Consultation/Document Title Updated (days ago)
Baseline Road Rapid Transit Corridor (Bayshore Station to Billings Bridge Station) Planning and Environmental Assessment Study 4
Open House #4 - October 5, 2016 5
Open House #1 - April 26, 2012 25
Background and Study Overview 191
Open House #3 - June 2, 2014 191
Open House No. 2 - Display Boards 191
Open House #2 - Tuesday, November 20th, 2012 191
Official Plan: 2015 employment land review overview and timelines 4
New growth projections for Ottawa to 2036 4
Land Evaluation and Area Review 191
Land Evaluation and Area Review 4
Westgate Shopping Centre Secondary Plan 7
Healthy Trees - Healthy City: A Celebration of National Tree Day 7
Queen Elizabeth Driveway Crossing Enhancements 91
pedestrian crossover webpage. 7
Viewmount Drive Area Traffic Management Study 10
Elmvale Acres Shopping Centre Secondary Plan 10
Woodcrest Road (Kilborn Avenue West to Kilborn Avenue East) 11
Construction notice – March 2016 11
Construction and Infrastructure 11
Woodcrest Road (Kilborn Avenue West to Kilborn Avenue East) 11
Renfrew Avenue, Imperial Avenue and Lyon Street 12
McIlraith Bridge Rehabilitation 13
Crystal Beach - Bedale - Conniston - Ullswater - Hexam and Whitburn Sanitary Replacement 14
St. Laurent Blvd. (Industrial to Smyth) 17
2016 Culvert Renewal Program 19
Combined Sewage Storage Tunnel 24
Sandridge Road watermain replacement 28
O'Connor Street (Laurier Ave to Fifth Ave) New Bikeway Construction 28
St. Joseph Boulevard watermain repair (St. Jean Street to Champlain Street) 28
Iris St - Road and Sidewalk Construction 28
Morrena Road Major Drainage Improvements 33
Seneca Street, Aylmer Avenue and Fulton Avenue et al Integrated Road, Sewer, and Water Project 35
Stagecoach Road Bridge Culvert Replacement 35
St. Joseph Boulevard watermain repair (St. Jean Street to Champlain Street) 39
Lakeview Terrace (Bronson Avenue to Queen Elizabeth Drive) 39
Lyon Street (Florence to McLeod Streets) and McLeod Street (Lyon to Kent Streets) 62
Greenbank Road widening (Malvern to Strandherd) 63
Navaho Drive and Albany Drive - Integrated Road, Sewer and Watermain Construction 67
Southwest Transitway Extension (Baseline Road to Norice Street) 67
Rockcliffe Park Infrastructure Renewal 68
Cumberland Transitway – Recommended design east of Tenth Line Road to Frank Kenny Road 68
Stewart Street (King Edward Avenue to Friel Street) 68
Tenth Line Road Widening (Brian Coburn Blvd. to Harvest Valley Avenue) 69
Lyman Street and Mulvihill Avenue Reconstruction 74
Rideau Canal Crossing - Fifth to Clegg 74
Spencer Street Rehabilitation 76
Rideau Street Renewal (Sussex Drive to Dalhousie Street) 81
Klondike Road Multi-Use Pathway 82
Innovation Park and Ride 84
Lavergne, Jolliet, Montfort, Ste. Cecile, Ferland, Frechette, Hector-Hotte, Garneau, Ste. Monique, Perrier 84
River Lane and Crichton Street (Keefer to Dufferin) 89
Main Street Renewal 90
Mooney’s Bay Play Structure 94
Roger Stevens Drive Sidewalk (Perkins Dr to Fourth Line Rd) 95
2016 Sidewalk Program 95
Glynn Avenue (Edith Avenue to Lola Street) 98
Marquis Avenue West (Mulberry Crescent North to Naskapi Drive North) 98
Walkley Road Bridge over the Southeast Transitway 101
Meath Street - Road, Sewer and Watermain Reconstruction 101
Rosebella Avenue watermain and Blossom Park West area traffic management 104
Trillium Multi-Use Pathway Phase II (Young Street to Carling Avenue) 108
Segregated Bike Lane Pilot Project 109
South Urban Community Pump Station Upgrades and Pressure Zone Changes 110
Rideau Valley Drive South Reconstruction 110
Richmond Forcemain Repairs and Modifications 110
Miscellaneous Surface Drainage Improvements - West - Constance Bay 110
Kanata West Pump Station and Forcemains 110
Foster Stormwater Management Facility 110
Columbus Avenue - Sharp Street to Lola Street 110
Churchill Avenue North Sewer Construction  110
South Nepean Collector Sewer - Phase 2 (Longfields Dr to Strandherd Dr) 110
Ottawa river outfalls rehabilitation master plan and class environmental assessment 110
Kinburn Side Road Storm Sewer and Roadway Reconstruction 110
Gilmour Street and Cartier Street Rehabilitation 110
West Transitway Extension (Bayshore Station to Moodie Drive) 110
Hunt Club Community to South Keys / Greenboro Transit Stations 110
Hospital Link and Cumberland Transitway Westerly Planning Study 110
Carp Snow Disposal Facility 110
Woodcrest Road (Kilborn Avenue West to Kilborn Avenue East) 110
Queen Street Renewal (Bronson Avenue to Elgin Street) 110
Mer Bleue Road Widening  110
Gladstone Reconstruction – Bank to Cartier 110
Brian Coburn Boulevard Extension, Navan Road to Mer Bleue Road 110
MacFarlane Road Paved Shoulders (Merivale Road to Deakin Street) 110
Jockvale Road Widening (Cambrian to Prince of Wales) 110
Minto Bridges East & Centre Rehabilitation 110
Prince of Wales Bridge Culvert Renewal (Fisher Avenue and Colonnade Road) 110
Rideau River Western Pathway 110
New Multi-Use Pathway (Greenbank Road to Antler-Dolan Pedestrian Underpass) 110
