Consultation/Document Title Updated (days ago)
Queen Elizabeth Driveway Crossing Enhancements 60
pedestrian crossover webpage. today
Downtown Ottawa truck tunnel today
Study Documents and Report to Transportation Committee today
Overview of Downtown Ottawa Truck tunnel 8
St. Laurent Blvd. (Industrial to Smyth) today
St. Joseph Boulevard watermain today
Transit 79
Planned today
Under way today
Sewers, water and wastewater 79
Under way today
Planned today
Water, Wastewater and Stormwater Rate Structure Review 1
Street Name and Address Changes 1
Street Name and Address Changes - Update August 2016 1
Frequently Asked Questions 103
Available Commemorative Street Names 115
Change of Address Checklist 158
Criteria for Street Naming 158
Have your say! 160
Street Name and Address Changes - Overview 160
Airport Parkway and Lester Road Widening 1
Notice of Study Completion and Filing of the Environmental Study Report 1
Project overview 60
Open House #3 - March 10, 2016 60
Open House #2 - June 17, 2015 60
Open House #1 - January 27, 2015 60
Notice of study commencement 60
Construction and Infrastructure 1
Morrena Road Major Drainage Improvements 2
Seneca Street, Aylmer Avenue and Fulton Avenue et al Integrated Road, Sewer, and Water Project 4
Stagecoach Road Bridge Culvert Replacement 4
St. Joseph Boulevard watermain repair (St. Jean Street to Champlain Street) 8
Lakeview Terrace (Bronson Avenue to Queen Elizabeth Drive) 8
2016 Culvert Renewal Program 31
Lyon Street (Florence to McLeod Streets) and McLeod Street (Lyon to Kent Streets) 31
Greenbank Road widening (Malvern to Strandherd) 32
Navaho Drive and Albany Drive - Integrated Road, Sewer and Watermain Construction 36
Southwest Transitway Extension (Baseline Road to Norice Street) 36
Rockcliffe Park Infrastructure Renewal 37
Cumberland Transitway – Recommended design east of Tenth Line Road to Frank Kenny Road 37
Stewart Street (King Edward Avenue to Friel Street) 37
Tenth Line Road Widening (Brian Coburn Blvd. to Harvest Valley Avenue) 38
Lyman Street and Mulvihill Avenue Reconstruction 43
Rideau Canal Crossing - Fifth to Clegg 43
Spencer Street Rehabilitation 45
Rideau Street Renewal (Sussex Drive to Dalhousie Street) 50
Klondike Road Multi-Use Pathway 51
Innovation Park and Ride 53
O'Connor Street (Laurier Ave to Fifth Ave) New Bikeway Construction 53
Lavergne, Jolliet, Montfort, Ste. Cecile, Ferland, Frechette, Hector-Hotte, Garneau, Ste. Monique, Perrier 53
Crystal Beach - Bedale - Conniston - Ullswater - Hexam and Whitburn Sanitary Replacement 58
River Lane and Crichton Street (Keefer to Dufferin) 58
Main Street Renewal 59
Mooney’s Bay Play Structure 63
2016 Sidewalk Program 64
Roger Stevens Drive Sidewalk (Perkins Dr to Fourth Line Rd) 64
Glynn Avenue (Edith Avenue to Lola Street) 67
Marquis Avenue West (Mulberry Crescent North to Naskapi Drive North) 67
Walkley Road Bridge over the Southeast Transitway 70
Meath Street - Road, Sewer and Watermain Reconstruction 70
Rosebella Avenue watermain and Blossom Park West area traffic management 73
Trillium Multi-Use Pathway Phase II (Young Street to Carling Avenue) 77
Segregated Bike Lane Pilot Project 78
South Urban Community Pump Station Upgrades and Pressure Zone Changes 79
Rideau Valley Drive South Reconstruction 79
Richmond Forcemain Repairs and Modifications 79
Miscellaneous Surface Drainage Improvements - West - Constance Bay 79
Kanata West Pump Station and Forcemains 79
Foster Stormwater Management Facility 79
Columbus Avenue - Sharp Street to Lola Street 79
Churchill Avenue North Sewer Construction  79
South Nepean Collector Sewer - Phase 2 (Longfields Dr to Strandherd Dr) 79
Sandridge Road watermain replacement 79
Ottawa river outfalls rehabilitation master plan and class environmental assessment 79
Kinburn Side Road Storm Sewer and Roadway Reconstruction 79
Gilmour Street and Cartier Street Rehabilitation 79
West Transitway Extension (Bayshore Station to Moodie Drive) 79
Hunt Club Community to South Keys / Greenboro Transit Stations 79
Hospital Link and Cumberland Transitway Westerly Planning Study 79
Carp Snow Disposal Facility 79
Woodcrest Road (Kilborn Avenue West to Kilborn Avenue East) 79
Queen Street Renewal (Bronson Avenue to Elgin Street) 79
Mer Bleue Road Widening  79
Iris St - Road and Sidewalk Construction 79
Gladstone Reconstruction – Bank to Cartier 79
Brian Coburn Boulevard Extension, Navan Road to Mer Bleue Road 79
Renfrew Avenue, Imperial Avenue and Lyon Street 79
MacFarlane Road Paved Shoulders (Merivale Road to Deakin Street) 79
Jockvale Road Widening (Cambrian to Prince of Wales) 79
Minto Bridges East & Centre Rehabilitation 79
Prince of Wales Bridge Culvert Renewal (Fisher Avenue and Colonnade Road) 79
McIlraith Bridge Rehabilitation 79
Rideau River Western Pathway 79
