdivision Sub#2 2013-01-18
Drainage Report 2013-01-18
Grading Plan Sub#2 2013-01-18
Hydrogeological & Terrain Analysis Technical Memo 2013-01-18
Peer Review Groundwater Vulnerability Study#2 2013-01-18
Richmond Pump Station 2013-01-18
Transportation Overview 2013-01-18
Van Gaal Drain Realignment 2013-01-18
Peer Review Groundwater Vulnerability Study 2012-06-13
Revised SWM Report 2012-05-22
Advertisement 2012-05-02
Appendix 1 2012-05-02
Appendix 10 complete 2012-05-02
Appendix 2 2012-05-02
Appendix 3 2012-05-02
Appendix 4 2012-05-02
Appendix 5 2012-05-02
Appendix 5 complete 2012-05-02
Appendix 6 2012-05-02
Appendix 72 2012-05-02
Appendix 8 2012-05-02
Appendix 9 2012-05-02
Appendix A 2012-05-02
Appendix B 2012-05-02
Channelization-Berm Impact 2012-05-02
Conceptual SWM Plan Option 1 2012-05-02
Conceptual SWM Plan Option 1 (Drwg 3) 2012-05-02
Conceptual SWM Plan Option 2 2012-05-02
Conceptual SWM Plan Option 3 (Drwg 5) 2012-05-02
Conceptual SWM Plan Option 3A 2012-05-02
Conceptual SWM Plan Option 3B 2012-05-02
Conceptual SWM Plan Option 3C 2012-05-02
Conceptual SWM Planl Option 2 (drwg 4) 2012-05-02
Constraints Plan 2012-05-02
Cumulative Impact Assessment 2012-05-02
Existing Conditions Analysis Natural Sciences 2012-05-02
Existing Conditions Storm Drainage Plan 2012-05-02
Existing Conditions SWMHYMO Input Files 2012-05-02
Fig #1 2012-05-02
Fig #2 2012-05-02
Fig #3 2012-05-02
Fig #4 2012-05-02
Fish Habitat Report 2012-05-02
Floodline Draft Report 2012-05-02
Floodplain Volumes 2012-05-02
Grading Plan 2012-05-02
HEC-RAS Summary Printout 2012-05-02
Hydraulic Analysis 2012-05-02
Impact on Van Gaal Drain 2012-05-02
JESA Flows 2012-05-02
Nat Env Response Table 2012-05-02
Phosphorus Report 2012-05-02
Pond Operating Conditions 2012-05-02
Post Conditions 2012-05-02
Pre Conditions 2012-05-02
Preliminary Cut-Fill Grading Option 3A 2012-05-02
Preliminary Cut-Fill Grading Option 3B 2012-05-02
Preliminary Cut-Fill Grading Option 3C 2012-05-02
Preliminary HGL Analysis 2012-05-02
Preliminary Sanitary Sewer System 2012-05-02
Preliminary Storm Sewer System 2012-05-02
Proposed Conditions SWMHYMO Input Files 2012-05-02
Report Memo 2012-05-02
Response Table 2012-05-02
Revised Permit Letter 2012-05-02
RVCA Letter 2012-05-02
RVCA Supplementary Report 2012-05-02
Stormwater Management Pond #1 cross-sections 2012-05-02
Stormwater Management Pond #2 2012-05-02
SWM Drainage Plan 2012-05-02
SWM Report 2012-05-02
Vision 2012-05-02
Water Budget Results 2012-05-02
Workplan 2012-05-02
Appendices A 2012-05-01
Appendix 10 2012-05-01
Assessment of Adequacy of Public Services & Site Servicing Study 2012-05-01
culvert memo 2012-05-01
Description of Files 2012-05-01
Draft Plan of Subdivision 2012-05-01
Fill Impact on Jock River 2012-05-01
Flows 2012-05-01
Geotechnical Study #1 2012-05-01
Geotechnical Study #2 2012-05-01
Hydrogeological Analysis 2012-05-01
Immpact Assessment - Appendix A 2012-05-01
Impact Assessment - Appendix B 2012-05-01
Impact Assessment Study 2012-05-01
Impact on Drain 2012-05-01
Output Files 2012-05-01
Phase 1 Environmental Site Assessment 2012-05-01
Planning Rationale 2012-05-01
Pond Cross Section #1 2012-05-01
Pond Cross Section #2 2012-05-01
Sanitary Plan 2012-05-01
sp7aJOCKB 2012-05-01
SP7AJOCKB-out 2012-05-01
SP7AJOCKB-sum 2012-05-01
Storm Plan 2012-05-01
Stormwater Management Plan 2012-05-01
SWM OPA Response 2012-05-01
SWM Output 2012-05-01
SWM Plaln - Fig #2 2012-05-01
SWM Plan - Advertisement 2012-05-01
SWM Plan - Channelization 2012-05-01
SWM Plan - Fig #1 2012-05-01
SWM Plan - Fig #3 2012-05-01
SWM Plan - Fig #4 2012-05-01
SWM Plan - Report 2012-05-01
SWM Plan - Revised Permit Letter 2012-05-01
SWM Plan - RVCA Report 2012-05-01
SWM Plan - Summary Printout 2012-05-01
SWM Plan Option #1 2012-05-01
SWM Plan Option #2 2012-05-01
Table 1A 2012-05-01
Transportation Brief 2012-05-01
Tree Conservation Report 2012-05-01
Wellhead Protection Plan 2012-05-01
Wellhead Protection Plan #2 2012-05-01
Wellhead Protection Plan #3 2012-05-01
Wellhead Protection Plan #4 2012-05-01
Date Status
2014-11-26 OMB Pre-Hearing Held
2013-07-15 Appealed to OMB
2012-05-31 Application on Hold