Mackenzie Avenue Bike Tracks 110
Roadwork 110
Under way 11
Planned 95
Buildings and Parks 84
Underway 11
Planned 84
Marathon Park 12
Dunrobin Park 12
Renfrew Avenue, Imperial Avenue and Lyon Street 12
Project update – September 2016 12
Public information session – February 3, 2016 110
Project Overview 110
Preston-Carling District Community Design Plan 13
Timelines 191
Project overview 191
Draft Secondary Plan and Official Plan Amendment for Review 191
Secondary Plan Focus Group – May 2014 191
Secondary Plan Information Session - February 25, 2014 191
Secondary Plan Focus Group – February 2014 191
Public Realm and Mobility Study Information Session, December 2013 191
Public Realm and Mobility Study Focus Group – December 2013 191
Public Realm and Mobility Study Information Session, October 2013 191
Public Realm and Mobility Study Focus Group - October 2013 191
Public Realm and Mobility Study Focus Groups, August 2013 191
Notice of Adoption of an Official Plan Amendment 191
Approval of strategic directions, October 2012 to May 2013 191
Preston-Carling District Design Charette, September 2012 191
Rideau Canal Crossing (Fifth to Clegg) 74
Public Information Session - 4 February 2016 13
Key Facts - Public Open House 4 February 2016 13
Public Information Session Boards - 4 February 2016 13
Rideau Canal Crossing - Overview 13
Archaeological investigation work notice - July 2016 13
Preliminary Design Update - June 2016 108
Rideau Canal Crossing - Project History 110
McIlraith Bridge Rehabilitation 13
Traffic control on Riverside Drive and Noise By-Law exemption – September 2016 13
Open houses – June 17th and June 18th, 2013 110
Construction Commencement Notice (June 2015) 110
McIlraith Bridge rehabilitation - Overview 110
Construction Notice (February 2015) 110
Pathway closure notice (November 2015) 110
Update on pedestrian and cycling pathway – March 2016 110
Greenboro Neighbourhood Bikeway 14
Crystal Beach Dr., Bedale Dr., Conniston Ave., Ullswater Dr., Hexam Rd., and Whitburn Cres. Sanitary Replacement 14
Road closure notice – September 2016 14
Construction notice – June 2016 89
Notice of New Sidewalk - November 2015 110
Information Session Boards - 26 November 2015 110
Information Session - 26 November 2015 110
Crystal Beach Dr., Bedale Dr., Conniston ave., Ullswater Dr., Hexam Rd., and Whitburn Cres. Sanitary Replacement - Overview 110
O'Connor Street Bikeway 28
Bi-Weekly Update 14
O’Connor Street Bikeway Functional Planning Study 28
O'Connor Street Bikeway - Overview 101
Public Information Session - 7 March 2016 110
O’Connor Street Bikeway Fact Sheet - 7 March 2016 110
Open House Display Boards - 7 March 2016 110
Construction notice - June 2016 110
Confederation Line West Light Rail Transit (LRT) Extension 17
Consultation Lincoln Fields to Bayshore 25
Project overview 25
100 Day Solution 25
Consultation Bayview to Baseline – 2009 - 2013 25
Stage 2 Light Rail Transit (LRT) Connectivity Public Consultations 62
Notice of Commencement 115
Open House - April 29, 2015 191
Maintenance and Storage Facility 191
Stage 2 17
Information Sessions - Richmond Corridor Tunnel Update, Queensway Terrace North and Lincoln Fields 17
Cleary Station Information Session - April 14, 2016 174
Stage 2 - Overview 187
Open House - March 30, 2015 187
100 Day Working Group 187
Water, Wastewater and Stormwater Rate Structure Review 17
St. Laurent Blvd. (Industrial to Smyth) 17
Construction notice - September 2016 17
Sewers, water and wastewater 18
Under way 18
Planned 18
Crystal Beach Dr., Bedale Dr., Conniston Ave., Ullswater Dr., Hexam Rd., and Whitburn Cres. Sanitary Replacement 18
Transit 110
Under way 18
Planned 31
Bridges and Pathways 110
Under way 18
Planned 18
Secondary Dwelling units in Accessory Structures Zoning Study 19
2016 Culvert Renewal Program 19
Project commencement (September 2016) 19
Project commencement (August 2016) 20
2016 Culvert Renewal Program - Overview 27
Alta Vista Hospital Link 19
Construction information 19
Notices 83
Environmental study report 110
Open house display boards – 26 March 2014 110
Alta Vista Hospital Link – Project Overview 110
Iris Street - Road and Sidewalk Construction 28
Iris Street – Road and Sidewalk Construction – Overview 19
Construction notice (August 2016) 28
Elgin Street and Hawthorne Avenue Functional Design Study 20
Public Design Workshop - June 28, 2016 20
Online questionnaires 28
Consultation summary 48
Study schedule 66
Notice of project commencement 89
Project Background - CSST 24
Shefford Road multi-use pathway 24
Harthill to Halley Link Multi-Use Pathway 24
North Island Link 25
Key study findings and evaluation of alternatives 91
June 7, 2016 - Public Presentation at the Manotick Village and Community Association Annual General Meeting 91
Project Overview 91
Greenbank Road Watermain 25
Open House - March 21, 2016 91
Notice of Study Commencement 91
Carp Road Widening Environmental Assessment 25
Statement of work 91
Open House #4 - June 24, 2015 91