New Multi-Use Pathway (Greenbank Road to Antler-Dolan Pedestrian Underpass) 79
Mackenzie Avenue Bike Tracks 79
Morrena Road Major Drainage Improvements 2
Construction notice (July 2016) 2
Morrena Road Major Drainage Improvements - Overview 32
Rockhurst Park 3
Iris Street - Road and Sidewalk Construction 79
Iris Street – Road and Sidewalk Construction – Overview 3
Seneca Street, Aylmer Avenue and Fulton Avenue et al Integrated Road, Sewer, and Water Project 4
Project commencement (August 2016) 4
Vancouver Avenue Watermain Rehabilitation (Bank Street to Notting Hill Avenue) 4
Construction notice - September 2014 79
Stagecoach Road Bridge Culvert Replacement 4
Construction notice (August 2016) 4
Project overview 38
Cycling projects 79
Planned 7
Underway 7
Bridges and Pathways 79
Under way 7
Planned 7
Site Alteration By-law Development 8
As we heard it report - Site Alteration By-law Development 8
Lakeview Terrace (Bronson Avenue to Queen Elizabeth Drive) 8
Construction notice – August 2016 8
Construction notice - July 2016 57
Public information session – February 3, 2016 79
Project Overview 79
Trillium Line Extension Planning and Environmental Assessment (EA) Study 9
Notice of Completion of Transit Project Assessment Process 67
What we heard - Comment Summary 156
Project overview 156
Open House - January 13 and 15, 2015 156
Trillium Line Spur Line Connection to the Ottawa Macdonald-Cartier International Airport 160
Notice of Commencement of Transit Project Assessment Process 160
Information Bulletin - September 2015 160
Official Plan: 2015 employment land review overview and timelines 9
Roadwork 79
Under way 9
Planned 64
MacFarlane Road Paved Shoulders 9
Bells Corners Community Improvement Plan 60
Project overview 9
Open house 60
2016 Culvert Renewal Program 31
2016 Culvert Renewal Program - Overview 9
Cleary and New Orchard Planning Study 37
As We Heard It – Public Meeting #1 – June 4, 2016 10
Public Meeting #1 – June 4, 2016 16
Cleary and New Orchard Planning Study 39
O'Connor Street Bikeway 53
Bi-Weekly Update 10
O'Connor Street Bikeway - Overview 70
Public Information Session - 7 March 2016 79
O’Connor Street Bikeway Fact Sheet - 7 March 2016 79
Open House Display Boards - 7 March 2016 79
Construction notice - June 2016 79
New Multi-Use Pathway 10
New Multi-Use Pathway from Greenbank Road to Antler-Dolan Pedestrian Underpass Pathway - March 2016 79
New Multi-Use Pathway (Greenbank Road to Antler-Dolan Pedestrian Underpass 79
Nepean Trail Functional Planning Study 11
Akerson Multi-Use Pathway Functional Planning Study 11
Building Better Connections 11
New growth projections for Ottawa to 2036 14
Land Evaluation and Area Review 160
Land Evaluation and Area Review 14
Official Plan Amendment: Setbacks from Railway Corridors 16
Kanata North Community Design Plan 16
Community meeting #4 - March 30, 2016 140
Community meeting #3 - February 26, 2014 160
Project Update - July 2015 160
Project Update – March 2015 160
Community Meeting #2 - October 24, 2013 160
Community Meeting #1/Notice of Commencement - June 26, 2013 160
Overview 160
Bank Street Renewal – Between Riverside Drive North and Ledbury Avenue 17
Urban Forest Management Plan 17
Elgin Street and Hawthorne Avenue Functional Design Study 17
Consultation summary 17
Public Design Workshop - June 28, 2016 28
Online questionnaires 28
Study schedule 35
Notice of project commencement 58
Elmvale Acres Shopping Centre Secondary Plan 18
Alta Vista Hospital Link 79
Construction information 21
Notices 52
Environmental study report 79
Open house display boards – 26 March 2014 79
Alta Vista Hospital Link – Project Overview 79
Harthill to Halley Link Multi-Use Pathway 22
Forest Valley Drive Area Traffic Management Study 22
Study Update 2016 22
Open House #2 - June 9, 2015 60
Open House #1 June 10, 2014 - Comment Summary 60
Forest Valley Drive Area Traffic Management Study - Overview 60
Beechwood Avenue Transportation Corridor 35
Project Update - July 2016 24
Project Overview 60
Open House – June 24, 2015 60
Open House - March 9, 2016 60
Viewmount Drive Area Traffic Management Study 29
Confederation Line West Light Rail Transit (LRT) Extension 36
Stage 2 Light Rail Transit (LRT) Connectivity Public Consultations 31
Notice of Commencement 84
100 Day Solution 156
Open House - April 29, 2015 160
Maintenance and Storage Facility 160
Consultation Lincoln Fields to Bayshore 160
Project overview 160
Consultation Bayview to Baseline – 2009 - 2013 160
Lyon Street and McLeod Street Rehabilitation 31
Road Closure Notice - Lyon Street and Gladstone Avenue Intersection - 2 August 2016 31
Road closure notice - June 2016 77
Notice of Public Information Session on 23 November 2015 79
Lyon Street and McLeod Street Rehabilitation - Overview 79
Construction Notice - May 2016 79
