Construction and Infrastructure

Location: http://ottawa.ca/en/major-projects/construction-and-infrastructure/construction-and-infrastructure
Last updated: 976 days(s) ago
Diff to previous version: diff

Documents at a glance

Modified Title Diff to previous
976 days(s) ago Roger Stevens Drive Sidewalk (Perkins Dr to Fourth Line Rd) diff
976 days(s) ago 2016 Sidewalk Program -
976 days(s) ago St. Joseph Boulevard watermain repair (St. Jean Street to Champlain Street) diff
976 days(s) ago Spencer Street Rehabilitation diff
976 days(s) ago South Urban Community Pump Station Upgrades and Pressure Zone Changes diff
976 days(s) ago South Nepean Collector Sewer - Phase 2 (Longfields Dr to Strandherd Dr) diff
976 days(s) ago Sandridge Road watermain replacement diff
976 days(s) ago Rosebella Avenue watermain and Blossom Park West area traffic management diff
976 days(s) ago Rideau Valley Drive South Reconstruction diff
976 days(s) ago Richmond Forcemain Repairs and Modifications diff
976 days(s) ago Miscellaneous Surface Drainage Improvements - West - Constance Bay diff
976 days(s) ago Meath Street - Road, Sewer and Watermain Reconstruction diff
976 days(s) ago Navaho Drive and Albany Drive - Integrated Road, Sewer and Watermain Construction diff
976 days(s) ago Morrena Road Major Drainage Improvements diff
976 days(s) ago Lyon Street (Florence to McLeod Streets) and McLeod Street (Lyon to Kent Streets) diff
976 days(s) ago Lyman Street and Mulvihill Avenue Reconstruction diff
976 days(s) ago Kanata West Pump Station and Forcemains diff
976 days(s) ago Gilmour Street and Cartier Street Rehabilitation -
976 days(s) ago Foster Stormwater Management Facility diff
976 days(s) ago Combined Sewage Storage Tunnel diff
976 days(s) ago Crystal Beach - Bedale - Conniston - Ullswater - Hexam and Whitburn Sanitary Replacement diff
976 days(s) ago Columbus Avenue - Sharp Street to Lola Street diff
976 days(s) ago Churchill Avenue North Sewer Construction  diff
976 days(s) ago Seneca Street, Aylmer Avenue and Fulton Avenue et al Integrated Road, Sewer, and Water Project diff
976 days(s) ago Ottawa river outfalls rehabilitation master plan and class environmental assessment -
976 days(s) ago Marquis Avenue West (Mulberry Crescent North to Naskapi Drive North) diff
976 days(s) ago Lavergne, Jolliet, Montfort, Ste. Cecile, Ferland, Frechette, Hector-Hotte, Garneau, Ste. Monique, Perrier diff
976 days(s) ago Kinburn Side Road Storm Sewer and Roadway Reconstruction diff
976 days(s) ago Glynn Avenue (Edith Avenue to Lola Street) diff
976 days(s) ago Dynes Road and Prince of Wales Drive diff
976 days(s) ago West Transitway Extension (Bayshore Station to Moodie Drive) diff
976 days(s) ago St. Laurent Blvd. (Industrial to Smyth) diff
976 days(s) ago Southwest Transitway Extension (Baseline Road to Norice Street) diff
976 days(s) ago Innovation Park and Ride diff
976 days(s) ago Hunt Club Community to South Keys / Greenboro Transit Stations -
976 days(s) ago Hospital Link and Cumberland Transitway Westerly Planning Study -
976 days(s) ago Cumberland Transitway – Recommended design east of Tenth Line Road to Frank Kenny Road diff
976 days(s) ago Carp Snow Disposal Facility -
976 days(s) ago Woodcrest Road (Kilborn Avenue West to Kilborn Avenue East) diff
976 days(s) ago Tenth Line Road Widening (Brian Coburn Blvd. to Harvest Valley Avenue) -
976 days(s) ago Stewart Street (King Edward Avenue to Friel Street) -
976 days(s) ago Segregated Bike Lane Pilot Project -
976 days(s) ago Rockcliffe Park Infrastructure Renewal -
976 days(s) ago River Lane and Crichton Street (Keefer to Dufferin) -
976 days(s) ago Queen Street Renewal (Bronson Avenue to Elgin Street) -
976 days(s) ago Queen Elizabeth Driveway crossing enhancements diff
976 days(s) ago Main Street Renewal -
976 days(s) ago MacFarlane Road Paved Shoulders (Merivale Road to Deakin Street) diff
976 days(s) ago Lakeview Terrace (Bronson Avenue to Queen Elizabeth Drive) diff
976 days(s) ago Greenbank Road widening (Malvern to Strandherd) diff
976 days(s) ago Iris St - Road and Sidewalk Construction diff
976 days(s) ago Gladstone Reconstruction – Bank to Cartier -
976 days(s) ago Brian Coburn Boulevard Extension, Navan Road to Mer Bleue Road -
976 days(s) ago Rideau Street Renewal (Sussex Drive to Dalhousie Street) -
976 days(s) ago Renfrew Avenue, Imperial Avenue and Lyon Street diff
976 days(s) ago Jockvale Road Widening (Cambrian to Prince of Wales) -
976 days(s) ago Trillium Multi-Use Pathway Phase II (Young Street to Carling Avenue) diff
976 days(s) ago Walkley Road Bridge over the Southeast Transitway -
976 days(s) ago Stagecoach Road Bridge Culvert Replacement diff
976 days(s) ago Minto Bridges East & Centre Rehabilitation -
976 days(s) ago Klondike Road Multi-Use Pathway -
976 days(s) ago McIlraith Bridge Rehabilitation diff
976 days(s) ago Rideau Canal Crossing - Fifth to Clegg -
976 days(s) ago Rideau River Western Pathway diff
976 days(s) ago 2016 Culvert Renewal Program diff
976 days(s) ago O'Connor Street (Laurier Ave to Fifth Ave) New Bikeway Construction diff
976 days(s) ago Mackenzie Avenue Bike Tracks diff
976 days(s) ago New Multi-Use Pathway (Greenbank Road to Antler-Dolan Pedestrian Underpass) -
976 days(s) ago Mooney’s Bay Play Structure -
1057 days(s) ago (DELETED) Queen Elizabeth Driveway crossing enhancements -
1096 days(s) ago (DELETED) St. Joseph Boulevard watermain repair (St. Jean Street to Champlain Street) diff
1167 days(s) ago (DELETED) Woodcrest Road (Kilborn Avenue West to Kilborn Avenue East) -
1167 days(s) ago (DELETED) Mer Bleue Road Widening  -
1167 days(s) ago (DELETED) Prince of Wales Bridge Culvert Renewal (Fisher Avenue and Colonnade Road) -
Created by Kevin O'Donnell to make it easier to be part of the political conversation in Ottawa.
On Twitter? Follow @OttWatch and @ODonnell_K
Privacy Policy