Open House #3 - June 17, 2014 91
Open House #2 - February 26, 2014 91
Notice of Study Commencement 91
Notice of Completion and Filing of Environmental Study Report 91
First Open House - September 18, 2013 91
Background 91
Ottawa Road 174-Prescott-Russell County Road 17 Study 25
Update 2013 91
Round #1 of Public Open Houses 91
Synopsis of Study Design 91
Update 2014 91
Ottawa Road 174-Prescott-Russell County Road 17 Study - Overview 91
Notice of Completion of Environmental Study Report 91
Viseneau Drive and Barrington Street Area Traffic Management Study 25
Summary of Comments 91
Study Update 2016 91
Project overview 91
Open House #2 - December 9, 2014 91
Notice of study commencement - Open house May 6, 2014 91
Paul Anka Drive ATM Study 25
Public Open House #1 - May 1, 2014 91
Open House #2 - November 17, 2014 91
Airport Parkway and Lester Road Widening 25
Notice of Study Completion and Filing of the Environmental Study Report 26
Project overview 91
Open House #3 - March 10, 2016 91
Open House #2 - June 17, 2015 91
Open House #1 - January 27, 2015 91
Notice of study commencement 91
Glebe Neighbourhood Cycling Plan 25
Open House –June 25, 2014 91
Open House for the O’Connor Street Bikeway Functional Planning Study 91
Project Overview 91
Glebe Community Association Meeting – May 7, 2015 91
Craig Street / Percy Street / Fifth Avenue Intersection Public Meeting 91
Forest Valley Drive Area Traffic Management Study 25
Study Update 2016 53
Open House #2 - June 9, 2015 91
Open House #1 June 10, 2014 - Comment Summary 91
Forest Valley Drive Area Traffic Management Study - Overview 91
Centretown Local Area Parking Study 25
Public Open House for Centretown Local Area Parking Study 91
Blossom Park West Area Traffic Management Study 25
Open House #2 - October 29, 2015 91
Open House # 1 - June 3, 2015 91
Beechwood Avenue Transportation Corridor 25
Project Update - August 2016 26
Project Overview 91
Open House – June 24, 2015 91
Open House - March 9, 2016 91
Grey Nuns Drive Area Traffic Management Study 25
Open House #2 - February 3, 2016 91
Open House #1 - October 7, 2015 91
Byron Avenue traffic calming design 25
Public meeting - June 16, 2016 91
Brittany Drive Localized Area Traffic Management Study 25
Open House #2 - June 2, 2016 91
Open House #1 - Thursday, April 21, 2016 91
Merkley Drive Localized Area Traffic Management Study 25
Open House #2 - June 9, 2016 91
Open House #1 - Thursday, April 28, 2016 91
Richmond Road and Byron Corridor Studies 25
Byron Avenue Traffic Calming Design - Overview 91
Richmond Road Complete Street and Connectivity Studies 91
Downtown Ottawa truck tunnel 25
Study Documents and Report to Transportation Committee 31
Overview of Downtown Ottawa Truck tunnel 39
Trillium Line Extension Planning and Environmental Assessment (EA) Study 25
Notice of Completion of Transit Project Assessment Process 98
What we heard - Comment Summary 187
Project overview 187
Open House - January 13 and 15, 2015 187
Trillium Line Spur Line Connection to the Ottawa Macdonald-Cartier International Airport 191
Notice of Commencement of Transit Project Assessment Process 191
Information Bulletin - September 2015 191
Chapman Mills Extension and Bus Rapid Transit - Environmental Assessment Study 25
Open House #3 - March 21, 2016 181
Open House #1 - May 7, 2015 187
Project Overview 191
Open House #2 - September 28, 2015 191
Confederation Line East Light Rail Transit (LRT) Extension 25
Open Houses - February 3, 4 and 5, 2015 110
Open Houses - April 20, 21 and 23, 2015 110
Notice of Completion of Transit Project Assessment Process 186
Study Overview August 2014 191
Notice of Commencement of Transit Project Assessment Process 191
Highlights 191
Chapel Hill Park and Ride Class Environmental Assessment 25
Notice of Commencement and Open House 191
West Transitway Extension (Bayshore Station to Moodie Drive) 25
Notices 25
Open houses 25
West Transitway Extension (Bayshore Station to Moodie Drive) - Project Overview 100
Public information session (June 2015) 110
Innovation Park and Ride 25
Public art for the Innovation Park and Ride 83
Public information session – 24 September 2015 110
Public Information Session Boards - 24 September 2015 110
Innovation Park and Ride - Overview 110
Construction Notice - March 2016 110
Southwest Transitway Extension (Baseline Rd to Norice St) 25
Southwest Transitway Extension (Baseline Rd to Norice St) - Project Overview 110
Project team 110
Project schedule 110
Background information 110
Hunt Club Community to South Keys / Greenboro Transit Stations 25
Open House #2 Display boards (December 2009) 110
Open House #2 (December 2009) 110
Open House #1 Display boards (June 2009) 110
Open House #1 (June 2009) 110
Notice of Study Completion 110
Notice of Study Commencement 110
Hunt Club Community to South Keys / Greenboro Transit Stations - Project Overview 110
Frequently asked questions 110
Hospital Link and Cumberland Transitway Westerly Planning Study 25
Notice of Completion and 30 Day Public Review 100