Boards from Public Information Session on 23 November 2015 79
2016 Trenchless Sewer Lining Program 31
2016 Trenchless Sewer Lining Program – Overview 31
Woodroffe Avenue Multi-Use Pathway Extension 32
Greenbank Road Widening (Malvern to Strandherd) 32
Public art for Greenbank Road 32
Updated - Night-time work Notice - August 2015 79
Night-time Work Notice – 28-29 March 2015 79
Greenbank Road Widening - Blasting Notice - April 20, 2015 79
Greenbank Road widening (Malvern to Strandherd) - Overview 79
Construction Notice (September 2014) 79
Road closure and overnight work notice - 22-23 August 2015 79
Road Closure and Overnight Work Notice - 16-17 April 2016 79
Overnight Work Planned for This Week Notice - 3 December 2015 79
Shefford Road multi-use pathway 32
Transportation Impact Assessment (TIA) Guidelines Review 35
Transportation Master Plan 36
development review and approval process 36
Official Plan 36
Navaho Drive and Albany Drive - Integrated Road, Sewer and Watermain Construction 36
Construction Notice - July 2016 36
What to Expect During Construction – Hand Out – June 2, 2016 79
Open House Notice – June 2, 2016 79
Open House Display Boards – June 2, 2016 79
Navaho Drive and Albany Drive - Overview 79
Richmond Road and Byron Corridor Studies 37
Byron Avenue Traffic Calming Design - Overview 60
Richmond Road Complete Street and Connectivity Studies 60
Edison – Princeton – Tillbury – Kenwood – Avondale 79
Edison – Princeton – Tillbury – Kenwood – Avondale - Overview 37
Open House Display Boards - 27 January 2014 79
Notice of Public Open House - January 27, 2014 79
Construction Update - Planned Activities for 2015 Notice (March 2015) 79
Construction notice update - July 2014 79
Columbus Avenue - Sharp Street to Lola Street 79
Columbus Avenue - Sharp Street to Lola Street - Overview 37
Project commencement – June 2015 79
Public information session – November 24, 2015 79
Construction notice - April 2016 79
Meath Street Road, Sewer and Watermain Reconstruction 73
Meath Street Road, Sewer & Watermain Reconstruction - Overview 37
Rockcliffe Park Northwest - Phase 2 – Construction Notice (April 2016) 37
Stewart Street (King Edward Avenue to Friel Street) 37
Construction notice (June 2016) 37
Stewart Street Greening Project 38
Tenth Line Road widening 38
Construction notice (July 2016) 38
Lyman Street and Mulvihill Avenue Reconstruction 43
Construction Notice - Mulvihill Avenue - July 2016 43
Construction Notice - Lyman Street - june 2016 43
Public Information Session Notice - 31 March 2016 79
Enbridge Gas Main Investigation Notice - March 2016 79
Water Services Handout - 31 March 2016 79
Public Information Session Boards - 31 March 2016 79
Lyman St and Mulvihill Ave Reconstruction - Overview 79
Rideau Canal Crossing (Fifth to Clegg) 43
Archaeological investigation work notice - July 2016 43
Preliminary Design Update - June 2016 77
Public Information Session - 4 February 2016 79
Public Information Session Boards - 4 February 2016 79
Key Facts - Public Open House 4 February 2016 79
Rideau Canal Crossing - Overview 79
Rideau Canal Crossing - Project History 79
Big Bird Park 44
Gladstone Reconstruction – Bank to Cartier 79
Open House Boards 45
Notice of Public Information Session 79
Gladstone Reconstruction – Overview 79
Construction Notice - September 2013 79
Road Closure - June 2014 79
Re-commencement Notice - April 2014 79
Main Street Renewal 59
Notices 46
Public art for Main Street 59
Open Houses 79
Construction information 79
Baseline and Woodroffe Stormwater Management Pond 93
Notice of study commencement 46
Sidewalk Patio Review Program 102
Encroachment By-law 2003-446 49
Permanent Signs on Private Property By-law Review 52
Temporary Signs on Private Property By-law 49
Signs on City Roads By-law 49
Permanent Signs on Private Property By-law 2005-439 49
Klondike Road Multi-Use Pathway 51
Road closure notice - July 2016 51
Klondike Road Multi-Use Pathway - Overview 79
Community Town Hall Information Meeting – January 20, 2016 79
Greenbank Road Watermain 52
Open House - March 21, 2016 60
Notice of Study Commencement 60
Innovation Park and Ride 53
Public art for the Innovation Park and Ride 52
Public information session – 24 September 2015 79
Public Information Session Boards - 24 September 2015 79
Innovation Park and Ride - Overview 79
Construction Notice - March 2016 79
Flood Plain Mapping – Phase 1 52
Westgate Shopping Centre Secondary Plan 53
Map 53
Planned Construction Program 2016-2020 - Projects by Ward 73
Sidewalks 53
Buildings and Parks 53
Underway 53
Planned 53
Lavergne, Jolliet, Montfort, Ste. Cecile, Ferland, Frechette, Hector-Hotte, Garneau, Ste. Monique, Perrier 53
River Lane and Crichton Street (Keefer to Dufferin) 58
Construction notice – June 2016 58
Public information session – September 22, 2015 79
Project Overview 79
