D01-01-12-0012

Official Plan Amendment: The subject properties are currently designated as Residential Low-Profile within the Preston-Champagne Secondary Plan. The proposed Official Plan Amendment is to change the properties' designation on Schedule L from Residential Low-Profile to Residential High-Profile in order to allow for higher density developments. The proposed residential development features 159 apartment units in an 18-storey tower on top of a 4-storey podium. All dwelling units are proposed to be condominiumized. Three floors of underground parking will be provided for all residents at a rate of 0.9 spaces per unit. Visitor parking will also be included in the underground level at a rate of 0.2 spaces per dwelling unit. View application on ottawa.ca

Send an official comment to the city regarding D01-01-12-0012.

WardWard 14 - SOMERSET - Catherine Mckenney
Received2012-10-25
Updated2016-04-05
Address (Zoning) 93 Norman Street (*_R4T)
95 Norman Street (*_R4T)
97 Norman Street (*_R4T)
99 Norman Street (*_R4T)
103 Norman Street (*_R4T)
105 Norman Street (*_R4T)
Possibly related devapp(s) D02-02-12-0110 - Zoning By-law Amendment
D07-12-13-0225 - Site Plan Control
D07-05-15-0004 - Demolition Control
Documents
Title Modified
Planning Rationale - Revised 2016-04-05
Floor Plans REVISED DEC13 2014-01-07
Site Plan REVISED DEC2013 2014-01-07
Adequacy of Existing Services - Revised 2013-10-24
REVISED - Context Plan 2013-10-24
REVISED 16 Section 2013-10-24
REVISED North Elevation 2013-10-24
REVISED Perspective 1 2013-10-24
REVISED Perspective 2 2013-10-24
REVISED Perspective 3 2013-10-24
REVISED Perspective 4 2013-10-24
REVISED Perspective 5 2013-10-24
REVISED Plan 1 2013-10-24
REVISED Plan 2 2013-10-24
REVISED Plan 3 2013-10-24
REVISED Site Plan 2013-10-24
REVISED South Elevation 2013-10-24
REVISED Sun Shadow Study 1 2013-10-24
REVISED Sun Shadow Study 2 2013-10-24
REVISED West East Elevation 2013-10-24
Transportation Brief - Addendum #1 - Revised 2013-10-24
Architectural Building Elevation Drawings 2012-10-29
Geotechnical Study 2012-10-29
Phase 1 Environmental Site Assessment 2012-10-29
Phase II Environmental Site Assessment 2012-10-29
Planning Rationale 2012-10-29
Site Plan 2012-10-29
Site Servicing Study 2012-10-29
Sun Shadow Study 2012-10-29
Survey Plan 2012-10-29
Date Status
2014-02-12 Application File Pending
2014-02-11 Application Reactivated
2012-11-27 Application on Hold
comments powered by Disqus
Created by Kevin O'Donnell to make it easier to be part of the political conversation in Ottawa.
On Twitter? Follow @OttWatch and @ODonnell_K