Study background 110
Public Open House #1 Display boards 110
Hospital Link and Cumberland Transitway Westerly Planning Study - Project Overview 110
Cumberland Transitway - Recommended design east of Tenth Line Road to Frank Kenny Road 25
Cumberland Transitway recommended design 110
Cumberland Transitway - Project Overview 110
Cumberland Transitway - Trim Road to Frank Kenny Road 25
Open House Display boards - June 2010 110
Notice of completion of environmental project report 110
Notice of Commencement of Transit Project Assessment Process and Public Open House - Tuesday, June 11, 2013 110
Cumberland Transitway - Trim Road to Frank Kenny Road - Project Overview 110
Roger Stevens Drive Sidewalk 25
Construction Notice - June 2016 95
Roger Stevens Drive Sidewalk - Overview 110
Preconstruction Notice - April 2016 110
Carlington Heights Pump Station Site Upgrade 25
Online open house – Preliminary preferred alternative 110
Notice of study commencement 110
Notice of completion 110
Barrhaven Pump Station Emergency Power Project 25
Notice of Completion 110
Class Environmental Assessment Study 110
Edison – Princeton – Tillbury – Kenwood – Avondale 25
Edison – Princeton – Tillbury – Kenwood – Avondale - Overview 68
Open House Display Boards - 27 January 2014 110
Notice of Public Open House - January 27, 2014 110
Construction Update - Planned Activities for 2015 Notice (March 2015) 110
Construction notice update - July 2014 110
Lavergne, Jolliet, Montfort, Ste. Cecile, Ferland, Frechette, Hector-Hotte, Garneau, Ste. Monique, Perrier 25
Lyon Street and McLeod Street Rehabilitation 25
Road Closure Notice - Lyon Street and Gladstone Avenue Intersection - 2 August 2016 62
Road closure notice - June 2016 108
Notice of Public Information Session on 23 November 2015 110
Lyon Street and McLeod Street Rehabilitation - Overview 110
Construction Notice - May 2016 110
Boards from Public Information Session on 23 November 2015 110
Morrena Road Major Drainage Improvements 25
Construction notice (July 2016) 33
Morrena Road Major Drainage Improvements - Overview 63
Lyman Street and Mulvihill Avenue Reconstruction 25
Construction Notice - Mulvihill Avenue - July 2016 74
Construction Notice - Lyman Street - june 2016 74
Public Information Session Notice - 31 March 2016 110
Enbridge Gas Main Investigation Notice - March 2016 110
Water Services Handout - 31 March 2016 110
Public Information Session Boards - 31 March 2016 110
Lyman St and Mulvihill Ave Reconstruction - Overview 110
Spencer Street Rehabilitation 25
Spencer Street Rehabilitation - Overview 110
Public Information Session Boards - 9 March 2016 110
Notice of Public Information Session - 9 March 2016 110
Construction notice - May 2016 110
South Nepean Collector Sewer Phase 2 (Longfields Drive to Strandherd Road) 25
South Nepean Collector Sewer Phase 2 - Overview 110
Open House Notice – 21 March 2016 110
Open House Handout - 21 March 2016 110
Open House Display Boards – 21 March 2016 110
Marquis Avenue West (Mulberry Crescent North to Naskapi Drive North) 25
Project overview 98
Kinburn Side Road Storm Sewer and Roadway Reconstruction 25
Open House Notice – 17 May 2016 110
Open House Boards – 17 May 2016 110
Kinburn Side Road Storm Sewer and Roadway Reconstruction - Overview 110
Glynn Avenue (Edith Avenue to Lola Street) 25
Project overview 98
Seneca Street, Aylmer Avenue and Fulton Avenue et al Integrated Road, Sewer, and Water Project 25
Project commencement (August 2016) 35
2016 Trenchless Sewer Lining Program 25
2016 Trenchless Sewer Lining Program – Overview 27
Sandridge Road watermain replacement 25
Construction notice – August 2016 28
Public information session – 13 June 2016 103
Project overview 110
Orléans Watermain Link 25
Notices 25
Orléans Watermain Link - Overview 110
Irving Place, Laurentian Place, Carling Ave, Oakvale Avenue, Lynwood Avenue 25
Open house display boards - 5 February 2014 110
Open House - February 5, 2014 110
Irving Place, Laurentian Place, Carling Ave, Oakvale Avenue, Lynwood Avenue - Overview 110
Construction Notice - Spring 2015 110
Churchill Avenue Rehabilitation 25
Notices 25
Current Construction (Carling Avenue to Princeton Avenue) 109
Open House Display Boards (16 October 2012) 110
Open House Display boards (May 24, 2012) 110
Project Contacts 110
Project Consultation Program 110
Municipal Class Environmental Assessment 110
Change in project scope 110
Project background 110
Public Service Announcement - 3 November 2014 110
Public art for Churchill Avenue 110
News 110
Sherry Lane, Brent Avenue and Cheryl Road Integrated 25
Open house – February 24, 2014 110
Sherry Lane, Brent Avenue and Cheryl Road Integrated - Overview 110
Recommencement of Construction Notice - April 2016 110
Recommencement of Construction - April 2015 110
Project update - May 2014 110
Notice of Construction - Update - September 2015 110
Construction notice - September 2014 110
Richmond Forcemain Repairs and Modifications 25
Richmond Forcemain Repairs and Modifications - Overview 110