Utility relocation notice - April 2016 79
Public information session - June 15, 2016 79
Crystal Beach Dr., Bedale Dr., Conniston Ave., Ullswater Dr., Hexam Rd., and Whitburn Cres. Sanitary Replacement 58
Construction notice – June 2016 58
Notice of New Sidewalk - November 2015 79
Information Session Boards - 26 November 2015 79
Information Session - 26 November 2015 79
Crystal Beach Dr., Bedale Dr., Conniston ave., Ullswater Dr., Hexam Rd., and Whitburn Cres. Sanitary Replacement - Overview 79
South March Highlands Conservation Forest Management Plan 160
Management Plan 59
Open House #2 Display boards (March 2009) 160
Open House #2 160
Eastern Subwatersheds Stormwater Management Retrofit Study 160
Frequently asked questions 59
Objectives 160
Online information session 160
Notice of study commencement and online information session 160
Overview 160
Trillium Multi-Use Pathway 77
Public Information Session - May 13, 2015 60
Phase 2 - Overview 79
Construction Notice – August 2015 79
Backflow Prevention Program Consultations: March 2016 60
North Island Link 60
Key study findings and evaluation of alternatives 60
June 7, 2016 - Public Presentation at the Manotick Village and Community Association Annual General Meeting 60
Project Overview 60
Wellington West Parking Study - Public Open House 60
Richmond Rd at Churchill Ave - Pedestrian Safety Improvements 60
Greenboro Neighbourhood Bikeway 60
Centrepointe Drive and Hemmingwood Way Area Traffic Management Study 60
Campeau Drive Proposed Multi-Use Pathway 60
Carp Road Widening Environmental Assessment 60
Statement of work 60
Open House #4 - June 24, 2015 60
Open House #3 - June 17, 2014 60
Open House #2 - February 26, 2014 60
Notice of Study Commencement 60
Notice of Completion and Filing of Environmental Study Report 60
First Open House - September 18, 2013 60
Background 60
Ottawa Road 174-Prescott-Russell County Road 17 Study 60
Update 2013 60
Round #1 of Public Open Houses 60
Synopsis of Study Design 60
Update 2014 60
Ottawa Road 174-Prescott-Russell County Road 17 Study - Overview 60
Notice of Completion of Environmental Study Report 60
Viseneau Drive and Barrington Street Area Traffic Management Study 60
Summary of Comments 60
Study Update 2016 60
Project overview 60
Open House #2 - December 9, 2014 60
Notice of study commencement - Open house May 6, 2014 60
Paul Anka Drive ATM Study 60
Public Open House #1 - May 1, 2014 60
Open House #2 - November 17, 2014 60
Glebe Neighbourhood Cycling Plan 60
Open House –June 25, 2014 60
Open House for the O’Connor Street Bikeway Functional Planning Study 60
Project Overview 60
Glebe Community Association Meeting – May 7, 2015 60
Craig Street / Percy Street / Fifth Avenue Intersection Public Meeting 60
Centretown Local Area Parking Study 60
Public Open House for Centretown Local Area Parking Study 60
Blossom Park West Area Traffic Management Study 60
Open House #2 - October 29, 2015 60
Open House # 1 - June 3, 2015 60
Grey Nuns Drive Area Traffic Management Study 60
Open House #2 - February 3, 2016 60
Open House #1 - October 7, 2015 60
Byron Avenue traffic calming design 60
Public meeting - June 16, 2016 60
Brittany Drive Localized Area Traffic Management Study 60
Open House #2 - June 2, 2016 60
Open House #1 - Thursday, April 21, 2016 60
Merkley Drive Localized Area Traffic Management Study 60
Open House #2 - June 9, 2016 60
Open House #1 - Thursday, April 28, 2016 60
Secondary Dwelling units in Accessory Structures Zoning Study 64
Roger Stevens Drive Sidewalk 64
Construction Notice - June 2016 64
Roger Stevens Drive Sidewalk - Overview 79
Preconstruction Notice - April 2016 79
2016 Sidewalk Program 64
Glynn Avenue (Edith Avenue to Lola Street) 67
Project overview 67
Rideau River Western Pathway 79
Rideau River Western Pathway - Overview 67
Open House #1 - June 12, 2013 79
Open House #2 - November 13, 2013 79
Marquis Avenue West (Mulberry Crescent North to Naskapi Drive North) 67
Project overview 67
Foster Stormwater Management Facility 79
Notice of Completion 69
Overall Site Plan 79
Location Plan 79
Foster Stormwater Management Facility - Overview 79
Environmental Assessment, Preliminary and Detailed Design 79
Technical Reports 79
Hospital Link and Cumberland Transitway Westerly Planning Study 79
Notice of Completion and 30 Day Public Review 69
Study background 79
Public Open House #1 Display boards 79
Hospital Link and Cumberland Transitway Westerly Planning Study - Project Overview 79
West Transitway Extension (Bayshore Station to Moodie Drive) 79
West Transitway Extension (Bayshore Station to Moodie Drive) - Project Overview 69
Public information session (June 2015) 79
Notices 79
Open houses 79
Zoning By-law Review: Minimum Parking Requirements 70
Minimum Parking Review: Final Zoning Proposals (New June 17, 2016) 70
Frequently Asked Questions 160
Comments on Discussion Paper #2: Draft Recommendations – Updated November 2, 2015 160
Comments on Discussion Paper #1: Updated October 21, 2015 160
Walkley Road Bridge over the Southeast Transitway 70
Construction notice – June 2016 70
Walkley Road Bridge over the Southeast Transitway – Overview 73
Night-time Work Notice - July 2015 79
Construction Notice - June 2015 79
Combined Sewage Storage Tunnel 160
Environmental Study Report (ESR) 71
Open House March/April 2009 160
Open House June 2010 160
Open House June 2012 160
Environmental Study Report (ESR) – Addendum – 3 April 2014 160
Project Overview 160
Rideau Street Renewal (Sussex Drive to Dalhousie Street) 71
Project Overview 71
Open house boards (24 February 2016) 71
Sandridge Road watermain replacement 79
Public information session – 13 June 2016 72
Project overview 79
Rosebella Avenue watermain and Blossom Park West area traffic management 73
Construction notice – June 2016 73
Project overview 77
Public information session – February 17, 2016 79
Flewellyn Special Study Area and Goulbourn Wetland Complex Re-evaluation 74
Churchill Avenue Rehabilitation 79
Current Construction (Carling Avenue to Princeton Avenue) 78
Open House Display Boards (16 October 2012) 79
Open House Display boards (May 24, 2012) 79
Project Contacts 79
Project Consultation Program 79
Municipal Class Environmental Assessment 79
Change in project scope 79
Project background 79
Public Service Announcement - 3 November 2014 79
Public art for Churchill Avenue 79
News 79
Notices 79
Kanata West Pump Station and Forcemains 79
Construction update and blasting notice - April 2016 78
Kanata West Pump Station and Forcemains - Overview 79
Notice of Construction - December 2015 79
Confederation Line East Light Rail Transit (LRT) Extension 155
Open Houses - February 3, 4 and 5, 2015 79
Open Houses - April 20, 21 and 23, 2015 79
Notice of Completion of Transit Project Assessment Process 155
Study Overview August 2014 160
Notice of Commencement of Transit Project Assessment Process 160
Highlights 160
  79
Snow Disposal Facilities 79
Planned 79
Woodcrest Road (Kilborn Avenue West to Kilborn Avenue East) 79
Mer Bleue Road Widening - Overview 79
Trim Road Widening and Realignment OR 174 to Innes Road 79
Trim Road Widening and Realignment OR 174 to Innes Road - Overview 79
Public art for Trim Road 79
Notices 79
Strandherd Drive Widening and Extension 79
Open House #4 Display boards 79
Open House #4 79
Open House #3 79
Open House #2 79
Open House #1 Display boards 79
Open House #1 79
Queen Street renewal 79
Queen Street renewal - Overview 79
Notice of public open house 79
Notice of Completion - May 2014 79
Open house boards (9 March 2016) 79
Notice to residents (7 April 2016) 79
Hunt Club Road Extension and Highway 417 Interchange 79
Notice of Project Commencement 79
Innes - Walkley - Hunt Club Connection and Hunt Club Road/Highway 417 Interchange 79
Dagmar Avenue, Baribeau Street, Marier Avenue and Hannah Street 79
Open house (June 4, 2014) 79
Project update - September 2014 79
Construction Notice - March 2015 79
Construction and temporary road closure notice – May 2016 79
Brian Coburn Boulevard Extension, Navan Road to Mer Bleue Road 79
Project Overview 79
Public information session – 23 March 2016 79
Construction notice – March 2016 79
Renewal of Prince of Wales Bridge Culvert 79
Renewal of Prince of Wales Bridge Culvert - Overview 79
Prince of Wales Bridge Culvert - Overnight Work - September 2015 79
Construction Notice – June 2015 79
Osborne Street, Ossington Avenue and Southern Drive 79
Project overview 79
Open house notice – March 2015 79
Construction notice – June 2015 79
Kanata South Link (Hope Side Road / Old Richmond Road / West Hunt Club Road Corridor) 79
Overview 79
Jockvale Road Widening (Cambrian to Prince of Wales) 79
Project Overview 79
Renfrew Avenue, Imperial Avenue and Lyon Street 79
Public information session – February 3, 2016 79
Project Overview 79
Cody Avenue, Cyr Avenue, Jeanne-Mance Street, Kendall Avenue, Levis Avenue and Savard Avenue 79
Project overview 79
Geotechnical borehole work (April 2016) 79
Cyrville Road Cycling and Pedestrian Facility Enhancements 79
St. Laurent Boulevard Cycling Lanes Feasibility Study Hemlock Street to Montreal Road 79
Open House No. 2 - Comment Summary 79
Open House No. 2 - June 17, 2015 79
Open House No. 1 - Comment Summary 79
Open House No. 1 - September 23, 2014 79
East-West Bikeway – Churchill Avenue to St. Laurent Boulevard 79
Open House 79
East West Bikeway Connection - New Multi-use Pathway 79
What we heard - Comment Summary, April 14 to May 14, 2014 79
Preliminary Functional Design 79
East West Bikeway Connection - New Multi-use Pathway - Overview 79
Mackenzie Avenue Bike Tracks 79