Public Open House - April 21, 2015 110
Open House Display Boards - April 21, 2015 110
On-going Field Investigations - September 2015 110
On-going Field Investigations - March 2016 110
On-going Field Investigations - June 2015 110
On-going Field Investigations - February 2015 110
Commencement of Survey Work Notice - April 2015 110
Rideau Valley Drive South Reconstruction 25
Open House Display Boards - 27 November 2014 110
Open House - November 27, 2014 110
Road closure notice - 18 May 2016 110
Rideau Valley Drive South Reconstruction – Overview 110
Re-commencement notice - May 2016 110
Notice of Completion - May 2015 110
Construction Start Notice - September 2015 110
Vancouver Avenue Watermain Rehabilitation (Bank Street to Notting Hill Avenue) 25
Construction notice - September 2014 110
Columbus Avenue - Sharp Street to Lola Street 25
Columbus Avenue - Sharp Street to Lola Street - Overview 68
Project commencement – June 2015 110
Public information session – November 24, 2015 110
Construction notice - April 2016 110
South Urban Community Pump Station Upgrades & Pressure Zone Changes 25
South Urban Community Pump Station Upgrades & Pressure Zone Changes - Overview 110
Open House Display Boards – April 8, 2015 110
Miscellaneous Surface Drainage Improvements West: Constance Bay 25
Miscellaneous Surface Drainage Improvements West: Constance Bay – Overview 110
Foster Stormwater Management Facility 25
Technical Reports 25
Notice of Completion 100
Overall Site Plan 110
Location Plan 110
Foster Stormwater Management Facility - Overview 110
Environmental Assessment, Preliminary and Detailed Design 110
Rosebella Avenue watermain and Blossom Park West area traffic management 25
Construction notice – June 2016 104
Project overview 108
Public information session – February 17, 2016 110
Monahan Wetland Stormwater Facility Upgrade 25
Information and presentation - Tuesday, October 21, 2014 110
Frequently asked questions 110
Meath Street Road, Sewer and Watermain Reconstruction 25
Meath Street Road, Sewer & Watermain Reconstruction - Overview 68
Kanata West Pump Station and Forcemains 25
Construction update and blasting notice - April 2016 109
Kanata West Pump Station and Forcemains - Overview 110
Notice of Construction - December 2015 110
Churchill Avenue North Sewer Construction 25
Churchill Avenue North Sewer Construction - Overview 110
St. Joseph Boulevard watermain 25
Navaho Drive and Albany Drive - Integrated Road, Sewer and Watermain Construction 25
Construction Notice - July 2016 67
What to Expect During Construction – Hand Out – June 2, 2016 110
Open House Notice – June 2, 2016 110
Open House Display Boards – June 2, 2016 110
Navaho Drive and Albany Drive - Overview 110
Ottawa River Outfalls Rehabilitation 25
Open House March 2013 181
Residential Fourth Density (R4) Zoning Review 26
Cycling projects 110
Planned 26
Underway 28
Campeau Drive Proposed Multi-Use Pathway 28
Street Name and Address Changes 32
Street Name and Address Changes - Update August 2016 28
Frequently Asked Questions 134
Available Commemorative Street Names 146
Change of Address Checklist 189
Criteria for Street Naming 189
Have your say! 191
Street Name and Address Changes - Overview 191
Rockhurst Park 34
Stagecoach Road Bridge Culvert Replacement 35
Construction notice (August 2016) 35
Project overview 69
Site Alteration By-law Development 39
As we heard it report - Site Alteration By-law Development 39
Lakeview Terrace (Bronson Avenue to Queen Elizabeth Drive) 39
Construction notice – August 2016 39
Construction notice - July 2016 88
Public information session – February 3, 2016 110
Project Overview 110
MacFarlane Road Paved Shoulders 40
Bells Corners Community Improvement Plan 91
Project overview 40
Open house 91
Cleary and New Orchard Planning Study 68
As We Heard It – Public Meeting #1 – June 4, 2016 41
Public Meeting #1 – June 4, 2016 47
Cleary and New Orchard Planning Study 70
New Multi-Use Pathway 41
New Multi-Use Pathway from Greenbank Road to Antler-Dolan Pedestrian Underpass Pathway - March 2016 110
New Multi-Use Pathway (Greenbank Road to Antler-Dolan Pedestrian Underpass 110
Nepean Trail Functional Planning Study 42
Akerson Multi-Use Pathway Functional Planning Study 42
Building Better Connections 42
Official Plan Amendment: Setbacks from Railway Corridors 47
Kanata North Community Design Plan 47
Community meeting #4 - March 30, 2016 171
Community meeting #3 - February 26, 2014 191
Project Update - July 2015 191
Project Update – March 2015 191
Community Meeting #2 - October 24, 2013 191
Community Meeting #1/Notice of Commencement - June 26, 2013 191
Overview 191
Bank Street Renewal – Between Riverside Drive North and Ledbury Avenue 48
Urban Forest Management Plan 48
Woodroffe Avenue Multi-Use Pathway Extension 63
Greenbank Road Widening (Malvern to Strandherd) 63
Public art for Greenbank Road 63
Updated - Night-time work Notice - August 2015 110
Night-time Work Notice – 28-29 March 2015 110