New Multi-Use Pathway (Greenbank Road to Antler-Dolan Pedestrian Underpass 79
O’Connor Street Bikeway Functional Planning Study 79
Rationale for Recommendations for O’Connor Street between Strathcona Avenue and Fifth Avenue 79
Project Status 79
Open House - April 9, 2015 79
Notice of study commencement and planning workshop 79
McIlraith Bridge Rehabilitation 79
Open houses – June 17th and June 18th, 2013 79
Construction Commencement Notice (June 2015) 79
McIlraith Bridge rehabilitation - Overview 79
Construction Notice (February 2015) 79
Pathway closure notice (November 2015) 79
Update on pedestrian and cycling pathway – March 2016 79
Minto Bridges East & Centre Rehabilitation 79
Construction commencement notice – July 2015 79
Construction commencement notice - February 2016 79
Trillium Multi-Use Pathway 79
Ottawa river outfalls rehabilitation master plan and class environmental assessment 79
Carlington Heights Pump Station Site Upgrade 79
Online open house – Preliminary preferred alternative 79
Notice of study commencement 79
Notice of completion 79
Barrhaven Pump Station Emergency Power Project 79
Notice of Completion 79
Class Environmental Assessment Study 79
Spencer Street Rehabilitation 79
Spencer Street Rehabilitation - Overview 79
Public Information Session Boards - 9 March 2016 79
Notice of Public Information Session - 9 March 2016 79
Construction notice - May 2016 79
South Nepean Collector Sewer Phase 2 (Longfields Drive to Strandherd Road) 79
South Nepean Collector Sewer Phase 2 - Overview 79
Open House Notice – 21 March 2016 79
Open House Handout - 21 March 2016 79
Open House Display Boards – 21 March 2016 79
Kinburn Side Road Storm Sewer and Roadway Reconstruction 79
Open House Notice – 17 May 2016 79
Open House Boards – 17 May 2016 79
Kinburn Side Road Storm Sewer and Roadway Reconstruction - Overview 79
Orléans Watermain Link 79
Orléans Watermain Link - Overview 79
Notices 79
Irving Place, Laurentian Place, Carling Ave, Oakvale Avenue, Lynwood Avenue 79
Open house display boards - 5 February 2014 79
Open House - February 5, 2014 79
Irving Place, Laurentian Place, Carling Ave, Oakvale Avenue, Lynwood Avenue - Overview 79
Construction Notice - Spring 2015 79
Sherry Lane, Brent Avenue and Cheryl Road Integrated 79
Open house – February 24, 2014 79
Sherry Lane, Brent Avenue and Cheryl Road Integrated - Overview 79
Recommencement of Construction Notice - April 2016 79
Recommencement of Construction - April 2015 79
Project update - May 2014 79
Notice of Construction - Update - September 2015 79
Construction notice - September 2014 79
Richmond Forcemain Repairs and Modifications 79
Richmond Forcemain Repairs and Modifications - Overview 79
Public Open House - April 21, 2015 79
Open House Display Boards - April 21, 2015 79
On-going Field Investigations - September 2015 79
On-going Field Investigations - March 2016 79
On-going Field Investigations - June 2015 79
On-going Field Investigations - February 2015 79
Commencement of Survey Work Notice - April 2015 79
Rideau Valley Drive South Reconstruction 79
Open House Display Boards - 27 November 2014 79
Open House - November 27, 2014 79
Road closure notice - 18 May 2016 79
Rideau Valley Drive South Reconstruction – Overview 79
Re-commencement notice - May 2016 79
Notice of Completion - May 2015 79
Construction Start Notice - September 2015 79
South Urban Community Pump Station Upgrades & Pressure Zone Changes 79
South Urban Community Pump Station Upgrades & Pressure Zone Changes - Overview 79
Open House Display Boards – April 8, 2015 79
Miscellaneous Surface Drainage Improvements West: Constance Bay 79
Miscellaneous Surface Drainage Improvements West: Constance Bay – Overview 79
Monahan Wetland Stormwater Facility Upgrade 79
Information and presentation - Tuesday, October 21, 2014 79
Frequently asked questions 79
Churchill Avenue North Sewer Construction 79
Churchill Avenue North Sewer Construction - Overview 79
Cumberland Transitway – Innes Road to Tenth Line Road 79
Hunt Club Community to South Keys / Greenboro Transit Stations 79
Open House #2 Display boards (December 2009) 79
Open House #2 (December 2009) 79
Open House #1 Display boards (June 2009) 79
Open House #1 (June 2009) 79
Notice of Study Completion 79
Notice of Study Commencement 79
Hunt Club Community to South Keys / Greenboro Transit Stations - Project Overview 79
Frequently asked questions 79
Cumberland Transitway - Recommended design east of Tenth Line Road to Frank Kenny Road 79
Cumberland Transitway recommended design 79
Cumberland Transitway - Project Overview 79
Cumberland Transitway - Trim Road to Frank Kenny Road 79
Open House Display boards - June 2010 79
Notice of completion of environmental project report 79
Notice of Commencement of Transit Project Assessment Process and Public Open House - Tuesday, June 11, 2013 79
Cumberland Transitway - Trim Road to Frank Kenny Road - Project Overview 79
Southwest Transitway Extension (Baseline Rd to Norice St) 79
Southwest Transitway Extension (Baseline Rd to Norice St) - Project Overview 79
Project team 79
Project schedule 79
Background information 79
Sandy Hill Heritage Conservation District Study Phase II 80
Leitrim Development Area - Updated Serviceability Report 86
Omnibus Zoning Amendments 93
Taxicab and Limousine Regulation and Service Review 101
ByWard Market George Street Plaza Renewal Information Session 106
Urban Expansion Study Area Kanata Highlands 126
Existing conditions and constraints analysis – December 2015 126
As We Heard It Report – December 8, 2015 126
Information meeting #1 - June 16, 2015 126
Project overview 126
Information Meeting # 2 - December 8, 2015 128
Terms of reference 128
As We Heard It Report – June 16, 2015 160
New Edinburgh Heritage Conservation District Plan 136
Stage 2 143
Cleary Station Information Session - April 14, 2016 143
Stage 2 - Overview 156
Open House - March 30, 2015 156
100 Day Working Group 156
Rockcliffe Park Heritage Conservation District Plan 143
Sawmill Creek Community Centre & Pool Expansion Plan Proposals 147
Richcraft Sensplex 147
Reid Park 147
McNabb Park 147
Gilbey Park 147
Facility Allocation Policy Review (Arenas, Sportfields and Ball Diamonds) 147
Dundonald Park 147
Ottawa River Outfalls Rehabilitation 150
Open House March 2013 150
Chapman Mills Extension and Bus Rapid Transit - Environmental Assessment Study 160
Open House #3 - March 21, 2016 150
Open House #1 - May 7, 2015 156
Project Overview 160
Open House #2 - September 28, 2015 160
Baseline Road Rapid Transit Corridor (Bayshore Station to Billings Bridge Station) Planning and Environmental Assessment Study 160
Background and Study Overview 160
Open House #3 - June 2, 2014 160
Open House No. 2 - Display Boards 160
Open House #2 - Tuesday, November 20th, 2012 160
Open House #1 - April 26, 2012 160
Chapel Hill Park and Ride Class Environmental Assessment 160
Notice of Commencement and Open House 160
Maintaining safety and harmony on city streets 160
Comment Sheet 160
Trim Road Works Yard - Information Session 160
Phase II - Clemow Estate Heritage Conservation District Study 160
Bloomfield Works Yard Expansion – Information Session 160
Zoning study on Residential Conversions 160
Zoning Study on Residential Conversions - Update August 2015 160
Preston-Carling District Community Design Plan 160
Timelines 160
Project overview 160
Draft Secondary Plan and Official Plan Amendment for Review 160
Secondary Plan Focus Group – May 2014 160
Secondary Plan Information Session - February 25, 2014 160
Secondary Plan Focus Group – February 2014 160
Public Realm and Mobility Study Information Session, December 2013 160
Public Realm and Mobility Study Focus Group – December 2013 160
Public Realm and Mobility Study Information Session, October 2013 160
Public Realm and Mobility Study Focus Group - October 2013 160
Public Realm and Mobility Study Focus Groups, August 2013 160
Notice of Adoption of an Official Plan Amendment 160
Approval of strategic directions, October 2012 to May 2013 160
Preston-Carling District Design Charette, September 2012 160
Mer Bleue Expansion Area Community Design Plan 160
Open House #4 – December 8, 2015 160
Project Update – March 2015 160
Community Workshop #3 - June 11, 2014 160
Community Workshop #2 - April 24, 2014 160
Community Workshop #1/Notice of Commencement - November 19, 2013 160
Mer Bleue Expansion Area Community Design Plan - Overview 160
Gladstone Station District Community Design Plan 160
Timelines - moving forward: 2013 – 2015 160
Study process 160
Advisory group meetings 160
Vision & Concept Options Report, January 2014 160
Project overview 160
Open house #3 - April 28, 2014 160
Open House #2 - March 1, 2014 160
Open House #1 - October 15, 2013 160
Draft Official Plan Amendment and Community Design Plan (CDP)for Review 160
  160
  160
East Urban Community Mixed Use Centre Community Design Plan 160
Open House #2 – October 14, 2014 160
Open House #2 - As We Heard It 160
Open house #1 - As we heard it 160
Notice of commencement - Open house #1 - June 26, 2014 160
East Urban Community Mixed Use Centre Community Design Plan - Overview 160
Preston Street North Traditional Mainstreet Study 160
Open House - May 11, 2015 160
Secondary Plan and Zoning By-Law Public Circulation Questions and Answers 160
Policy and Zoning Amendment Proposals for Comment 160
Proposed Policy and Zoning Options 160
Overview and Timelines 160
Density Index 160
Update - November 2014 160
June 2014 Information Sessions - Open House Display Boards 160
Introduction of Minimum Density Index Requirements Information Session - November 19, 2014 160