Greenbank Road Widening - Blasting Notice - April 20, 2015 110
Greenbank Road widening (Malvern to Strandherd) - Overview 110
Construction Notice (September 2014) 110
Road closure and overnight work notice - 22-23 August 2015 110
Road Closure and Overnight Work Notice - 16-17 April 2016 110
Overnight Work Planned for This Week Notice - 3 December 2015 110
Transportation Impact Assessment (TIA) Guidelines Review 66
Transportation Master Plan 67
development review and approval process 67
Official Plan 67
Rockcliffe Park Northwest - Phase 2 – Construction Notice (April 2016) 68
Stewart Street (King Edward Avenue to Friel Street) 68
Construction notice (June 2016) 68
Stewart Street Greening Project 69
Tenth Line Road widening 69
Construction notice (July 2016) 69
Big Bird Park 75
Gladstone Reconstruction – Bank to Cartier 110
Open House Boards 76
Notice of Public Information Session 110
Gladstone Reconstruction – Overview 110
Construction Notice - September 2013 110
Road Closure - June 2014 110
Re-commencement Notice - April 2014 110
Main Street Renewal 90
Notices 77
Public art for Main Street 90
Open Houses 110
Construction information 110
Baseline and Woodroffe Stormwater Management Pond 124
Notice of study commencement 77
Sidewalk Patio Review Program 133
Encroachment By-law 2003-446 80
Permanent Signs on Private Property By-law Review 83
Temporary Signs on Private Property By-law 80
Signs on City Roads By-law 80
Permanent Signs on Private Property By-law 2005-439 80
Klondike Road Multi-Use Pathway 82
Road closure notice - July 2016 82
Klondike Road Multi-Use Pathway - Overview 110
Community Town Hall Information Meeting – January 20, 2016 110
Flood Plain Mapping – Phase 1 83
Map 84
Planned Construction Program 2016-2020 - Projects by Ward 104
Sidewalks 84
River Lane and Crichton Street (Keefer to Dufferin) 89
Construction notice – June 2016 89
Public information session – September 22, 2015 110
Project Overview 110
Utility relocation notice - April 2016 110
Public information session - June 15, 2016 110
South March Highlands Conservation Forest Management Plan 191
Management Plan 90
Open House #2 Display boards (March 2009) 191
Open House #2 191
Eastern Subwatersheds Stormwater Management Retrofit Study 191
Frequently asked questions 90
Objectives 191
Online information session 191
Notice of study commencement and online information session 191
Overview 191
Trillium Multi-Use Pathway 108
Public Information Session - May 13, 2015 91
Phase 2 - Overview 110
Construction Notice – August 2015 110
Wellington West Parking Study - Public Open House 91
Richmond Rd at Churchill Ave - Pedestrian Safety Improvements 91
Centrepointe Drive and Hemmingwood Way Area Traffic Management Study 91
2016 Sidewalk Program 95
Rideau River Western Pathway 110
Rideau River Western Pathway - Overview 98
Open House #1 - June 12, 2013 110
Open House #2 - November 13, 2013 110
Zoning By-law Review: Minimum Parking Requirements 101
Minimum Parking Review: Final Zoning Proposals (New June 17, 2016) 101
Frequently Asked Questions 191
Comments on Discussion Paper #2: Draft Recommendations – Updated November 2, 2015 191
Comments on Discussion Paper #1: Updated October 21, 2015 191
Walkley Road Bridge over the Southeast Transitway 101
Construction notice – June 2016 101
Walkley Road Bridge over the Southeast Transitway – Overview 104
Night-time Work Notice - July 2015 110
Construction Notice - June 2015 110
Rideau Street Renewal (Sussex Drive to Dalhousie Street) 102
Project Overview 102
Open house boards (24 February 2016) 102
Flewellyn Special Study Area and Goulbourn Wetland Complex Re-evaluation 105
  110
Snow Disposal Facilities 110
Planned 110
Mer Bleue Road Widening - Overview 110
Trim Road Widening and Realignment OR 174 to Innes Road 110
Trim Road Widening and Realignment OR 174 to Innes Road - Overview 110
Public art for Trim Road 110
Notices 110
Strandherd Drive Widening and Extension 110
Open House #4 Display boards 110
Open House #4 110
Open House #3 110
Open House #2 110
Open House #1 Display boards 110
Open House #1 110
Queen Street renewal 110
Queen Street renewal - Overview 110
Notice of public open house 110
Notice of Completion - May 2014 110
Open house boards (9 March 2016) 110
Notice to residents (7 April 2016) 110
Hunt Club Road Extension and Highway 417 Interchange 110
Notice of Project Commencement 110
Innes - Walkley - Hunt Club Connection and Hunt Club Road/Highway 417 Interchange 110
Dagmar Avenue, Baribeau Street, Marier Avenue and Hannah Street 110
Open house (June 4, 2014) 110
Project update - September 2014 110
Construction Notice - March 2015 110
Construction and temporary road closure notice – May 2016 110
Brian Coburn Boulevard Extension, Navan Road to Mer Bleue Road 110
Project Overview 110
Public information session – 23 March 2016 110
Construction notice – March 2016 110
Renewal of Prince of Wales Bridge Culvert 110
Renewal of Prince of Wales Bridge Culvert - Overview 110
Prince of Wales Bridge Culvert - Overnight Work - September 2015 110
Construction Notice – June 2015 110
Osborne Street, Ossington Avenue and Southern Drive 110
Project overview 110
Open house notice – March 2015 110
Construction notice – June 2015 110
Kanata South Link (Hope Side Road / Old Richmond Road / West Hunt Club Road Corridor) 110
Overview 110
Jockvale Road Widening (Cambrian to Prince of Wales) 110
Project Overview 110
Cody Avenue, Cyr Avenue, Jeanne-Mance Street, Kendall Avenue, Levis Avenue and Savard Avenue 110
Project overview 110
Geotechnical borehole work (April 2016) 110
Cyrville Road Cycling and Pedestrian Facility Enhancements 110
St. Laurent Boulevard Cycling Lanes Feasibility Study Hemlock Street to Montreal Road 110
Open House No. 2 - Comment Summary 110
Open House No. 2 - June 17, 2015 110
Open House No. 1 - Comment Summary 110
Open House No. 1 - September 23, 2014 110
East-West Bikeway – Churchill Avenue to St. Laurent Boulevard 110
Open House 110
East West Bikeway Connection - New Multi-use Pathway 110
What we heard - Comment Summary, April 14 to May 14, 2014 110
Preliminary Functional Design 110
East West Bikeway Connection - New Multi-use Pathway - Overview 110
Mackenzie Avenue Bike Tracks 110
New Multi-Use Pathway (Greenbank Road to Antler-Dolan Pedestrian Underpass 110
Minto Bridges East & Centre Rehabilitation 110
Construction commencement notice – July 2015 110
Construction commencement notice - February 2016 110
Trillium Multi-Use Pathway 110
Ottawa river outfalls rehabilitation master plan and class environmental assessment 110
Cumberland Transitway – Innes Road to Tenth Line Road 110
Sandy Hill Heritage Conservation District Study Phase II 111
Leitrim Development Area - Updated Serviceability Report 117
Omnibus Zoning Amendments 124
Taxicab and Limousine Regulation and Service Review 132
ByWard Market George Street Plaza Renewal Information Session 137
Urban Expansion Study Area Kanata Highlands 157
Existing conditions and constraints analysis – December 2015 157
As We Heard It Report – December 8, 2015 157
Information meeting #1 - June 16, 2015 157
Project overview 157
Information Meeting # 2 - December 8, 2015 159
Terms of reference 159
As We Heard It Report – June 16, 2015 191
New Edinburgh Heritage Conservation District Plan 167
Rockcliffe Park Heritage Conservation District Plan 174
Sawmill Creek Community Centre & Pool Expansion Plan Proposals 178
Richcraft Sensplex 178
Reid Park 178
McNabb Park 178
Gilbey Park 178
Facility Allocation Policy Review (Arenas, Sportfields and Ball Diamonds) 178
Dundonald Park 178
Maintaining safety and harmony on city streets 191
Comment Sheet 191
Trim Road Works Yard - Information Session 191
Phase II - Clemow Estate Heritage Conservation District Study 191
Bloomfield Works Yard Expansion – Information Session 191
Zoning study on Residential Conversions 191
Zoning Study on Residential Conversions - Update August 2015 191
Mer Bleue Expansion Area Community Design Plan 191
Open House #4 – December 8, 2015 191
Project Update – March 2015 191
Community Workshop #3 - June 11, 2014 191
Community Workshop #2 - April 24, 2014 191
Community Workshop #1/Notice of Commencement - November 19, 2013 191
Mer Bleue Expansion Area Community Design Plan - Overview 191
Gladstone Station District Community Design Plan 191
Timelines - moving forward: 2013 – 2015 191
Study process 191
Advisory group meetings 191
Vision & Concept Options Report, January 2014 191
Project overview 191
Open house #3 - April 28, 2014 191
Open House #2 - March 1, 2014 191
Open House #1 - October 15, 2013 191
Draft Official Plan Amendment and Community Design Plan (CDP)for Review 191
  191
  191
East Urban Community Mixed Use Centre Community Design Plan 191
Open House #2 – October 14, 2014 191
Open House #2 - As We Heard It 191
Open house #1 - As we heard it 191
Notice of commencement - Open house #1 - June 26, 2014 191
East Urban Community Mixed Use Centre Community Design Plan - Overview 191
Preston Street North Traditional Mainstreet Study 191
Open House - May 11, 2015 191
Secondary Plan and Zoning By-Law Public Circulation Questions and Answers 191
Policy and Zoning Amendment Proposals for Comment 191
Proposed Policy and Zoning Options 191
Overview and Timelines 191
Density Index 191
Update - November 2014 191
June 2014 Information Sessions - Open House Display Boards 191
Introduction of Minimum Density Index Requirements Information Session - November 19, 2014 191
Density Index - Overview 191
Barrhaven South Expansion Study Area Community Design Plan 191
Project Overview 191
Open House - March 10, 2016 191
Pet Shop By-law Review 191
Kennedy-Burnett Stormwater Management Facility 191
Project Overview 191
Notice of Commencement 191
Open House - March 21, 2016 191
Alternatives Definition and Assessment 191
Jock River Reach 2 191
The Jock River Reach 2 Subwatershed Plan 191
Jock River Reach 2 - Overview 191
Feedmill Creek Subwatershed Management Study 191
Program Overview and Timelines 191