Density Index - Overview 160
Barrhaven South Expansion Study Area Community Design Plan 160
Project Overview 160
Open House - March 10, 2016 160
Pet Shop By-law Review 160
Kennedy-Burnett Stormwater Management Facility 160
Project Overview 160
Notice of Commencement 160
Open House - March 21, 2016 160
Alternatives Definition and Assessment 160
Jock River Reach 2 160
The Jock River Reach 2 Subwatershed Plan 160
Jock River Reach 2 - Overview 160
Feedmill Creek Subwatershed Management Study 160
Program Overview and Timelines 160
input received during the public consultations 484
St. Joseph Boulevard watermain 8
Construction notice (August 2016) 8
Geotechnical investigation notice (July 2016) 11
Project Overview 64
First Avenue Road, Sewer and Watermain Rehabilitation 79
Project overview 9
Information Session 79
Construction notice (Jun 2014) 79
Construction update (Jan 2015) 79
Construction notice (April 2015) 79
Tenth Line Road widening 79
Overview 10
Seneca-Aylmer-Fulton-Carlyle-Woodbine-Downing-Pansy 37
Jockvale Road Widening (Jockvale Rd to Cambrian Rd) 37
St. Laurent Blvd. (Industrial to Smyth) 79
Project overview 45
Public open house – December 2, 2015 79
Design and Environmental Assessment Study – Notice of Completion 79
Site Alteration By-law Development 46
Overview and Key Facts 46
Discussion Paper 46
Site Alteration By-law Development 46
MacFarlane Road Paved Shoulders 79
Overview of MacFarlane Road project 51
Riverside South Community Design Plan Update 80
Riverside South CDP 51
Riverside South Community Design Plan Update - Overview 160
Community Meeting #2 - September 21, 2015 160
Community Meeting #1 – March 12, 2015 160
Stewart Street Greening Project 51
Stewart Street Greening Project 51
Lavergne, Jolliet, Montfort, Ste. Cecile, Ferland, Frechette, Genest, Garneau, Ste. Monique 79
Project Overview 53
Public information session – 22 Jun 2016 53
Notice of project commencement - design 79
Feasibility Study for a Downtown Ottawa Truck Tunnel 60
Flood Plain Mapping – Phase 1 63
Mooney’s Bay Play Structure 63
Sidewalks 79
Underway 64
Planned 79
Trim Road Works Yard Development 79
Summerhill Park 79
OC Transpo Transit Control Center Renovation 79
François Dupuis Recreation Center Expansion 79
Crestview Change House and pool 79
Boothfield Park 79
Rockcliffe Park Reconstruction 79
Rockcliffe Park Northwest (Phase 1) – Open House – 6 May 2014 79
Rockcliffe Park East – Open House – 1 May 2014 79
Rockcliffe Park Northwest (Phase 2) – Open House – 16 April 2015 79
Notices 79
Rockcliffe Park East – Project Overview 79
Carling Avenue/Richmond Road - New WB Left Turn for Buses Only 79
Construction Notice - May 2014 79
Carling Avenue/Richmond Road - New WB Left Turn for Buses Only – Overview 79
Mark Avenue, Greensway Avenue, Coupal Street and Tudor Place 79
Open house (June 4, 2014) 79
Project update - September 2014 79
Construction Notice - March 2015 79
Construction and temporary road closure notice – May 2016 79
Farnham Crescent and Bedford Crescent 79
Construction start notice – September 2015 79
Construction notice - April 2016 79
Adàwe Crossing (formerly Rideau River Crossing) 79
Public art for Adàwe crossing 79
Open House – June 10, 2013 79
Multi-Use Pathway and Donald Street Reconstruction 79
Construction Notice - May 2015 79
Rex Ave, Kerr Ave, Ernest Ave, Denison Cres and Broadview Ave Integrated 79
Open House – January 29, 2014 79
Open House Display Boards - 29 January 2014 79
Rex Ave, Kerr Ave, Ernest Ave, Denison Cres and Broadview Ave Integrated - Overview 79
Recommencement of Construction Notice - April 2016 79
Private Water Services - July 2014 79
Open House Display Boards - 25 February 2015 79
Open House - February 25, 2015 79
Night work - August 2014 79
Construction Notice - May 2014 79
Construction Notice - April 2015 79
Banning Rd, Abbotsford Rd, Balbair Rd and Singal Street Integrated Road 79
Public open house - November 26, 2014 79
Project Information – August 2014 79
Open House Display Boards - November 26, 2014 79
Construction Notice - April 2015 79
Banning Rd,Abbotsford Rd, Balbair Rd and Singal Street Integrated Road - Overview 79
McRae Avenue Reconstruction 79
Public Information Session - 26 February, 2015 79
Open House Display Boards - February 26, 2015 79
McRae Avenue Reconstruction - Overview 79
Construction Notice - July 2015 79
Deer Park Road and Higwood Drive 79
Re-commencement of construction - May 2016 79
Deer Park Road and Higwood Drive - Overview 79
Construction Notice - April 2015 79
Fallowfield Watermain Upgrade 79
Temporary Road closure on Larkin Drive Notice - August 2015 79
Fallowfield Watermain Upgrade – Overview 79
Fallowfield Watermain Upgrade - Construction Notice - June 2015 79
Created by Kevin O'Donnell to make it easier to be part of the political conversation in Ottawa.