input received during the public consultations 515
Combined Sewage Storage Tunnel 191
Project Overview 14
Environmental Study Report (ESR) 102
Open House March/April 2009 191
Open House June 2010 191
Open House June 2012 191
Environmental Study Report (ESR) – Addendum – 3 April 2014 191
St. Joseph Boulevard watermain 39
Construction notice (August 2016) 39
Geotechnical investigation notice (July 2016) 42
Project Overview 95
First Avenue Road, Sewer and Watermain Rehabilitation 110
Project overview 40
Information Session 110
Construction notice (Jun 2014) 110
Construction update (Jan 2015) 110
Construction notice (April 2015) 110
Tenth Line Road widening 110
Overview 41
Seneca-Aylmer-Fulton-Carlyle-Woodbine-Downing-Pansy 68
Jockvale Road Widening (Jockvale Rd to Cambrian Rd) 68
St. Laurent Blvd. (Industrial to Smyth) 110
Project overview 76
Public open house – December 2, 2015 110
Design and Environmental Assessment Study – Notice of Completion 110
Site Alteration By-law Development 77
Overview and Key Facts 77
Discussion Paper 77
Site Alteration By-law Development 77
MacFarlane Road Paved Shoulders 110
Overview of MacFarlane Road project 82
Riverside South Community Design Plan Update 111
Riverside South CDP 82
Riverside South Community Design Plan Update - Overview 191
Community Meeting #2 - September 21, 2015 191
Community Meeting #1 – March 12, 2015 191
Stewart Street Greening Project 82
Stewart Street Greening Project 82
Lavergne, Jolliet, Montfort, Ste. Cecile, Ferland, Frechette, Genest, Garneau, Ste. Monique 110
Project Overview 84
Public information session – 22 Jun 2016 84
Notice of project commencement - design 110
Backflow Prevention Program Consultations: March 2016 91
Feasibility Study for a Downtown Ottawa Truck Tunnel 91
Flood Plain Mapping – Phase 1 94
Mooney’s Bay Play Structure 94
Sidewalks 110
Underway 95
Planned 110
Trim Road Works Yard Development 110
Summerhill Park 110
OC Transpo Transit Control Center Renovation 110
François Dupuis Recreation Center Expansion 110
Crestview Change House and pool 110
Boothfield Park 110
Woodcrest Road (Kilborn Avenue West to Kilborn Avenue East) 110
Rockcliffe Park Reconstruction 110
Rockcliffe Park Northwest (Phase 1) – Open House – 6 May 2014 110
Rockcliffe Park East – Open House – 1 May 2014 110
Rockcliffe Park Northwest (Phase 2) – Open House – 16 April 2015 110
Notices 110
Rockcliffe Park East – Project Overview 110
Carling Avenue/Richmond Road - New WB Left Turn for Buses Only 110
Construction Notice - May 2014 110
Carling Avenue/Richmond Road - New WB Left Turn for Buses Only – Overview 110
Mark Avenue, Greensway Avenue, Coupal Street and Tudor Place 110
Open house (June 4, 2014) 110
Project update - September 2014 110
Construction Notice - March 2015 110
Construction and temporary road closure notice – May 2016 110
Farnham Crescent and Bedford Crescent 110
Construction start notice – September 2015 110
Construction notice - April 2016 110
O’Connor Street Bikeway Functional Planning Study 110
Rationale for Recommendations for O’Connor Street between Strathcona Avenue and Fifth Avenue 110
Project Status 110
Open House - April 9, 2015 110
Notice of study commencement and planning workshop 110
Adàwe Crossing (formerly Rideau River Crossing) 110
Public art for Adàwe crossing 110
Open House – June 10, 2013 110
Multi-Use Pathway and Donald Street Reconstruction 110
Construction Notice - May 2015 110
Rex Ave, Kerr Ave, Ernest Ave, Denison Cres and Broadview Ave Integrated 110
Open House – January 29, 2014 110
Open House Display Boards - 29 January 2014 110
Rex Ave, Kerr Ave, Ernest Ave, Denison Cres and Broadview Ave Integrated - Overview 110
Recommencement of Construction Notice - April 2016 110
Private Water Services - July 2014 110
Open House Display Boards - 25 February 2015 110
Open House - February 25, 2015 110
Night work - August 2014 110
Construction Notice - May 2014 110
Construction Notice - April 2015 110
Banning Rd, Abbotsford Rd, Balbair Rd and Singal Street Integrated Road 110
Public open house - November 26, 2014 110
Project Information – August 2014 110
Open House Display Boards - November 26, 2014 110
Construction Notice - April 2015 110
Banning Rd,Abbotsford Rd, Balbair Rd and Singal Street Integrated Road - Overview 110
McRae Avenue Reconstruction 110
Public Information Session - 26 February, 2015 110
Open House Display Boards - February 26, 2015 110
McRae Avenue Reconstruction - Overview 110
Construction Notice - July 2015 110
Deer Park Road and Higwood Drive 110
Re-commencement of construction - May 2016 110
Deer Park Road and Higwood Drive - Overview 110
Construction Notice - April 2015 110
Fallowfield Watermain Upgrade 110
Temporary Road closure on Larkin Drive Notice - August 2015 110
Fallowfield Watermain Upgrade – Overview 110
Fallowfield Watermain Upgrade - Construction Notice - June 2015 110
Created by Kevin O'Donnell to make it easier to be part of the political conversation in Ottawa.
On Twitter? Follow @OttWatch and @ODonnell_K